| $13,270,000 |
| $78,500 |
| $445,300 |
| $99,000 |
| $182,000 |
| $99,000 |
| $355,000 |
| $67,950 |
| $40,079 |
| $36,650 |
| $50,000 |
| $20,907 |
| $533,055 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| $53,095 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Agua para la obra 1 litro | 5 | 36 | 182 |
Salario mínimo mensual vigente, base | 0.00014 | 1,300,000 | 182 |
Cemento Blanco x 1 Kg | 4 | 2,340 | 9,360 |
Cuadrilla de albañileria x 1 Hora | 1.2 | 24,504 | 29,405 |
Oficial de construcción x hora | 1.2 | 15,397 | 18,476 |
Ayudante de construcción x 1 hora | 1.2 | 9,108 | 10,929 |
Granito de marmol blanco bulto de 35 Kg | 0.06 | 69,650 | 4,179 |
marmolina x 5 Kg | 0.4 | 6,900 | 2,760 |
Cuadrilla de albañileria x 1 Hora | 0.12 | 24,504 | 2,941 |
Oficial de construcción x hora | 0.12 | 15,397 | 1,848 |
Ayudante de construcción x 1 hora | 0.12 | 9,108 | 1,093 |
Pulidora de 9" 6500 RPM 2700W | 0.005 | 853,600 | 4,268 |
Valor Adicional: | 53,095 |
| $58,492 |
| $40,150 |
| $135,708 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.2 | 5,200 | 1,040 |
Salario mínimo mensual vigente, base | 0.0008 | 1,300,000 | 1,040 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 1,196 |
| $444,750 |
| $1,300,000 |
| $818,067 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 1 | 533,055 | 533,055 |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Mezcladora 1 bulto, alquiler x hora | 0.48 | 7,150 | 3,432 |
Cuadrilla 7 (8 obreros) x jornal | 0.07 | 578,347 | 40,484 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 2.96 | 13,000 | 38,480 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.15 | 155,000 | 23,250 |
Repisa 2.8 m x 0,075 m x 0.037 m | 0.36 | 10,000 | 3,600 |
| 1.31 | 0 | 0 |
Valor Adicional: | 598,385 |
| $1 |
| $141,747 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.3675 | 5,200 | 1,911 |
Salario mínimo mensual vigente, base | 0.00147 | 1,300,000 | 1,911 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 2,067 |
| $310,400 |
| $140,813 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.2 | 5,200 | 1,040 |
Salario mínimo mensual vigente, base | 0.0008 | 1,300,000 | 1,040 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 1,196 |
| $13,213 |
| $28,600,000 |
| $28,597 |
| $37,950 |
| $14,000 |
| $130,000 |
| $42,650 |
| $90,000 |
| $86,750 |
| $100,100 |
| $39,300 |
| $0 |
| $105,500 |
| $849,950 |
| $60,550 |
| $91,000 |
| $4,559,900 |
| $0 |
| $3,019,500 |
| $55,350 |
| $897,000 |
| $294,970 |
| $86,200 |
| $0 |
| $102,700 |
| $54,250 |
| $2,010,375,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño de pavimento por unidad homogénea de diseño, según cbr y tránsito | 3 | 3,900,000 | 11,700,000 |
Salario mínimo mensual vigente, base | 9 | 1,300,000 | 11,700,000 |
Valor Adicional: | 11,700,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Subbase triturada de 2" x 1 m3 | 2100 | 125,200 | 262,920,000 |
Base granular de 1 1/2" x m3 | 2100 | 126,550 | 265,755,000 |
Asfalto 60/70 por tonelada | 700 | 2,100,000 | 1,470,000,000 |
Valor Adicional: | 1,998,675,000 |
| $2,350,600 |
| $64,450 |
| $7,194,000 |
| $65,500 |
| $2,250,000 |
| $67,550 |
| $0 |
| $24,000 |
| $45,500 |
| $107,900 |
| $2,999,950 |
| $0 |
| $105,300 |
| $130,000 |
| $97,500 |
| $180,000 |
| $104,000 |
| $87,000 |
| $338,000 |
| $90,900 |
| $0 |
| $98,798 |
Descripción | Cantidad | Valor Unitario | Valor Total |
| 0.1 | 0 | 0 |
| 0.05 | 0 | 0 |
5 Cajas plásticas PVC 2400 cuadradas de 4"x4" | 0.2 | 31,950 | 6,390 |
Roseta de porcelana 4.5" | 1 | 26,350 | 26,350 |
Tubo de 1/2" y 3 m de longitud, Conduit metálico eléctrico, EMT | 0.33 | 45,300 | 14,949 |
Adaptador terminal conduit 3/4" x 10 unidades | 0.1 | 27,500 | 2,750 |
Valor Adicional: | 50,439 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.3675 | 5,200 | 1,911 |
Salario mínimo mensual vigente, base | 0.00147 | 1,300,000 | 1,911 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 2,067 |
| $66,500 |
| $130,000 |
| $260,000 |
| $40,000 |
| $71,500 |
| $82,000 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.