| $1,990,000 |
| $25,000 |
| $1,399,900 |
| $551,700 |
| $47,400 |
| $1,250,000 |
| $49,050 |
| $910,000 |
| $88,550 |
| $27,300 |
| $97,500 |
| $40,900 |
| $111,800 |
| $104,000 |
| $232,618 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sistema, Panel x 1 m2 x 0.04 m | 1.05 | 56,500 | 59,325 |
Malla plana RG2 | 0.4 | 5,350 | 2,140 |
Malla RGU 80 | 0.5 | 6,500 | 3,250 |
Malla angular RG1 | 0.5 | 6,700 | 3,350 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.055 | 473,449 | 26,040 |
Arena lavada de río 1 m3 | 0.0704 | 95,019 | 6,689 |
Cemento 1 Kg | 21.01 | 798 | 16,766 |
Agua para la obra 1 litro | 13.2 | 36 | 480 |
Ayudante de construcción x 1 hora | 0.011 | 9,108 | 100 |
Ayudante de construcción x 1 hora | 0.22 | 9,108 | 2,004 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.258 | 31,013 | 8,001 |
Acero G-60 x 1 Kg | 1.538712 | 5,200 | 8,001 |
Valor Adicional: | 102,106 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 5 | 5,200 | 26,000 |
Salario mínimo mensual vigente, base | 0.02 | 1,300,000 | 26,000 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 26,156 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.1 | 232,618 | 23,262 |
Sistema, Panel x 1 m2 x 0.04 m | 0.105 | 56,500 | 5,933 |
Malla plana RG2 | 0.04 | 5,350 | 214 |
Malla RGU 80 | 0.05 | 6,500 | 325 |
Malla angular RG1 | 0.05 | 6,700 | 335 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.0055 | 473,449 | 2,604 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0258 | 31,013 | 800 |
Cuadrilla de instalaciones x 1 Hora | 0.01508 | 26,955 | 406 |
Cuadrilla de instalaciones x 1 Hora | 0.1508 | 26,955 | 4,065 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.5 | 5,200 | 2,600 |
Transporte 1 tonelada x 1 kilómetro | 0.004 | 3,900 | 16 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Valor Adicional: | 23,262 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.1 | 232,618 | 23,262 |
Sistema, Panel x 1 m2 x 0.04 m | 0.105 | 56,500 | 5,933 |
Malla plana RG2 | 0.04 | 5,350 | 214 |
Malla RGU 80 | 0.05 | 6,500 | 325 |
Malla angular RG1 | 0.05 | 6,700 | 335 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.0055 | 473,449 | 2,604 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0258 | 31,013 | 800 |
Cuadrilla de instalaciones x 1 Hora | 0.01508 | 26,955 | 406 |
Cuadrilla de instalaciones x 1 Hora | 0.1508 | 26,955 | 4,065 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.5 | 5,200 | 2,600 |
Transporte 1 tonelada x 1 kilómetro | 0.004 | 3,900 | 16 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Valor Adicional: | 23,262 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.05 | 232,618 | 11,631 |
Sistema, Panel x 1 m2 x 0.04 m | 0.0525 | 56,500 | 2,966 |
Malla plana RG2 | 0.02 | 5,350 | 107 |
Malla RGU 80 | 0.025 | 6,500 | 163 |
Malla angular RG1 | 0.025 | 6,700 | 168 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.00275 | 473,449 | 1,302 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0129 | 31,013 | 400 |
Cuadrilla de instalaciones x 1 Hora | 0.00754 | 26,955 | 203 |
Cuadrilla de instalaciones x 1 Hora | 0.0754 | 26,955 | 2,032 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.25 | 5,200 | 1,300 |
Transporte 1 tonelada x 1 kilómetro | 0.002 | 3,900 | 8 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.0025 | 232,618 | 582 |
Muro panel doble cara x 1 m2 | 0.00032 | 232,618 | 74 |
Valor Adicional: | 11,631 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.0064 | 232,618 | 1,489 |
Sistema, Panel x 1 m2 x 0.04 m | 0.00672 | 56,500 | 380 |
Malla plana RG2 | 0.00256 | 5,350 | 14 |
Malla RGU 80 | 0.0032 | 6,500 | 21 |
Malla angular RG1 | 0.0032 | 6,700 | 21 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.000352 | 473,449 | 167 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0016512 | 31,013 | 51 |
Cuadrilla de instalaciones x 1 Hora | 0.00096512 | 26,955 | 26 |
Cuadrilla de instalaciones x 1 Hora | 0.0096512 | 26,955 | 260 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.032 | 5,200 | 166 |
Transporte 1 tonelada x 1 kilómetro | 0.000256 | 3,900 | 1 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Muro panel doble cara x 1 m2 | 0.00032 | 232,618 | 74 |
Muro panel doble cara x 1 m2 | 4.096E-5 | 232,618 | 10 |
Valor Adicional: | 1,489 |
| $34,500 |
| $6,760 |
| $78,500 |
| $40,150 |
| $24,850 |
| $20,280 |
| $208,000 |
| $97,500 |
| $48,550 |
| $5,043 |
| $4,549,545 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario diario vigente | 105 | 43,329 | 4,549,545 |
Salario mínimo mensual vigente, base | 3.49965 | 1,300,000 | 4,549,545 |
Valor Adicional: | 4,549,545 |
| $28,200 |
| $1,560,000 |
| $10,400,000 |
| $97,500 |
| $77,000 |
| $25,500 |
| $69,700 |
| $49,900 |
| $325,000 |
| $41,400 |
| $42,600 |
| $29,850 |
| $79,000 |
| $2,380,250 |
| $6,760 |
| $134,550 |
| $54,150 |
| $97,500 |
| $39,000 |
| $43,000 |
| $130,000 |
| $90,900 |
| $93,000 |
| $20,000 |
| $130,000 |
| $63,150 |
| $325,000 |
| $96,642,307 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 51.58 | 533,055 | 27,494,990 |
Arena lavada de río 1 m3 | 30.32904 | 95,019 | 2,881,835 |
Cemento 1 Kg | 18955.65 | 798 | 15,126,609 |
Triturado de 3/4" x 1 m3 | 45.49356 | 150,500 | 6,846,781 |
Agua para la obra 1 litro | 10290.21 | 36 | 374,564 |
Mezcladora 1 bulto, alquiler x hora | 24.7584 | 7,150 | 177,023 |
Cuadrilla 7 (8 obreros) x jornal | 3.6106 | 578,347 | 2,088,180 |
Acero G-60 x 1 Kg | 2170 | 5,200 | 11,284,000 |
Cuadrilla de albañileria x 1 Hora | 800 | 24,504 | 19,603,511 |
Oficial de construcción x hora | 800 | 15,397 | 12,317,250 |
Ayudante de construcción x 1 hora | 800 | 9,108 | 7,286,261 |
Valor Adicional: | 58,382,502 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 5 | 533,055 | 2,665,276 |
Arena lavada de río 1 m3 | 2.94 | 95,019 | 279,356 |
Cemento 1 Kg | 1837.5 | 798 | 1,466,325 |
Triturado de 3/4" x 1 m3 | 4.41 | 150,500 | 663,705 |
Agua para la obra 1 litro | 997.5 | 36 | 36,309 |
Mezcladora 1 bulto, alquiler x hora | 2.4 | 7,150 | 17,160 |
Cuadrilla 7 (8 obreros) x jornal | 0.35 | 578,347 | 202,421 |
Acero G-60 x 1 Kg | 1300 | 5,200 | 6,760,000 |
Valor Adicional: | 9,425,276 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| $45,500 |
| $777 |
| $32,500 |
| $916,250 |
| $1,420,350 |
| $32,500 |
| $228,300 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.