| $1,950,000 |
| $87,000 |
| $104,000 |
| $380,000 |
| $180,000 |
| $114,500 |
| $82,000 |
| $49,450 |
| $85,650 |
| $107,900 |
| $6,325,000 |
| $208,000 |
| $176,650 |
| $100,650 |
| $150,900 |
| $463,450 |
| $802,450 |
| $238,000 |
| $173,800 |
| $284,350 |
| $14,299 |
| $26,700 |
| $91,000 |
| $6,765,000 |
| $1,885,050 |
| $200,000 |
| $33,700 |
| $29,500 |
| $8,666 |
| $78,950 |
| $56,600 |
| $1,650,000 |
| $91,000 |
| $6,150,000 |
| $104,000 |
| $501,650 |
| $178,500 |
| $88,600 |
| $2,200,000 |
| $641,000 |
| $100,000,000,000 |
| $195,000 |
| $75,750 |
| $98,000 |
| $78,000 |
| $178,700 |
| $1,170,000 |
| $85,000 |
| $88,500 |
| $307,950 |
| $468,000 |
| $124,800 |
| $143,000 |
| $57,900 |
| $1,650,000 |
| $130,000 |
| $269,000 |
| $28,000 |
| $145,000 |
| $207,000 |
| $75,400 |
| $28,890 |
| $138,250 |
| $735,000 |
| $101,400 |
| $11,699 |
| $325,000 |
| $49,900 |
| $1,560,000 |
| $286,000 |
| $414,700 |
| $97,500 |
| $28,000 |
| $1,933,961 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Apartamento nuevo en edificio de 10 plantas, Precio por 1 m2 | 1 | 1,933,961 | 1,933,961 |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00014968019 | 12,920,619,720 | 1,933,961 |
Valor Adicional: | 1,933,961 |
| $140,000 |
| $28,200 |
| $344,600 |
| $294,970 |
| $588,000 |
| $1,560,000 |
| $63,100 |
| $476,619 |
| $319,100 |
| $28,200 |
| $28,200 |
| $102,700 |
| $28,200 |
| $28,200 |
| $96,642,307 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 51.58 | 533,055 | 27,494,990 |
Arena lavada de río 1 m3 | 30.32904 | 95,019 | 2,881,835 |
Cemento 1 Kg | 18955.65 | 798 | 15,126,609 |
Triturado de 3/4" x 1 m3 | 45.49356 | 150,500 | 6,846,781 |
Agua para la obra 1 litro | 10290.21 | 36 | 374,564 |
Mezcladora 1 bulto, alquiler x hora | 24.7584 | 7,150 | 177,023 |
Cuadrilla 7 (8 obreros) x jornal | 3.6106 | 578,347 | 2,088,180 |
Acero G-60 x 1 Kg | 2170 | 5,200 | 11,284,000 |
Cuadrilla de albañileria x 1 Hora | 800 | 24,504 | 19,603,511 |
Oficial de construcción x hora | 800 | 15,397 | 12,317,250 |
Ayudante de construcción x 1 hora | 800 | 9,108 | 7,286,261 |
Valor Adicional: | 58,382,502 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 5 | 533,055 | 2,665,276 |
Arena lavada de río 1 m3 | 2.94 | 95,019 | 279,356 |
Cemento 1 Kg | 1837.5 | 798 | 1,466,325 |
Triturado de 3/4" x 1 m3 | 4.41 | 150,500 | 663,705 |
Agua para la obra 1 litro | 997.5 | 36 | 36,309 |
Mezcladora 1 bulto, alquiler x hora | 2.4 | 7,150 | 17,160 |
Cuadrilla 7 (8 obreros) x jornal | 0.35 | 578,347 | 202,421 |
Acero G-60 x 1 Kg | 1300 | 5,200 | 6,760,000 |
Valor Adicional: | 9,425,276 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| $44,047 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 0.2 | 20,300 | 4,060 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 0.05 | 30,700 | 1,535 |
Codo PVC 90° presión de 1/2" x 10 unidades | 0.1 | 45,000 | 4,500 |
Soldadura para PVC 1/4 de galón | 0.04 | 53,500 | 2,140 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.015 | 77,000 | 1,155 |
Valor Adicional: | 13,390 |
| $91,000 |
| $143,300 |
| $415,600 |
| $551,700 |
| $210,800 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.