| $286,000 |
| $325,000 |
| $260,000 |
| $57,900 |
| $84,850 |
| $105,300 |
| $130,750 |
| $29,550 |
| $170,150 |
| $97,500 |
| $50,000 |
| $105,300 |
| $131,900 |
| $70,000 |
| $97,500 |
| $41,200 |
| $102,700 |
| $88,600 |
| $77,777,777 |
| $150,900 |
| $50,000 |
| $89,500 |
| $143,000 |
| $3,042 |
| $364,000 |
| $130,000 |
| $102,700 |
| $112,550 |
| $260,000 |
| $75,600 |
| $97,500 |
| $156,000 |
| $125,500 |
| $28,250 |
| $42,300 |
| $82,900 |
| $336,000 |
| $779,000 |
| $49,150 |
| $46,000 |
| $97,250 |
| $7,600,000 |
| $73,000 |
| $149,900 |
| $81,500 |
| $143,300 |
| $97,000 |
| $1,346,500 |
| $126,000 |
| $50,700 |
| $27,500 |
| $87,850 |
| $423,000 |
| $269,000 |
| $139,700 |
| $178,500 |
| $1,469,000 |
| $78,000 |
| $91,900 |
| $445,300 |
| $13,270,000 |
| $98,000 |
| $735,000 |
| $935,000 |
| $223,500 |
| $269,000 |
| $2,535,000 |
| $1,427,500 |
| $104,000 |
| $269,000 |
| $195,000 |
| $12,350,000 |
| $2,650,000 |
| $1,985,460,466 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 2 | 1,199,995 | 2,399,990 |
Hora de ingeniero | 64.7214 | 37,082 | 2,399,990 |
Puente, diseño estructural x 1 m2 | 244 | 246,975 | 60,261,973 |
Salario diario vigente | 1390.8 | 43,329 | 60,261,973 |
Valor Adicional: | 62,661,963 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero galvanizado G-50 tipo perfil x 1 Kg | 97200 | 13,181 | 1,281,193,200 |
Soldador mano de obra x hora | 17500 | 16,640 | 291,200,000 |
Salario mínimo mensual vigente, base | 224 | 1,300,000 | 291,200,000 |
Valor Adicional: | 1,572,393,200 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 30 | 533,055 | 15,991,658 |
Arena lavada de río 1 m3 | 17.64 | 95,019 | 1,676,135 |
Cemento 1 Kg | 11025 | 798 | 8,797,950 |
Triturado de 3/4" x 1 m3 | 26.46 | 150,500 | 3,982,230 |
Agua para la obra 1 litro | 5985 | 36 | 217,854 |
Mezcladora 1 bulto, alquiler x hora | 14.4 | 7,150 | 102,960 |
Cuadrilla 7 (8 obreros) x jornal | 2.1 | 578,347 | 1,214,529 |
Acero G-60 x 1 Kg | 26000 | 5,200 | 135,200,000 |
Valor Adicional: | 151,191,658 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 1000 | 10,038 | 10,037,646 |
Cuerda de Nylon 100 m x 0,50 mm | 50 | 50,900 | 2,545,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 500 | 6,100 | 3,050,000 |
| 10 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 16.4 | 24,504 | 401,872 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 164.9 | 24,504 | 4,040,774 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 8 | 4,147,000 | 33,176,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 24 | 650,000 | 15,600,000 |
Ensayo SPT | 8 | 247,000 | 1,976,000 |
Informe Geotécnico y recomendaciones de construcción | 8 | 1,950,000 | 15,600,000 |
Valor Adicional: | 43,213,646 |
| $0 |
| $49,700 |
| $185,000 |
| $447,000 |
| $140,000 |
| $2,168,000 |
| $650,000 |
| $146,875 |
| $830,000 |
| $256,000 |
| $1,550,000 |
| $418,000 |
| $1,527,450 |
| $49,900 |
| $457,000 |
| $12,843,900 |
| $143,918,734 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo de 30 plantas y 24495 m2, presupuesto de construcción | 0.0044907124 | 32,048,085,296 | 143,918,734 |
Terreno, predio, lote precio por 1m2 | 28.74055936 | 1,000,000 | 28,740,559 |
Levantamiento topográfico hasta 1,000 m2 | 0.022453562 | 2,600,000 | 58,379 |
Replanteo Arquitectónico X 1 m2 | 110.000000238 | 10,038 | 1,104,141 |
Diseño arquitectónico de edificios x 1 m2 | 110.000000238 | 14,000 | 1,540,000 |
Estudio de suelos y geotecnia desde | 0.044907124 | 4,147,000 | 186,230 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 110.000000238 | 10,400 | 1,144,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 110.000000238 | 13,520 | 1,487,200 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 110.000000238 | 16,000 | 1,760,000 |
Excavación mecánica en conglomerado x 1 m3 | 94.9516229856 | 4,551 | 432,149 |
Piloteadora, alquiler por Hora | 0.359256992 | 390,000 | 140,110 |
Acero G-60 x 1 Kg | 5529.4276502572 | 5,200 | 28,753,024 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 28.7001429484 | 533,055 | 15,298,762 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4.4907124 | 858,441 | 3,855,010 |
Kit Mueble para baño + lavamanos | 1.616656464 | 484,450 | 783,189 |
Punto agua fria PVC 1/2" | 9.699938784 | 44,047 | 427,248 |
Tubo 1" x 6 m RDE 13.5 | 8.08328232 | 63,000 | 509,247 |
Sanitario suministro e instalación | 1.616656464 | 1,077,612 | 1,742,128 |
Punto desagüe sanitario pvc 4" | 8.08328232 | 68,312 | 552,186 |
Caja de inspección y distribución | 2.155541952 | 207,000 | 446,197 |
Tubería PVC sanitaria 4" | 5.38885488 | 156,100 | 841,200 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.538885488 | 23,113 | 12,455 |
Interruptor sencillo cuatro vías. Suministro e instalación | 17.783221104 | 23,313 | 414,576 |
Panel de 80W para sistema de energía solar | 2.155541952 | 920,900 | 1,985,039 |
Inversor de voltaje 300W | 0.538885488 | 297,050 | 160,076 |
Caja de control sistema de energía solar | 0.538885488 | 1,018,750 | 548,990 |
Batería estacionaria 90 Amperios para sistema energía solar | 2.155541952 | 731,600 | 1,576,994 |
Tablero trifásico con puerta de 24 circuitos | 0.538885488 | 321,000 | 172,982 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 2.155541952 | 395,000 | 851,439 |
Muro drywall doble cara x 1 m2 | 69.785670696 | 153,842 | 10,735,939 |
Ascensor 8 personas | 0.0269442744 | 99,900,000 | 2,691,733 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 135.8440501 | 12,828 | 1,742,635 |
Geomembrana Instalación x 1 m2 | 91.61053296 | 13,477 | 1,234,673 |
Cepillera Attica | 1.34721372 | 28,850 | 38,867 |
Espejo de 2mm de espesor *1 m2 | 2.69442744 | 93,700 | 252,468 |
Argolla toalla attica | 1.34721372 | 36,250 | 48,836 |
Aguacate, Suministro y siembra de 1 (una) plántula | 1.79628496 | 140,813 | 252,941 |
Administración | 12097979.2056 | 1 | 12,097,979 |
Imprevistos | 12097979.2056 | 1 | 12,097,979 |
Utilidad | 6051549.308868 | 1 | 6,051,549 |
Unidad Monetaria | 1149622.3744 | 1 | 1,149,622 |
Valor Adicional: | 143,918,734 |
| $54,900 |
| $18,850,900 |
| $97,500 |
| $58,550 |
| $130,000 |
| $3,560,000 |
| $0 |
| $1,895,000 |
| $2,200,000 |
| $82,700 |
| $80,158 |
| $32,550 |
| $50,500 |
| $950,000 |
| $9,102 |
| $56,600 |
| $63,000 |
| $819,126,738 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 627 | 3,900 | 2,445,300 |
Salario mínimo mensual vigente, base | 1.881 | 1,300,000 | 2,445,300 |
Levantamiento topográfico hasta 1,000 m2 | 3 | 2,600,000 | 7,800,000 |
Salario mínimo mensual vigente, base | 6 | 1,300,000 | 7,800,000 |
Replanteo Arquitectónico X 1 m2 | 627 | 10,038 | 6,293,604 |
Cuerda de Nylon 100 m x 0,50 mm | 31.35 | 50,900 | 1,595,715 |
Estaca de Madera Ø=0.05 L=0.60 m | 313.5 | 6,100 | 1,912,350 |
| 6.27 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 10.2828 | 24,504 | 251,974 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 103.3923 | 24,504 | 2,533,565 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 627 | 28,597 | 17,930,407 |
Salario diario vigente | 413.82 | 43,329 | 17,930,407 |
Estudio de suelos y geotecnia desde | 3 | 4,147,000 | 12,441,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 9 | 650,000 | 5,850,000 |
Ensayo SPT | 3 | 247,000 | 741,000 |
Informe Geotécnico y recomendaciones de construcción | 3 | 1,950,000 | 5,850,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 3 | 11,001 | 33,004 |
Salario diario vigente | 0.7617 | 43,329 | 33,004 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 627 | 13,520 | 8,477,040 |
Diseño hidráulico de edificio x 1 m2 | 627 | 6,760 | 4,238,520 |
Diseño sanitario de edificio x 1 m2, servicio | 627 | 6,760 | 4,238,520 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 627 | 16,000 | 10,032,000 |
Valor Adicional: | 65,452,354 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 30 | 58,492 | 1,754,759 |
Cuadrilla de albañileria x 1 Hora | 6.51 | 24,504 | 159,524 |
Cuadrilla de albañileria x 1 Hora | 65.1 | 24,504 | 1,595,236 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 1,754,759 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 9 | 484,450 | 4,360,050 |
Punto agua fria PVC 1/2" | 54 | 44,047 | 2,378,511 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 10.8 | 20,300 | 219,240 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 2.7 | 30,700 | 82,890 |
Codo PVC 90° presión de 1/2" x 10 unidades | 5.4 | 45,000 | 243,000 |
Soldadura para PVC 1/4 de galón | 2.16 | 53,500 | 115,560 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.81 | 77,000 | 62,370 |
Instalación carpintería metálica x 1 m2 | 71.982 | 20,907 | 1,504,956 |
Instalación carpintería metálica x 1 m2 | 7.1982 | 20,907 | 150,496 |
Tubo 1" x 6 m RDE 13.5 | 45 | 63,000 | 2,835,000 |
Valor Adicional: | 9,573,561 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 9 | 1,077,612 | 9,698,507 |
Sanitario One Piece Galio Blanco | 9 | 974,000 | 8,766,000 |
Instalación de aparatos sanitarios x unidad | 9 | 103,612 | 932,507 |
Punto desagüe sanitario pvc 4" | 45 | 68,312 | 3,074,043 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 7.65 | 78,000 | 596,700 |
Cuadrilla de albañileria x 1 Hora | 90 | 24,504 | 2,205,395 |
Limpiador para PVC 1/4 de galón | 1.692 | 99,000 | 167,508 |
Soldadura para PVC DE 1/4 de Galón | 1.4085 | 74,150 | 104,440 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 12 | 207,000 | 2,484,000 |
Tubería PVC sanitaria 4" | 30 | 156,100 | 4,683,000 |
Valor Adicional: | 19,939,550 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 3 | 23,113 | 69,338 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 0.6 | 94,000 | 56,400 |
Cuadrilla de albañileria x 1 Hora | 0.48 | 24,504 | 11,762 |
Cuadrilla de albañileria x 1 Hora | 0.048 | 24,504 | 1,176 |
Interruptor sencillo cuatro vías. Suministro e instalación | 99 | 23,313 | 2,307,964 |
Interruptor sencillo cuatro vías x 5 unidades | 19.8 | 95,000 | 1,881,000 |
Cuadrilla de albañileria x 1 Hora | 15.84 | 24,504 | 388,150 |
Cuadrilla de albañileria x 1 Hora | 1.584 | 24,504 | 38,815 |
Panel de 80W para sistema de energía solar | 12 | 920,900 | 11,050,800 |
Inversor de voltaje 300W | 3 | 297,050 | 891,150 |
Caja de control sistema de energía solar | 3 | 1,018,750 | 3,056,250 |
Batería estacionaria 90 Amperios para sistema energía solar | 12 | 731,600 | 8,779,200 |
Tablero trifásico con puerta de 24 circuitos | 3 | 321,000 | 963,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 12 | 395,000 | 4,740,000 |
Valor Adicional: | 31,857,703 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 18 | 492,210 | 8,859,780 |
Agua para la obra 1 litro | 3222 | 36 | 117,281 |
Arena lavada de río 1 m3 | 13.608 | 95,019 | 1,293,019 |
Cemento 1 Kg | 5670 | 798 | 4,524,660 |
Triturado de 3/4" x 1 m3 | 13.608 | 150,500 | 2,048,004 |
Mezcladora 1 bulto, alquiler x hora | 18 | 7,150 | 128,700 |
Cuadrilla 7 (8 obreros) x jornal | 1.26 | 578,347 | 728,717 |
Oficial de construcción x hora | 1.26 | 15,397 | 19,400 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 24 | 818,067 | 19,633,611 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 24 | 533,055 | 12,793,326 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 71.04 | 13,000 | 923,520 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 3.6 | 155,000 | 558,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 8.64 | 10,000 | 86,400 |
| 31.44 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 195.6 | 24,504 | 4,793,058 |
Cuadrilla de albañileria x 1 Hora | 19.56 | 24,504 | 479,306 |
Acero G-60 x 1 Kg | 1800 | 5,200 | 9,360,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 42 | 533,055 | 22,388,321 |
Arena lavada de río 1 m3 | 24.696 | 95,019 | 2,346,589 |
Cemento 1 Kg | 15435 | 798 | 12,317,130 |
Triturado de 3/4" x 1 m3 | 37.044 | 150,500 | 5,575,122 |
Agua para la obra 1 litro | 8379 | 36 | 304,996 |
Mezcladora 1 bulto, alquiler x hora | 20.16 | 7,150 | 144,144 |
Cuadrilla 7 (8 obreros) x jornal | 2.94 | 578,347 | 1,700,340 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 6 | 858,441 | 5,150,644 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 6 | 533,055 | 3,198,332 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.06 | 155,000 | 9,300 |
Durmiente ordinario 0,04x0.04x3,00 m. | 6 | 30,000 | 180,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 6 | 36,500 | 219,000 |
Vara clavo 3m | 1.02 | 20,100 | 20,502 |
Cuadrilla de albañileria x 1 Hora | 54 | 24,504 | 1,323,237 |
Cuadrilla de albañileria x 1 Hora | 5.4 | 24,504 | 132,324 |
Vibrador eléctrico de aguja para concreto x hora | 9 | 7,550 | 67,950 |
Valor Adicional: | 65,392,356 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 729 | 232,618 | 169,578,455 |
Sistema, Panel x 1 m2 x 0.04 m | 765.45 | 56,500 | 43,247,925 |
Malla plana RG2 | 291.6 | 5,350 | 1,560,060 |
Malla RGU 80 | 364.5 | 6,500 | 2,369,250 |
Malla angular RG1 | 364.5 | 6,700 | 2,442,150 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 40.095 | 473,449 | 18,982,945 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 188.082 | 31,013 | 5,832,949 |
Cuadrilla de instalaciones x 1 Hora | 109.9332 | 26,955 | 2,963,230 |
Cuadrilla de instalaciones x 1 Hora | 1099.332 | 26,955 | 29,632,305 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 3645 | 5,200 | 18,954,000 |
Transporte 1 tonelada x 1 kilómetro | 29.16 | 3,900 | 113,724 |
Muro panel doble cara x 1 m2 | 72.9 | 232,618 | 16,957,845 |
Muro panel doble cara x 1 m2 | 72.9 | 232,618 | 16,957,845 |
Muro panel doble cara x 1 m2 | 36.45 | 232,618 | 8,478,923 |
Muro panel doble cara x 1 m2 | 4.6656 | 232,618 | 1,085,302 |
Valor Adicional: | 169,578,455 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 600 | 90,690 | 54,413,949 |
Acero G-60 x 1 Kg | 5940 | 5,200 | 30,888,000 |
Pintuco Anticorrosivo rojo | 108 | 95,000 | 10,260,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 72 | 34,650 | 2,494,800 |
Cuadrilla de albañileria x 1 Hora | 399.6 | 24,504 | 9,791,954 |
Cuadrilla de albañileria x 1 Hora | 39.96 | 24,504 | 979,195 |
Teja termoacustica x 1 m2, suministro e instalación | 684 | 198,448 | 135,738,627 |
Teja termoacústica 3 m x 0.78 m | 292.3416 | 393,120 | 114,925,330 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 142.4772 | 93,400 | 13,307,370 |
Andamio Tubular estandar con tijeras alquiler por día | 34.2 | 47,300 | 1,617,660 |
Cuadrilla de instalaciones x 1 Hora | 17.1 | 26,955 | 460,928 |
Cuadrilla de instalaciones x 1 Hora | 171 | 26,955 | 4,609,276 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 136.8 | 5,200 | 711,360 |
Transporte 1 tonelada x 1 kilómetro | 27.36 | 3,900 | 106,704 |
Valor Adicional: | 190,152,577 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Guardaescoba en ceramica porcelanato x 1m | 258 | 23,946 | 6,178,092 |
Agua para la obra 1 litro | 387 | 36 | 14,087 |
Arena lavada de río 1 m3 | 3.87 | 95,019 | 367,724 |
Pegacor max, 25 Kg, porcelanato | 6.45 | 85,500 | 551,475 |
Porcelanato sellado Beige x 1 m2 | 25.8 | 135,900 | 3,506,220 |
Cuadrilla de albañileria x 1 Hora | 64.5 | 24,504 | 1,580,533 |
Cuadrilla de albañileria x 1 Hora | 6.45 | 24,504 | 158,053 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 330 | 178,966 | 59,058,867 |
Agua para la obra 1 litro | 1155 | 36 | 42,042 |
Pegacor max, 25 Kg, porcelanato | 82.5 | 85,500 | 7,053,750 |
Porcelanato sellado Beige x 1 m2 | 330 | 135,900 | 44,847,000 |
Cuadrilla de albañileria x 1 Hora | 264 | 24,504 | 6,469,159 |
Cuadrilla de albañileria x 1 Hora | 26.4 | 24,504 | 646,916 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 10.8 | 1,574,907 | 17,009,000 |
Puerta en aluminio con vidrio templado de 6 mm x 1m2 | 21.6 | 777,000 | 16,783,200 |
Instalación carpintería metálica x 1 m2 | 10.8 | 20,907 | 225,800 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 45 | 340,807 | 15,336,332 |
Ventana corrediza aluminio anodizado con vidrios x 1m2 | 45 | 319,900 | 14,395,500 |
Instalación carpintería metálica x 1 m2 | 45 | 20,907 | 940,832 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1020 | 12,828 | 13,084,764 |
Intervinil 5 galones, vinilo tipo 2 | 10.2 | 230,000 | 2,346,000 |
Cuadrilla de pintura x 1 hora | 22.44 | 38,563 | 865,349 |
Cuadrilla de pintura x 1 hora | 224.4 | 38,563 | 8,653,495 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 204 | 5,200 | 1,060,800 |
Transporte 1 tonelada x 1 kilómetro | 40.8 | 3,900 | 159,120 |
Geomembrana Instalación x 1 m2 | 360 | 13,477 | 4,851,869 |
Cuadrilla de albañileria x 1 Hora | 18 | 24,504 | 441,079 |
Cuadrilla de albañileria x 1 Hora | 180 | 24,504 | 4,410,790 |
Cepillera Attica | 9 | 28,850 | 259,650 |
Espejo de 2mm de espesor *1 m2 | 9 | 93,700 | 843,300 |
Argolla toalla attica | 9 | 36,250 | 326,250 |
División de baño corrediza | 9 | 550,000 | 4,950,000 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 3 | 505,085 | 1,515,255 |
Puerta de triplex | 24 | 342,450 | 8,218,800 |
Valor Adicional: | 131,632,179 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 30 | 140,813 | 4,224,402 |
Cascarilla de arroz x bulto 45 Kg | 7.5 | 155,000 | 1,162,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 2.25 | 91,000 | 204,750 |
Plántula aguacate | 30 | 33,250 | 997,500 |
Tierra negra abonada x 1 m3 | 6 | 235,000 | 1,410,000 |
Pala redonda No. 4 mango plástico | 0.15 | 63,000 | 9,450 |
Cuadrilla de instalaciones x 1 Hora | 15 | 26,955 | 404,322 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 6 | 5,200 | 31,200 |
Transporte 1 tonelada x 1 kilómetro | 1.2 | 3,900 | 4,680 |
Valor Adicional: | 4,224,402 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 50100000 | 1 | 50,100,000 |
Valor Adicional: | 50,100,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 48600000 | 1 | 48,600,000 |
Valor Adicional: | 48,600,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 24300000 | 1 | 24,300,000 |
Valor Adicional: | 24,300,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 4661700 | 1 | 4,661,700 |
Valor Adicional: | 4,661,700 |
| $47,500 |
| $68,312 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 0.17 | 78,000 | 13,260 |
Cuadrilla de albañileria x 1 Hora | 2 | 24,504 | 49,009 |
Oficial de construcción x hora | 2 | 15,397 | 30,793 |
Ayudante de construcción x 1 hora | 2 | 9,108 | 18,216 |
Limpiador para PVC 1/4 de galón | 0.0376 | 99,000 | 3,722 |
Soldadura para PVC DE 1/4 de Galón | 0.0313 | 74,150 | 2,321 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 68,312 |
| $1,474,850 |
| $173,800 |
| $45,000 |
| $1,560,000 |
| $45,750 |
| $497,000 |
| $273,000 |
| $90,300 |
| $119,000 |
| $1,885,050 |
| $52,900 |
| $149,100 |
| $34,250 |
| $128,550 |
| $64,200 |
| $325,000 |
| $96,144,255,888 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 19200 | 1,000,000 | 19,200,000,000 |
Valor Adicional: | 19,200,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 15 | 2,600,000 | 39,000,000 |
Salario mínimo mensual vigente, base | 30 | 1,300,000 | 39,000,000 |
Replanteo Arquitectónico X 1 m2 | 73485 | 10,038 | 737,616,394 |
Cuerda de Nylon 100 m x 0,50 mm | 3674.25 | 50,900 | 187,019,325 |
Estaca de Madera Ø=0.05 L=0.60 m | 36742.5 | 6,100 | 224,129,250 |
| 734.85 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 1205.154 | 24,504 | 29,531,562 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 12117.6765 | 24,504 | 296,936,259 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 73485 | 14,000 | 1,028,790,000 |
Estudio de suelos y geotecnia desde | 30 | 4,147,000 | 124,410,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 90 | 650,000 | 58,500,000 |
Ensayo SPT | 30 | 247,000 | 7,410,000 |
Informe Geotécnico y recomendaciones de construcción | 30 | 1,950,000 | 58,500,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 73485 | 10,400 | 764,244,000 |
Salario mínimo mensual vigente, base | 587.88 | 1,300,000 | 764,244,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 73485 | 13,520 | 993,517,200 |
Diseño hidráulico de edificio x 1 m2 | 73485 | 6,760 | 496,758,600 |
Diseño sanitario de edificio x 1 m2, servicio | 73485 | 6,760 | 496,758,600 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 73485 | 16,000 | 1,175,760,000 |
Valor Adicional: | 4,863,337,594 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 63432 | 4,551 | 288,694,890 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 1585.8 | 182,050 | 288,694,890 |
Piloteadora, alquiler por Hora | 240 | 390,000 | 93,600,000 |
Salario mínimo mensual vigente, base | 72 | 1,300,000 | 93,600,000 |
Valor Adicional: | 382,294,890 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 3693909 | 5,200 | 19,208,326,800 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 19173 | 533,055 | 10,220,268,523 |
Arena lavada de río 1 m3 | 11273.724 | 95,019 | 1,071,217,981 |
Cemento 1 Kg | 7046077.5 | 798 | 5,622,769,845 |
Triturado de 3/4" x 1 m3 | 16910.586 | 150,500 | 2,545,043,244 |
Agua para la obra 1 litro | 3825013.5 | 36 | 139,230,491 |
Mezcladora 1 bulto, alquiler x hora | 9203.04 | 7,150 | 65,801,736 |
Cuadrilla 7 (8 obreros) x jornal | 1342.11 | 578,347 | 776,205,226 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 3000 | 858,441 | 2,575,322,137 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 3000 | 533,055 | 1,599,165,784 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 30 | 155,000 | 4,650,000 |
Durmiente ordinario 0,04x0.04x3,00 m. | 3000 | 30,000 | 90,000,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 3000 | 36,500 | 109,500,000 |
Vara clavo 3m | 510 | 20,100 | 10,251,000 |
Cuadrilla de albañileria x 1 Hora | 27000 | 24,504 | 661,618,503 |
Cuadrilla de albañileria x 1 Hora | 2700 | 24,504 | 66,161,850 |
Vibrador eléctrico de aguja para concreto x hora | 4500 | 7,550 | 33,975,000 |
Valor Adicional: | 32,003,917,460 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 1080 | 484,450 | 523,206,000 |
Punto agua fria PVC 1/2" | 6480 | 44,047 | 285,421,345 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 1296 | 20,300 | 26,308,800 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 324 | 30,700 | 9,946,800 |
Codo PVC 90° presión de 1/2" x 10 unidades | 648 | 45,000 | 29,160,000 |
Soldadura para PVC 1/4 de galón | 259.2 | 53,500 | 13,867,200 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 97.2 | 77,000 | 7,484,400 |
Instalación carpintería metálica x 1 m2 | 8637.84 | 20,907 | 180,594,678 |
Instalación carpintería metálica x 1 m2 | 863.784 | 20,907 | 18,059,468 |
Tubo 1" x 6 m RDE 13.5 | 5400 | 63,000 | 340,200,000 |
Valor Adicional: | 1,148,827,345 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 1080 | 1,077,612 | 1,163,820,786 |
Sanitario One Piece Galio Blanco | 1080 | 974,000 | 1,051,920,000 |
Instalación de aparatos sanitarios x unidad | 1080 | 103,612 | 111,900,786 |
Punto desagüe sanitario pvc 4" | 5400 | 68,312 | 368,885,194 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 918 | 78,000 | 71,604,000 |
Cuadrilla de albañileria x 1 Hora | 10800 | 24,504 | 264,647,401 |
Limpiador para PVC 1/4 de galón | 203.04 | 99,000 | 20,100,960 |
Soldadura para PVC DE 1/4 de Galón | 169.02 | 74,150 | 12,532,833 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 1440 | 207,000 | 298,080,000 |
Tubería PVC sanitaria 4" | 3600 | 156,100 | 561,960,000 |
Valor Adicional: | 2,392,745,980 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 360 | 23,113 | 8,320,598 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 72 | 94,000 | 6,768,000 |
Cuadrilla de albañileria x 1 Hora | 57.6 | 24,504 | 1,411,453 |
Cuadrilla de albañileria x 1 Hora | 5.76 | 24,504 | 141,145 |
Interruptor sencillo cuatro vías. Suministro e instalación | 11880 | 23,313 | 276,955,737 |
Interruptor sencillo cuatro vías x 5 unidades | 2376 | 95,000 | 225,720,000 |
Cuadrilla de albañileria x 1 Hora | 1900.8 | 24,504 | 46,577,943 |
Cuadrilla de albañileria x 1 Hora | 190.08 | 24,504 | 4,657,794 |
Panel de 80W para sistema de energía solar | 1440 | 920,900 | 1,326,096,000 |
Inversor de voltaje 300W | 360 | 297,050 | 106,938,000 |
Caja de control sistema de energía solar | 360 | 1,018,750 | 366,750,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 1440 | 731,600 | 1,053,504,000 |
Tablero trifásico con puerta de 24 circuitos | 360 | 321,000 | 115,560,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 1440 | 395,000 | 568,800,000 |
Valor Adicional: | 3,822,924,335 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 46620 | 153,842 | 7,172,095,299 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 34717.914 | 83,900 | 2,912,832,985 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 233.1 | 135,750 | 31,643,325 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 12587.4 | 32,100 | 404,055,540 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 38228.4 | 25,500 | 974,824,200 |
Cuadrilla de carpintería por hora | 3883.446 | 38,130 | 148,073,932 |
Cuadrilla de carpintería por hora | 38848.446 | 38,130 | 1,481,272,599 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 233100 | 5,200 | 1,212,120,000 |
Transporte 1 tonelada x 1 kilómetro | 1864.8 | 3,900 | 7,272,720 |
Valor Adicional: | 7,172,095,299 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 18 | 99,900,000 | 1,798,200,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 90750 | 12,828 | 1,164,159,150 |
Intervinil 5 galones, vinilo tipo 2 | 907.5 | 230,000 | 208,725,000 |
Cuadrilla de pintura x 1 hora | 1996.5 | 38,563 | 76,990,650 |
Cuadrilla de pintura x 1 hora | 19965 | 38,563 | 769,906,502 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 18150 | 5,200 | 94,380,000 |
Transporte 1 tonelada x 1 kilómetro | 3630 | 3,900 | 14,157,000 |
Geomembrana Instalación x 1 m2 | 61200 | 13,477 | 824,817,737 |
Cuadrilla de albañileria x 1 Hora | 3060 | 24,504 | 74,983,430 |
Cuadrilla de albañileria x 1 Hora | 30600 | 24,504 | 749,834,303 |
Cepillera Attica | 900 | 28,850 | 25,965,000 |
Espejo de 2mm de espesor *1 m2 | 1800 | 93,700 | 168,660,000 |
Argolla toalla attica | 900 | 36,250 | 32,625,000 |
Valor Adicional: | 4,014,426,887 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 1200 | 140,813 | 168,976,097 |
Cascarilla de arroz x bulto 45 Kg | 300 | 155,000 | 46,500,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 90 | 91,000 | 8,190,000 |
Plántula aguacate | 1200 | 33,250 | 39,900,000 |
Tierra negra abonada x 1 m3 | 240 | 235,000 | 56,400,000 |
Pala redonda No. 4 mango plástico | 6 | 63,000 | 378,000 |
Cuadrilla de instalaciones x 1 Hora | 600 | 26,955 | 16,172,897 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 240 | 5,200 | 1,248,000 |
Transporte 1 tonelada x 1 kilómetro | 48 | 3,900 | 187,200 |
Valor Adicional: | 168,976,097 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 8082000000 | 1 | 8,082,000,000 |
Valor Adicional: | 8,082,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 8082000000 | 1 | 8,082,000,000 |
Valor Adicional: | 8,082,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 4042710000 | 1 | 4,042,710,000 |
Valor Adicional: | 4,042,710,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 768000000 | 1 | 768,000,000 |
Valor Adicional: | 768,000,000 |
| $29,950 |
| $1,941,790 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa en obra gris de 1 planta y 209 m2 presupuesto de construcción | 0.0096 | 202,269,719 | 1,941,789 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 2.0064 | 3,900 | 7,825 |
Levantamiento topográfico hasta 1,000 m2 | 0.0096 | 2,600,000 | 24,960 |
Replanteo Arquitectónico X 1 m2 | 2.0064 | 10,038 | 20,140 |
Diseño arquitectónico de casa personalizada x 1 m2 | 2.0064 | 28,597 | 57,377 |
Estudio de suelos y geotecnia desde | 0.0096 | 4,147,000 | 39,811 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.0096 | 11,001 | 106 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 2.0064 | 13,520 | 27,127 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 2.0064 | 16,000 | 32,102 |
Excavación manual en conglomerado x 1 m3 | 0.096 | 58,492 | 5,615 |
Kit Mueble para baño + lavamanos | 0.0288 | 484,450 | 13,952 |
Punto agua fria PVC 1/2" | 0.1728 | 44,047 | 7,611 |
Tubo 1" x 6 m RDE 13.5 | 0.144 | 63,000 | 9,072 |
Sanitario suministro e instalación | 0.0288 | 1,077,612 | 31,035 |
Punto desagüe sanitario pvc 4" | 0.144 | 68,312 | 9,837 |
Caja de inspección y distribución | 0.0384 | 207,000 | 7,949 |
Tubería PVC sanitaria 4" | 0.096 | 156,100 | 14,986 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.0576 | 492,210 | 28,351 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.0768 | 818,067 | 62,828 |
Acero G-60 x 1 Kg | 5.76 | 5,200 | 29,952 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.1344 | 533,055 | 71,643 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.0192 | 858,441 | 16,482 |
Muro panel doble cara x 1 m2 | 2.3328 | 232,618 | 542,651 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 1.92 | 90,690 | 174,125 |
Teja termoacustica x 1 m2, suministro e instalación | 2.1888 | 198,448 | 434,364 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.096 | 140,813 | 13,518 |
Aseo general para entrega de obra x metro cuadrado | 2.0064 | 3,042 | 6,103 |
Administración | 121920 | 1 | 121,920 |
Imprevistos | 59520 | 1 | 59,520 |
Utilidad | 59520 | 1 | 59,520 |
Unidad Monetaria | 11308.8 | 1 | 11,309 |
Valor Adicional: | 1,941,789 |
| $641,000 |
| $176,650 |
| $3,868,320 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00029936038 | 12,921,951,720 | 3,868,320 |
Terreno, predio, lote precio por 1m2 | 0.74840095 | 1,000,000 | 748,401 |
Levantamiento topográfico hasta 1,000 m2 | 0.00059872076 | 2,600,000 | 1,557 |
Replanteo Arquitectónico X 1 m2 | 2.4442775027 | 10,038 | 24,535 |
Diseño arquitectónico de edificios x 1 m2 | 2.4442775027 | 14,000 | 34,220 |
Estudio de suelos y geotecnia desde | 0.00119744152 | 4,147,000 | 4,966 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 2.4442775027 | 10,400 | 25,420 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 2.4442775027 | 13,520 | 33,047 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 2.4442775027 | 16,000 | 39,108 |
Excavación mecánica en conglomerado x 1 m3 | 2.19850263072 | 4,551 | 10,006 |
Piloteadora, alquiler por Hora | 0.0239488304 | 390,000 | 9,340 |
Acero G-60 x 1 Kg | 122.86767820492 | 5,200 | 638,912 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.63793696978 | 533,055 | 340,056 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.09968700654 | 858,441 | 85,575 |
Steel deck metaldeck grado 40 | 0.48885550054 | 451,000 | 220,474 |
Kit Mueble para baño + lavamanos | 0.0359232456 | 484,450 | 17,403 |
Punto agua fria PVC 1/2" | 0.2155394736 | 44,047 | 9,494 |
Tubo 1" x 6 m RDE 13.5 | 0.179616228 | 63,000 | 11,316 |
Sanitario suministro e instalación | 0.0359232456 | 1,077,612 | 38,711 |
Punto desagüe sanitario pvc 4" | 0.179616228 | 68,312 | 12,270 |
Caja de inspección y distribución | 0.0478976608 | 207,000 | 9,915 |
Tubería PVC sanitaria 4" | 0.119744152 | 156,100 | 18,692 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.0119744152 | 23,113 | 277 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.3951557016 | 23,313 | 9,212 |
Panel de 80W para sistema de energía solar | 0.0478976608 | 920,900 | 44,109 |
Inversor de voltaje 300W | 0.0119744152 | 297,050 | 3,557 |
Caja de control sistema de energía solar | 0.0119744152 | 1,018,750 | 12,199 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.0478976608 | 731,600 | 35,042 |
Tablero trifásico con puerta de 24 circuitos | 0.0119744152 | 321,000 | 3,844 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.0478976608 | 395,000 | 18,920 |
Muro drywall doble cara x 1 m2 | 1.5506867684 | 153,842 | 238,560 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 1.556673976 | 178,966 | 278,592 |
Ascensor 8 personas | 0.00059872076 | 99,900,000 | 59,812 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 3.023539838 | 12,828 | 38,787 |
Geomembrana Instalación x 1 m2 | 0.89808114 | 13,477 | 12,104 |
Cepillera Attica | 0.029936038 | 28,850 | 864 |
Espejo de 2mm de espesor *1 m2 | 0.059872076 | 93,700 | 5,610 |
Argolla toalla attica | 0.029936038 | 36,250 | 1,085 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 3.786908807 | 141,747 | 536,782 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0029936038 | 140,813 | 422 |
Administración | 94042.26721472 | 1 | 94,042 |
Imprevistos | 47042.68755472 | 1 | 47,043 |
Utilidad | 94042.26721472 | 1 | 94,042 |
Valor Adicional: | 3,868,320 |
| $2,119,000 |
| $138,250 |
| $550,000,000 |
| $73,950 |
| $25,843,903,440 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 5000 | 1,000,000 | 5,000,000,000 |
Valor Adicional: | 5,000,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 4 | 2,600,000 | 10,400,000 |
Salario mínimo mensual vigente, base | 8 | 1,300,000 | 10,400,000 |
Replanteo Arquitectónico X 1 m2 | 16330 | 10,038 | 163,914,754 |
Cuerda de Nylon 100 m x 0,50 mm | 816.5 | 50,900 | 41,559,850 |
Estaca de Madera Ø=0.05 L=0.60 m | 8165 | 6,100 | 49,806,500 |
| 163.3 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 267.812 | 24,504 | 6,562,569 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 2692.817 | 24,504 | 65,985,835 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 16330 | 14,000 | 228,620,000 |
Estudio de suelos y geotecnia desde | 8 | 4,147,000 | 33,176,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 24 | 650,000 | 15,600,000 |
Ensayo SPT | 8 | 247,000 | 1,976,000 |
Informe Geotécnico y recomendaciones de construcción | 8 | 1,950,000 | 15,600,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 16330 | 10,400 | 169,832,000 |
Salario mínimo mensual vigente, base | 130.64 | 1,300,000 | 169,832,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 16330 | 13,520 | 220,781,600 |
Diseño hidráulico de edificio x 1 m2 | 16330 | 6,760 | 110,390,800 |
Diseño sanitario de edificio x 1 m2, servicio | 16330 | 6,760 | 110,390,800 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 16330 | 16,000 | 261,280,000 |
Valor Adicional: | 1,088,004,354 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 14688 | 4,551 | 66,848,760 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 367.2 | 182,050 | 66,848,760 |
Piloteadora, alquiler por Hora | 160 | 390,000 | 62,400,000 |
Salario mínimo mensual vigente, base | 48 | 1,300,000 | 62,400,000 |
Valor Adicional: | 129,248,760 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 820868 | 5,200 | 4,268,513,600 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 4262 | 533,055 | 2,271,881,523 |
Arena lavada de río 1 m3 | 2506.056 | 95,019 | 238,122,935 |
Cemento 1 Kg | 1566285 | 798 | 1,249,895,430 |
Triturado de 3/4" x 1 m3 | 3759.084 | 150,500 | 565,742,153 |
Agua para la obra 1 litro | 850269 | 36 | 30,949,792 |
Mezcladora 1 bulto, alquiler x hora | 2045.76 | 7,150 | 14,627,184 |
Cuadrilla 7 (8 obreros) x jornal | 298.34 | 578,347 | 172,544,029 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 666 | 858,441 | 571,721,514 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 666 | 533,055 | 355,014,804 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 6.66 | 155,000 | 1,032,300 |
Durmiente ordinario 0,04x0.04x3,00 m. | 666 | 30,000 | 19,980,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 666 | 36,500 | 24,309,000 |
Vara clavo 3m | 113.22 | 20,100 | 2,275,722 |
Cuadrilla de albañileria x 1 Hora | 5994 | 24,504 | 146,879,308 |
Cuadrilla de albañileria x 1 Hora | 599.4 | 24,504 | 14,687,931 |
Vibrador eléctrico de aguja para concreto x hora | 999 | 7,550 | 7,542,450 |
Steel deck metaldeck grado 40 | 3266 | 451,000 | 1,472,966,000 |
Valor Adicional: | 8,585,082,638 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 240 | 484,450 | 116,268,000 |
Punto agua fria PVC 1/2" | 1440 | 44,047 | 63,426,966 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 288 | 20,300 | 5,846,400 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 72 | 30,700 | 2,210,400 |
Codo PVC 90° presión de 1/2" x 10 unidades | 144 | 45,000 | 6,480,000 |
Soldadura para PVC 1/4 de galón | 57.6 | 53,500 | 3,081,600 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 21.6 | 77,000 | 1,663,200 |
Instalación carpintería metálica x 1 m2 | 1919.52 | 20,907 | 40,132,151 |
Instalación carpintería metálica x 1 m2 | 191.952 | 20,907 | 4,013,215 |
Tubo 1" x 6 m RDE 13.5 | 1200 | 63,000 | 75,600,000 |
Valor Adicional: | 255,294,966 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 240 | 1,077,612 | 258,626,841 |
Sanitario One Piece Galio Blanco | 240 | 974,000 | 233,760,000 |
Instalación de aparatos sanitarios x unidad | 240 | 103,612 | 24,866,841 |
Punto desagüe sanitario pvc 4" | 1200 | 68,312 | 81,974,488 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 204 | 78,000 | 15,912,000 |
Cuadrilla de albañileria x 1 Hora | 2400 | 24,504 | 58,810,534 |
Limpiador para PVC 1/4 de galón | 45.12 | 99,000 | 4,466,880 |
Soldadura para PVC DE 1/4 de Galón | 37.56 | 74,150 | 2,785,074 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 320 | 207,000 | 66,240,000 |
Tubería PVC sanitaria 4" | 800 | 156,100 | 124,880,000 |
Valor Adicional: | 531,721,329 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 80 | 23,113 | 1,849,022 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 16 | 94,000 | 1,504,000 |
Cuadrilla de albañileria x 1 Hora | 12.8 | 24,504 | 313,656 |
Cuadrilla de albañileria x 1 Hora | 1.28 | 24,504 | 31,366 |
Interruptor sencillo cuatro vías. Suministro e instalación | 2640 | 23,313 | 61,545,719 |
Interruptor sencillo cuatro vías x 5 unidades | 528 | 95,000 | 50,160,000 |
Cuadrilla de albañileria x 1 Hora | 422.4 | 24,504 | 10,350,654 |
Cuadrilla de albañileria x 1 Hora | 42.24 | 24,504 | 1,035,065 |
Panel de 80W para sistema de energía solar | 320 | 920,900 | 294,688,000 |
Inversor de voltaje 300W | 80 | 297,050 | 23,764,000 |
Caja de control sistema de energía solar | 80 | 1,018,750 | 81,500,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 320 | 731,600 | 234,112,000 |
Tablero trifásico con puerta de 24 circuitos | 80 | 321,000 | 25,680,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 320 | 395,000 | 126,400,000 |
Valor Adicional: | 849,538,741 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 10360 | 153,842 | 1,593,798,955 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 7715.092 | 83,900 | 647,296,219 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 51.8 | 135,750 | 7,031,850 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 2797.2 | 32,100 | 89,790,120 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 8495.2 | 25,500 | 216,627,600 |
Cuadrilla de carpintería por hora | 862.988 | 38,130 | 32,905,318 |
Cuadrilla de carpintería por hora | 8632.988 | 38,130 | 329,171,689 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 51800 | 5,200 | 269,360,000 |
Transporte 1 tonelada x 1 kilómetro | 414.4 | 3,900 | 1,616,160 |
Valor Adicional: | 1,593,798,955 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 10400 | 178,966 | 1,861,249,128 |
Agua para la obra 1 litro | 36400 | 36 | 1,324,960 |
Pegacor max, 25 Kg, porcelanato | 2600 | 85,500 | 222,300,000 |
Porcelanato sellado Beige x 1 m2 | 10400 | 135,900 | 1,413,360,000 |
Cuadrilla de albañileria x 1 Hora | 8320 | 24,504 | 203,876,516 |
Cuadrilla de albañileria x 1 Hora | 832 | 24,504 | 20,387,652 |
Ascensor 8 personas | 4 | 99,900,000 | 399,600,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 20200 | 12,828 | 259,129,640 |
Intervinil 5 galones, vinilo tipo 2 | 202 | 230,000 | 46,460,000 |
Cuadrilla de pintura x 1 hora | 444.4 | 38,563 | 17,137,313 |
Cuadrilla de pintura x 1 hora | 4444 | 38,563 | 171,373,128 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4040 | 5,200 | 21,008,000 |
Transporte 1 tonelada x 1 kilómetro | 808 | 3,900 | 3,151,200 |
Geomembrana Instalación x 1 m2 | 6000 | 13,477 | 80,864,484 |
Cuadrilla de albañileria x 1 Hora | 300 | 24,504 | 7,351,317 |
Cuadrilla de albañileria x 1 Hora | 3000 | 24,504 | 73,513,167 |
Cepillera Attica | 200 | 28,850 | 5,770,000 |
Espejo de 2mm de espesor *1 m2 | 400 | 93,700 | 37,480,000 |
Argolla toalla attica | 200 | 36,250 | 7,250,000 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 25300 | 141,747 | 3,586,190,177 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 25300 | 130,000 | 3,289,000,000 |
Silicona transparente con fungicida 11 Onzas | 2302.3 | 39,050 | 89,904,815 |
Cuadrilla de albañileria x 1 Hora | 6325 | 24,504 | 154,990,260 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 9297.75 | 5,200 | 48,348,300 |
Transporte 1 tonelada x 1 kilómetro | 1012 | 3,900 | 3,946,800 |
Valor Adicional: | 6,237,533,429 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 20 | 140,813 | 2,816,268 |
Cascarilla de arroz x bulto 45 Kg | 5 | 155,000 | 775,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 1.5 | 91,000 | 136,500 |
Plántula aguacate | 20 | 33,250 | 665,000 |
Tierra negra abonada x 1 m3 | 4 | 235,000 | 940,000 |
Pala redonda No. 4 mango plástico | 0.1 | 63,000 | 6,300 |
Cuadrilla de instalaciones x 1 Hora | 10 | 26,955 | 269,548 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4 | 5,200 | 20,800 |
Transporte 1 tonelada x 1 kilómetro | 0.8 | 3,900 | 3,120 |
Valor Adicional: | 2,816,268 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 628288000 | 1 | 628,288,000 |
Valor Adicional: | 628,288,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 314288000 | 1 | 314,288,000 |
Valor Adicional: | 314,288,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 628288000 | 1 | 628,288,000 |
Valor Adicional: | 628,288,000 |
| $2,598,270 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa nueva de 1 planta y 209 m2 presupuesto de construcción | 0.009516 | 273,042,246 | 2,598,270 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 1.988844 | 3,900 | 7,756 |
Levantamiento topográfico hasta 1,000 m2 | 0.009516 | 2,600,000 | 24,742 |
Replanteo Arquitectónico X 1 m2 | 1.988844 | 10,038 | 19,963 |
Diseño arquitectónico de casa personalizada x 1 m2 | 1.988844 | 28,597 | 56,875 |
Estudio de suelos y geotecnia desde | 0.009516 | 4,147,000 | 39,463 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.009516 | 11,001 | 105 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.988844 | 13,520 | 26,889 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.988844 | 16,000 | 31,822 |
Excavación manual en conglomerado x 1 m3 | 0.09516 | 58,492 | 5,566 |
Kit Mueble para baño + lavamanos | 0.028548 | 484,450 | 13,830 |
Punto agua fria PVC 1/2" | 0.171288 | 44,047 | 7,545 |
Tubo 1" x 6 m RDE 13.5 | 0.14274 | 63,000 | 8,993 |
Sanitario suministro e instalación | 0.028548 | 1,077,612 | 30,764 |
Punto desagüe sanitario pvc 4" | 0.14274 | 68,312 | 9,751 |
Caja de inspección y distribución | 0.038064 | 207,000 | 7,879 |
Tubería PVC sanitaria 4" | 0.09516 | 156,100 | 14,854 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.009516 | 23,113 | 220 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.314028 | 23,313 | 7,321 |
Panel de 80W para sistema de energía solar | 0.038064 | 920,900 | 35,053 |
Inversor de voltaje 300W | 0.009516 | 297,050 | 2,827 |
Caja de control sistema de energía solar | 0.009516 | 1,018,750 | 9,694 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.038064 | 731,600 | 27,848 |
Tablero trifásico con puerta de 24 circuitos | 0.009516 | 321,000 | 3,055 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.038064 | 395,000 | 15,035 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.057096 | 492,210 | 28,103 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.076128 | 818,067 | 62,278 |
Acero G-60 x 1 Kg | 5.7096 | 5,200 | 29,690 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.133224 | 533,055 | 71,016 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.019032 | 858,441 | 16,338 |
Muro panel doble cara x 1 m2 | 2.312388 | 232,618 | 537,903 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 1.9032 | 90,690 | 172,601 |
Teja termoacustica x 1 m2, suministro e instalación | 2.169648 | 198,448 | 430,563 |
Guardaescoba en ceramica porcelanato x 1m | 0.818376 | 23,946 | 19,597 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 1.04676 | 178,966 | 187,335 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 0.0342576 | 1,574,907 | 53,953 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 0.14274 | 340,807 | 48,647 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 3.23544 | 12,828 | 41,505 |
Geomembrana Instalación x 1 m2 | 1.14192 | 13,477 | 15,390 |
Cepillera Attica | 0.028548 | 28,850 | 824 |
Espejo de 2mm de espesor *1 m2 | 0.028548 | 93,700 | 2,675 |
Argolla toalla attica | 0.028548 | 36,250 | 1,035 |
División de baño corrediza | 0.028548 | 550,000 | 15,701 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 0.009516 | 505,085 | 4,806 |
Puerta de triplex | 0.076128 | 342,450 | 26,070 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.09516 | 140,813 | 13,400 |
Aseo general para entrega de obra x metro cuadrado | 1.988844 | 3,042 | 6,049 |
Administración | 158917.2 | 1 | 158,917 |
Imprevistos | 154159.2 | 1 | 154,159 |
Utilidad | 77079.6 | 1 | 77,080 |
Unidad Monetaria | 14786.9124 | 1 | 14,787 |
Valor Adicional: | 2,598,270 |
| $81,350 |
| $34,500 |
| $973,400 |
| $100,000 |
| $113,975,000 |
| $140,000 |
| $141,900 |
| $87,000 |
| $199,000 |
| $1,699,999 |
| $1,259,412 |
| $64,500 |
| $490,000 |
| $458,953 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Bisagras de 3" en niquel | 0.76 | 27,250 | 20,710 |
Cuadrilla de carpintería por hora | 10.31 | 38,130 | 393,115 |
Salario diario vigente | 9.0728 | 43,329 | 393,115 |
Pegante colbón 1 galón | 0.25 | 73,000 | 18,250 |
| 0.15 | 0 | 0 |
Tornillo autoperforante de 8 x 5/8" avellanado madera y aglomerados cobrizado BOLSA 100 unidades | 0.05 | 27,950 | 1,398 |
triplex otobo 4 mm | 0.52 | 49,000 | 25,480 |
Valor Adicional: | 458,953 |
| $431,000 |
| $543,900 |
| $1,999,950 |
| $202,269,719 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 209 | 3,900 | 815,100 |
Salario mínimo mensual vigente, base | 0.627 | 1,300,000 | 815,100 |
Levantamiento topográfico hasta 1,000 m2 | 1 | 2,600,000 | 2,600,000 |
Salario mínimo mensual vigente, base | 2 | 1,300,000 | 2,600,000 |
Replanteo Arquitectónico X 1 m2 | 209 | 10,038 | 2,097,868 |
Cuerda de Nylon 100 m x 0,50 mm | 10.45 | 50,900 | 531,905 |
Estaca de Madera Ø=0.05 L=0.60 m | 104.5 | 6,100 | 637,450 |
| 2.09 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.4276 | 24,504 | 83,991 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 34.4641 | 24,504 | 844,522 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 209 | 28,597 | 5,976,802 |
Salario diario vigente | 137.94 | 43,329 | 5,976,802 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 1 | 11,001 | 11,001 |
Salario diario vigente | 0.2539 | 43,329 | 11,001 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 209 | 13,520 | 2,825,680 |
Diseño hidráulico de edificio x 1 m2 | 209 | 6,760 | 1,412,840 |
Diseño sanitario de edificio x 1 m2, servicio | 209 | 6,760 | 1,412,840 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 209 | 16,000 | 3,344,000 |
Valor Adicional: | 21,817,451 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 3 | 484,450 | 1,453,350 |
Punto agua fria PVC 1/2" | 18 | 44,047 | 792,837 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 3.6 | 20,300 | 73,080 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 0.9 | 30,700 | 27,630 |
Codo PVC 90° presión de 1/2" x 10 unidades | 1.8 | 45,000 | 81,000 |
Soldadura para PVC 1/4 de galón | 0.72 | 53,500 | 38,520 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.27 | 77,000 | 20,790 |
Instalación carpintería metálica x 1 m2 | 23.994 | 20,907 | 501,652 |
Instalación carpintería metálica x 1 m2 | 2.3994 | 20,907 | 50,165 |
Tubo 1" x 6 m RDE 13.5 | 15 | 63,000 | 945,000 |
Valor Adicional: | 3,191,187 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 3 | 1,077,612 | 3,232,836 |
Sanitario One Piece Galio Blanco | 3 | 974,000 | 2,922,000 |
Instalación de aparatos sanitarios x unidad | 3 | 103,612 | 310,836 |
Punto desagüe sanitario pvc 4" | 15 | 68,312 | 1,024,681 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 2.55 | 78,000 | 198,900 |
Cuadrilla de albañileria x 1 Hora | 30 | 24,504 | 735,132 |
Limpiador para PVC 1/4 de galón | 0.564 | 99,000 | 55,836 |
Soldadura para PVC DE 1/4 de Galón | 0.4695 | 74,150 | 34,813 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 4 | 207,000 | 828,000 |
Tubería PVC sanitaria 4" | 10 | 156,100 | 1,561,000 |
Valor Adicional: | 6,646,517 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 6 | 492,210 | 2,953,260 |
Agua para la obra 1 litro | 1074 | 36 | 39,094 |
Arena lavada de río 1 m3 | 4.536 | 95,019 | 431,006 |
Cemento 1 Kg | 1890 | 798 | 1,508,220 |
Triturado de 3/4" x 1 m3 | 4.536 | 150,500 | 682,668 |
Mezcladora 1 bulto, alquiler x hora | 6 | 7,150 | 42,900 |
Cuadrilla 7 (8 obreros) x jornal | 0.42 | 578,347 | 242,906 |
Oficial de construcción x hora | 0.42 | 15,397 | 6,467 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 8 | 818,067 | 6,544,537 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 8 | 533,055 | 4,264,442 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 23.68 | 13,000 | 307,840 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 1.2 | 155,000 | 186,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 2.88 | 10,000 | 28,800 |
| 10.48 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 65.2 | 24,504 | 1,597,686 |
Cuadrilla de albañileria x 1 Hora | 6.52 | 24,504 | 159,769 |
Acero G-60 x 1 Kg | 600 | 5,200 | 3,120,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 14 | 533,055 | 7,462,774 |
Arena lavada de río 1 m3 | 8.232 | 95,019 | 782,196 |
Cemento 1 Kg | 5145 | 798 | 4,105,710 |
Triturado de 3/4" x 1 m3 | 12.348 | 150,500 | 1,858,374 |
Agua para la obra 1 litro | 2793 | 36 | 101,665 |
Mezcladora 1 bulto, alquiler x hora | 6.72 | 7,150 | 48,048 |
Cuadrilla 7 (8 obreros) x jornal | 0.98 | 578,347 | 566,780 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 2 | 858,441 | 1,716,881 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 2 | 533,055 | 1,066,111 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.02 | 155,000 | 3,100 |
Durmiente ordinario 0,04x0.04x3,00 m. | 2 | 30,000 | 60,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 2 | 36,500 | 73,000 |
Vara clavo 3m | 0.34 | 20,100 | 6,834 |
Cuadrilla de albañileria x 1 Hora | 18 | 24,504 | 441,079 |
Cuadrilla de albañileria x 1 Hora | 1.8 | 24,504 | 44,108 |
Vibrador eléctrico de aguja para concreto x hora | 3 | 7,550 | 22,650 |
Valor Adicional: | 21,797,452 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 243 | 232,618 | 56,526,152 |
Sistema, Panel x 1 m2 x 0.04 m | 255.15 | 56,500 | 14,415,975 |
Malla plana RG2 | 97.2 | 5,350 | 520,020 |
Malla RGU 80 | 121.5 | 6,500 | 789,750 |
Malla angular RG1 | 121.5 | 6,700 | 814,050 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 13.365 | 473,449 | 6,327,648 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 62.694 | 31,013 | 1,944,316 |
Cuadrilla de instalaciones x 1 Hora | 36.6444 | 26,955 | 987,743 |
Cuadrilla de instalaciones x 1 Hora | 366.444 | 26,955 | 9,877,435 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 1215 | 5,200 | 6,318,000 |
Transporte 1 tonelada x 1 kilómetro | 9.72 | 3,900 | 37,908 |
Muro panel doble cara x 1 m2 | 24.3 | 232,618 | 5,652,615 |
Muro panel doble cara x 1 m2 | 24.3 | 232,618 | 5,652,615 |
Muro panel doble cara x 1 m2 | 12.15 | 232,618 | 2,826,308 |
Muro panel doble cara x 1 m2 | 1.5552 | 232,618 | 361,767 |
Valor Adicional: | 56,526,152 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 200 | 90,690 | 18,137,983 |
Acero G-60 x 1 Kg | 1980 | 5,200 | 10,296,000 |
Pintuco Anticorrosivo rojo | 36 | 95,000 | 3,420,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 24 | 34,650 | 831,600 |
Cuadrilla de albañileria x 1 Hora | 133.2 | 24,504 | 3,263,985 |
Cuadrilla de albañileria x 1 Hora | 13.32 | 24,504 | 326,398 |
Teja termoacustica x 1 m2, suministro e instalación | 228 | 198,448 | 45,246,209 |
Teja termoacústica 3 m x 0.78 m | 97.4472 | 393,120 | 38,308,443 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 47.4924 | 93,400 | 4,435,790 |
Andamio Tubular estandar con tijeras alquiler por día | 11.4 | 47,300 | 539,220 |
Cuadrilla de instalaciones x 1 Hora | 5.7 | 26,955 | 153,643 |
Cuadrilla de instalaciones x 1 Hora | 57 | 26,955 | 1,536,425 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 45.6 | 5,200 | 237,120 |
Transporte 1 tonelada x 1 kilómetro | 9.12 | 3,900 | 35,568 |
Valor Adicional: | 63,384,192 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 10 | 140,813 | 1,408,134 |
Cascarilla de arroz x bulto 45 Kg | 2.5 | 155,000 | 387,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 0.75 | 91,000 | 68,250 |
Plántula aguacate | 10 | 33,250 | 332,500 |
Tierra negra abonada x 1 m3 | 2 | 235,000 | 470,000 |
Pala redonda No. 4 mango plástico | 0.05 | 63,000 | 3,150 |
Cuadrilla de instalaciones x 1 Hora | 5 | 26,955 | 134,774 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2 | 5,200 | 10,400 |
Transporte 1 tonelada x 1 kilómetro | 0.4 | 3,900 | 1,560 |
Valor Adicional: | 1,408,134 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 12700000 | 1 | 12,700,000 |
Valor Adicional: | 12,700,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 6200000 | 1 | 6,200,000 |
Valor Adicional: | 6,200,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 6200000 | 1 | 6,200,000 |
Valor Adicional: | 6,200,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 1178000 | 1 | 1,178,000 |
Valor Adicional: | 1,178,000 |
| $45,350 |
| $202,000 |
| $650,000 |
| $261,350 |
| $88,900 |
| $84,150 |
| $104,000 |
| $693,650 |
| $490,000 |
| $1,872,400 |
| $144,300 |
| $1,350,000 |
| $111,450 |
| $0 |
| $294,500 |
| $190,000 |
| $85,650 |
| $103,750 |
| $672,000 |
| $147,200 |
| $88,900 |
| $69,850 |
| $381,150 |
| $137,800 |
| $90,100 |
| $45,450 |
| $54,900 |
| $121,327 |
| $390,000 |
| $121,400 |
| $51,000 |
| $200,000 |
| $589,139 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| $143,000 |
| $132,000 |
| $8,674,120 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 4 | 2,168,530 | 8,674,120 |
Salario mínimo mensual vigente, base | 4 | 1,300,000 | 5,200,000 |
Salario mínimo mensual vigente, base | 0.4984 | 1,300,000 | 647,920 |
Salario mínimo mensual vigente, base | 0.48 | 1,300,000 | 624,000 |
Salario mínimo mensual vigente, base | 0.34 | 1,300,000 | 442,000 |
Salario mínimo mensual vigente, base | 0.36 | 1,300,000 | 468,000 |
Salario mínimo mensual vigente, base | 0.3332 | 1,300,000 | 433,160 |
Salario mínimo mensual vigente, base | 0.04 | 1,300,000 | 52,000 |
Salario mínimo mensual vigente, base | 0.0208 | 1,300,000 | 27,040 |
Salario mínimo mensual vigente, base | 0.3332 | 1,300,000 | 433,160 |
Salario mínimo mensual vigente, base | 0.1668 | 1,300,000 | 216,840 |
Salario mínimo mensual vigente, base | 0.1 | 1,300,000 | 130,000 |
Valor Adicional: | 8,674,120 |
| $378,150 |
| $219,000 |
| $292,000 |
| $165,750 |
| $690,800 |
| $39,000 |
| $795,000 |
| $195,290 |
| $411,500 |
| $4,500,000 |
| $39,600 |
| $96,642,307 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 51.58 | 533,055 | 27,494,990 |
Arena lavada de río 1 m3 | 30.32904 | 95,019 | 2,881,835 |
Cemento 1 Kg | 18955.65 | 798 | 15,126,609 |
Triturado de 3/4" x 1 m3 | 45.49356 | 150,500 | 6,846,781 |
Agua para la obra 1 litro | 10290.21 | 36 | 374,564 |
Mezcladora 1 bulto, alquiler x hora | 24.7584 | 7,150 | 177,023 |
Cuadrilla 7 (8 obreros) x jornal | 3.6106 | 578,347 | 2,088,180 |
Acero G-60 x 1 Kg | 2170 | 5,200 | 11,284,000 |
Cuadrilla de albañileria x 1 Hora | 800 | 24,504 | 19,603,511 |
Oficial de construcción x hora | 800 | 15,397 | 12,317,250 |
Ayudante de construcción x 1 hora | 800 | 9,108 | 7,286,261 |
Valor Adicional: | 58,382,502 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 5 | 533,055 | 2,665,276 |
Arena lavada de río 1 m3 | 2.94 | 95,019 | 279,356 |
Cemento 1 Kg | 1837.5 | 798 | 1,466,325 |
Triturado de 3/4" x 1 m3 | 4.41 | 150,500 | 663,705 |
Agua para la obra 1 litro | 997.5 | 36 | 36,309 |
Mezcladora 1 bulto, alquiler x hora | 2.4 | 7,150 | 17,160 |
Cuadrilla 7 (8 obreros) x jornal | 0.35 | 578,347 | 202,421 |
Acero G-60 x 1 Kg | 1300 | 5,200 | 6,760,000 |
Valor Adicional: | 9,425,276 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| $48,500 |
| $119,857,005 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 100 | 3,900 | 390,000 |
Salario mínimo mensual vigente, base | 0.3 | 1,300,000 | 390,000 |
| 0 | 0 | 0 |
4655" target="_blank"> | 1 | 0 | 0 |
Replanteo Arquitectónico X 1 m2 | 100 | 10,038 | 1,003,765 |
Cuerda de Nylon 100 m x 0,50 mm | 5 | 50,900 | 254,500 |
Estaca de Madera Ø=0.05 L=0.60 m | 50 | 6,100 | 305,000 |
| 1 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 1.64 | 24,504 | 40,187 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 16.49 | 24,504 | 404,077 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 100 | 28,597 | 2,859,714 |
Salario diario vigente | 66 | 43,329 | 2,859,714 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 1 | 11,001 | 11,001 |
Salario diario vigente | 0.2539 | 43,329 | 11,001 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 100 | 13,520 | 1,352,000 |
Diseño hidráulico de edificio x 1 m2 | 100 | 6,760 | 676,000 |
Diseño sanitario de edificio x 1 m2, servicio | 100 | 6,760 | 676,000 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 100 | 16,000 | 1,600,000 |
Valor Adicional: | 11,363,480 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Punto desagüe sanitario pvc 4" | 15 | 68,312 | 1,024,681 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 2.55 | 78,000 | 198,900 |
Cuadrilla de albañileria x 1 Hora | 30 | 24,504 | 735,132 |
Limpiador para PVC 1/4 de galón | 0.564 | 99,000 | 55,836 |
Soldadura para PVC DE 1/4 de Galón | 0.4695 | 74,150 | 34,813 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 1,024,681 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Panel de 80W para sistema de energía solar | 4 | 920,900 | 3,683,600 |
Inversor de voltaje 300W | 1 | 297,050 | 297,050 |
Caja de control sistema de energía solar | 1 | 1,018,750 | 1,018,750 |
Batería estacionaria 90 Amperios para sistema energía solar | 4 | 731,600 | 2,926,400 |
Valor Adicional: | 7,925,800 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 600 | 5,200 | 3,120,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 14 | 533,055 | 7,462,774 |
Arena lavada de río 1 m3 | 8.232 | 95,019 | 782,196 |
Cemento 1 Kg | 5145 | 798 | 4,105,710 |
Triturado de 3/4" x 1 m3 | 12.348 | 150,500 | 1,858,374 |
Agua para la obra 1 litro | 2793 | 36 | 101,665 |
Mezcladora 1 bulto, alquiler x hora | 6.72 | 7,150 | 48,048 |
Cuadrilla 7 (8 obreros) x jornal | 0.98 | 578,347 | 566,780 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 2 | 858,441 | 1,716,881 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 2 | 533,055 | 1,066,111 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.02 | 155,000 | 3,100 |
Durmiente ordinario 0,04x0.04x3,00 m. | 2 | 30,000 | 60,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 2 | 36,500 | 73,000 |
Vara clavo 3m | 0.34 | 20,100 | 6,834 |
Cuadrilla de albañileria x 1 Hora | 18 | 24,504 | 441,079 |
Cuadrilla de albañileria x 1 Hora | 1.8 | 24,504 | 44,108 |
Vibrador eléctrico de aguja para concreto x hora | 3 | 7,550 | 22,650 |
Valor Adicional: | 12,299,655 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 170 | 153,842 | 26,153,072 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 126.599 | 83,900 | 10,621,656 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 0.85 | 135,750 | 115,388 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 45.9 | 32,100 | 1,473,390 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 139.4 | 25,500 | 3,554,700 |
Cuadrilla de carpintería por hora | 14.161 | 38,130 | 539,952 |
Cuadrilla de carpintería por hora | 141.661 | 38,130 | 5,401,466 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 850 | 5,200 | 4,420,000 |
Transporte 1 tonelada x 1 kilómetro | 6.8 | 3,900 | 26,520 |
Valor Adicional: | 26,153,072 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Teja termoacustica x 1 m2, suministro e instalación | 110 | 198,448 | 21,829,311 |
Teja termoacústica 3 m x 0.78 m | 47.014 | 393,120 | 18,482,144 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 22.913 | 93,400 | 2,140,074 |
Andamio Tubular estandar con tijeras alquiler por día | 5.5 | 47,300 | 260,150 |
Cuadrilla de instalaciones x 1 Hora | 2.75 | 26,955 | 74,126 |
Cuadrilla de instalaciones x 1 Hora | 27.5 | 26,955 | 741,258 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 22 | 5,200 | 114,400 |
Transporte 1 tonelada x 1 kilómetro | 4.4 | 3,900 | 17,160 |
Valor Adicional: | 21,829,311 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 0 | 99,900,000 | 0 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 340 | 12,828 | 4,361,588 |
Intervinil 5 galones, vinilo tipo 2 | 3.4 | 230,000 | 782,000 |
Cuadrilla de pintura x 1 hora | 7.48 | 38,563 | 288,450 |
Cuadrilla de pintura x 1 hora | 74.8 | 38,563 | 2,884,498 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 68 | 5,200 | 353,600 |
Transporte 1 tonelada x 1 kilómetro | 13.6 | 3,900 | 53,040 |
Geomembrana Instalación x 1 m2 | 120 | 13,477 | 1,617,290 |
Cuadrilla de albañileria x 1 Hora | 6 | 24,504 | 147,026 |
Cuadrilla de albañileria x 1 Hora | 60 | 24,504 | 1,470,263 |
Cepillera Attica | 3 | 28,850 | 86,550 |
Espejo de 2mm de espesor *1 m2 | 3 | 93,700 | 281,100 |
Argolla toalla attica | 3 | 36,250 | 108,750 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 30 | 141,747 | 4,252,399 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 30 | 130,000 | 3,900,000 |
Silicona transparente con fungicida 11 Onzas | 2.73 | 39,050 | 106,607 |
Cuadrilla de albañileria x 1 Hora | 7.5 | 24,504 | 183,783 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 11.025 | 5,200 | 57,330 |
Transporte 1 tonelada x 1 kilómetro | 1.2 | 3,900 | 4,680 |
Valor Adicional: | 10,707,677 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 10 | 140,813 | 1,408,134 |
Cascarilla de arroz x bulto 45 Kg | 2.5 | 155,000 | 387,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 0.75 | 91,000 | 68,250 |
Plántula aguacate | 10 | 33,250 | 332,500 |
Tierra negra abonada x 1 m3 | 2 | 235,000 | 470,000 |
Pala redonda No. 4 mango plástico | 0.05 | 63,000 | 3,150 |
Cuadrilla de instalaciones x 1 Hora | 5 | 26,955 | 134,774 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2 | 5,200 | 10,400 |
Transporte 1 tonelada x 1 kilómetro | 0.4 | 3,900 | 1,560 |
Valor Adicional: | 1,408,134 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 10000000 | 1 | 10,000,000 |
Valor Adicional: | 10,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 10000000 | 1 | 10,000,000 |
Valor Adicional: | 10,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 5800000 | 1 | 5,800,000 |
Valor Adicional: | 5,800,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 950000 | 1 | 950,000 |
Valor Adicional: | 950,000 |
| $1,975,000 |
| $24,800 |
| $25,750 |
| $65,300 |
| $123,500,000 |
| $1,101,600 |
| $120,000 |
| $19,990,000 |
| $3,087,250 |
| $50,000 |
| $350,150 |
| $1,575,000 |
| $286,000 |
| $94,900 |
| $561,216 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 0.2588 | 2,168,530 | 561,216 |
Salario mínimo mensual vigente, base | 0.2588 | 1,300,000 | 336,440 |
Salario mínimo mensual vigente, base | 0.03224648 | 1,300,000 | 41,920 |
Salario mínimo mensual vigente, base | 0.031056 | 1,300,000 | 40,373 |
Salario mínimo mensual vigente, base | 0.021998 | 1,300,000 | 28,597 |
Salario mínimo mensual vigente, base | 0.023292 | 1,300,000 | 30,280 |
Salario mínimo mensual vigente, base | 0.02155804 | 1,300,000 | 28,025 |
Salario mínimo mensual vigente, base | 0.002588 | 1,300,000 | 3,364 |
Salario mínimo mensual vigente, base | 0.00134576 | 1,300,000 | 1,749 |
Salario mínimo mensual vigente, base | 0.02155804 | 1,300,000 | 28,025 |
Salario mínimo mensual vigente, base | 0.01079196 | 1,300,000 | 14,030 |
Salario mínimo mensual vigente, base | 0.00647 | 1,300,000 | 8,411 |
Valor Adicional: | 561,216 |
| $6,500,000 |
| $63,200 |
| $195,000 |
| $67,050 |
| $33,000 |
| $3,551,240 |
| $98,250 |
| $533,100 |
| $39,000,000 |
| $430,000 |
| $165,000 |
| $465,000,000 |
| $371,000 |
| $38,390,000 |
| $72,150 |
| $55,450 |
| $9,999,000 |
| $325,000 |
| $208,000 |
| $52,000,000 |
| $112,600 |
| $25,250 |
| $812,000 |
| $53,400 |
| $69,700 |
| $23,550 |
| $23,900 |
| $5,350 |
| $319,100 |
| $55,150 |
| $28,200 |
| $49,900 |
| $344,600 |
| $48,550 |
| $498,000 |
| $28,200 |
| $88,550 |
| $27,300 |
| $39,550,000 |
| $61,700 |
| $232,618 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sistema, Panel x 1 m2 x 0.04 m | 1.05 | 56,500 | 59,325 |
Malla plana RG2 | 0.4 | 5,350 | 2,140 |
Malla RGU 80 | 0.5 | 6,500 | 3,250 |
Malla angular RG1 | 0.5 | 6,700 | 3,350 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.055 | 473,449 | 26,040 |
Arena lavada de río 1 m3 | 0.0704 | 95,019 | 6,689 |
Cemento 1 Kg | 21.01 | 798 | 16,766 |
Agua para la obra 1 litro | 13.2 | 36 | 480 |
Ayudante de construcción x 1 hora | 0.011 | 9,108 | 100 |
Ayudante de construcción x 1 hora | 0.22 | 9,108 | 2,004 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.258 | 31,013 | 8,001 |
Acero G-60 x 1 Kg | 1.538712 | 5,200 | 8,001 |
Valor Adicional: | 102,106 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 5 | 5,200 | 26,000 |
Salario mínimo mensual vigente, base | 0.02 | 1,300,000 | 26,000 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 26,156 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.1 | 232,618 | 23,262 |
Sistema, Panel x 1 m2 x 0.04 m | 0.105 | 56,500 | 5,933 |
Malla plana RG2 | 0.04 | 5,350 | 214 |
Malla RGU 80 | 0.05 | 6,500 | 325 |
Malla angular RG1 | 0.05 | 6,700 | 335 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.0055 | 473,449 | 2,604 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0258 | 31,013 | 800 |
Cuadrilla de instalaciones x 1 Hora | 0.01508 | 26,955 | 406 |
Cuadrilla de instalaciones x 1 Hora | 0.1508 | 26,955 | 4,065 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.5 | 5,200 | 2,600 |
Transporte 1 tonelada x 1 kilómetro | 0.004 | 3,900 | 16 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Valor Adicional: | 23,262 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.1 | 232,618 | 23,262 |
Sistema, Panel x 1 m2 x 0.04 m | 0.105 | 56,500 | 5,933 |
Malla plana RG2 | 0.04 | 5,350 | 214 |
Malla RGU 80 | 0.05 | 6,500 | 325 |
Malla angular RG1 | 0.05 | 6,700 | 335 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.0055 | 473,449 | 2,604 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0258 | 31,013 | 800 |
Cuadrilla de instalaciones x 1 Hora | 0.01508 | 26,955 | 406 |
Cuadrilla de instalaciones x 1 Hora | 0.1508 | 26,955 | 4,065 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.5 | 5,200 | 2,600 |
Transporte 1 tonelada x 1 kilómetro | 0.004 | 3,900 | 16 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Valor Adicional: | 23,262 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.05 | 232,618 | 11,631 |
Sistema, Panel x 1 m2 x 0.04 m | 0.0525 | 56,500 | 2,966 |
Malla plana RG2 | 0.02 | 5,350 | 107 |
Malla RGU 80 | 0.025 | 6,500 | 163 |
Malla angular RG1 | 0.025 | 6,700 | 168 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.00275 | 473,449 | 1,302 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0129 | 31,013 | 400 |
Cuadrilla de instalaciones x 1 Hora | 0.00754 | 26,955 | 203 |
Cuadrilla de instalaciones x 1 Hora | 0.0754 | 26,955 | 2,032 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.25 | 5,200 | 1,300 |
Transporte 1 tonelada x 1 kilómetro | 0.002 | 3,900 | 8 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.0025 | 232,618 | 582 |
Muro panel doble cara x 1 m2 | 0.00032 | 232,618 | 74 |
Valor Adicional: | 11,631 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.0064 | 232,618 | 1,489 |
Sistema, Panel x 1 m2 x 0.04 m | 0.00672 | 56,500 | 380 |
Malla plana RG2 | 0.00256 | 5,350 | 14 |
Malla RGU 80 | 0.0032 | 6,500 | 21 |
Malla angular RG1 | 0.0032 | 6,700 | 21 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.000352 | 473,449 | 167 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0016512 | 31,013 | 51 |
Cuadrilla de instalaciones x 1 Hora | 0.00096512 | 26,955 | 26 |
Cuadrilla de instalaciones x 1 Hora | 0.0096512 | 26,955 | 260 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.032 | 5,200 | 166 |
Transporte 1 tonelada x 1 kilómetro | 0.000256 | 3,900 | 1 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Muro panel doble cara x 1 m2 | 0.00032 | 232,618 | 74 |
Muro panel doble cara x 1 m2 | 4.096E-5 | 232,618 | 10 |
Valor Adicional: | 1,489 |
| $60,150 |
| $63,100 |
| $441,500 |
| $23,350 |
| $661,400 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.