Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| $2,380,250 |
| $121,250 |
| $104,000 |
| $102,100 |
| $25,200 |
| $20,900 |
| $21,100 |
| $699,000 |
| $168,900 |
| $78,700 |
| $43,400 |
| $81,350 |
| $63,321 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 0.0292 | 2,168,530 | 63,321 |
Salario mínimo mensual vigente, base | 0.0292 | 1,300,000 | 37,960 |
Salario mínimo mensual vigente, base | 0.00363832 | 1,300,000 | 4,730 |
Salario mínimo mensual vigente, base | 0.003504 | 1,300,000 | 4,555 |
Salario mínimo mensual vigente, base | 0.002482 | 1,300,000 | 3,227 |
Salario mínimo mensual vigente, base | 0.002628 | 1,300,000 | 3,416 |
Salario mínimo mensual vigente, base | 0.00243236 | 1,300,000 | 3,162 |
Salario mínimo mensual vigente, base | 0.000292 | 1,300,000 | 380 |
Salario mínimo mensual vigente, base | 0.00015184 | 1,300,000 | 197 |
Salario mínimo mensual vigente, base | 0.00243236 | 1,300,000 | 3,162 |
Salario mínimo mensual vigente, base | 0.00121764 | 1,300,000 | 1,583 |
Salario mínimo mensual vigente, base | 0.00073 | 1,300,000 | 949 |
Valor Adicional: | 63,321 |
| $36,000 |
| $36,650 |
| $368,000 |
| $143,300 |
| $355,000 |
| $47,250 |
| $62,050 |
| $26,350 |
| $99,000 |
| $50,600 |
| $3,946,500 |
| $50,200 |
| $62,050 |
| $187,800 |
| $50,600 |
| $99,000 |
| $31,950 |
| $20,500 |
| $95,550 |
| $65,000 |
| $34,150 |
| $70,000 |
| $681,500 |
| $33,300 |
| $261,350 |
| $39,400 |
| $45,300 |
| $1,447,300 |
| $230,500 |
| $51,995 |
| $35,200 |
| $140,850 |
| $90,300 |
| $62,000 |
| $127,900 |
| $43,400 |
| $36,450 |
| $210,000 |
| $49,900 |
| $34,250 |
| $37,700 |
| $87,000 |
| $49,000 |
| $40,600 |
| $31,250 |
| $2,300,000 |
| $22,750 |
| $52,900 |
| $28,400 |
| $1,418,000 |
| $49,900 |
| $29,700 |
| $24,800 |
| $46,650 |
| $35,650 |
| $140,800 |
| $128,100 |
| $107,200 |
| $29,000 |
| $73,000 |
| $45,750 |
| $55,100 |
| $34,250 |
| $41,800 |
| $59,900 |
| $54,650 |
| $131,900 |
| $58,750 |
| $38,450 |
| $80,500 |
| $302,800 |
| $63,100 |
| $94,000 |
| $70,700 |
| $27,400 |
| $293,700 |
| $91,650 |
| $85,500 |
| $130,750 |
| $83,200 |
| $320,000 |
| $184,000 |
| $25,000 |
| $3,202,290 |
| $142,150 |
| $4,380,810 |
| $60,150 |
| $44,000 |
| $105,300 |
| $6,760 |
| $23,398 |
| $22,400 |
| $85,000 |
| $391,230 |
| $1,199,995 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Hora de ingeniero | 32.3607 | 37,082 | 1,199,995 |
Salario mínimo mensual vigente, incluyendo complementos | 0.55336797 | 2,168,530 | 1,199,995 |
Valor Adicional: | 1,199,995 |
| $429,000 |
| $50,000 |
| $91,000 |
| $5,043 |
| $2,757,930 |
| $12,843,900 |
| $17,000 |
| $111,800 |
| $3,748,080 |
| $150,000 |
| $1,482,810 |
| $78,000 |
| $520,000 |
| $170,950 |
| $45,500 |
| $28,000 |
| $91,000 |
| $49,700 |
| $75,000 |
| $760,000 |
| $90,000 |
| $97,500 |
| $23,700 |
| $0 |
| $1,743,630 |
| $68,247,140 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto premezclado de 4000 PSI o 27.6 MPa x 1 m3 | 100 | 682,471 | 68,247,140 |
Arena lavada de río 1 m3 | 60 | 95,019 | 5,701,140 |
Cemento 1 Kg | 42000 | 798 | 33,516,000 |
Triturado de 3/4" x 1 m3 | 60 | 150,500 | 9,030,000 |
Planta de concreto precio por hora | 20 | 1,000,000 | 20,000,000 |
Valor Adicional: | 68,247,140 |
| $390,000 |
| $908,040 |
| $4,549,545 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario diario vigente | 105 | 43,329 | 4,549,545 |
Salario mínimo mensual vigente, base | 3.49965 | 1,300,000 | 4,549,545 |
Valor Adicional: | 4,549,545 |
| $125,000 |
| $763,140 |
| $502,320 |
| $78,000 |
| $23,065 |
| $18,850,900 |
| $70,000 |
| $325,000 |
| $23,065 |
| $0 |
| $40,000 |
| $37,082 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 0.0171 | 2,168,530 | 37,082 |
Salario mínimo mensual vigente, base | 0.0171 | 1,300,000 | 22,230 |
Salario mínimo mensual vigente, base | 0.00213066 | 1,300,000 | 2,770 |
Salario mínimo mensual vigente, base | 0.002052 | 1,300,000 | 2,668 |
Salario mínimo mensual vigente, base | 0.0014535 | 1,300,000 | 1,890 |
Salario mínimo mensual vigente, base | 0.001539 | 1,300,000 | 2,001 |
Salario mínimo mensual vigente, base | 0.00142443 | 1,300,000 | 1,852 |
Salario mínimo mensual vigente, base | 0.000171 | 1,300,000 | 222 |
Salario mínimo mensual vigente, base | 8.892E-5 | 1,300,000 | 116 |
Salario mínimo mensual vigente, base | 0.00142443 | 1,300,000 | 1,852 |
Salario mínimo mensual vigente, base | 0.00071307 | 1,300,000 | 927 |
Salario mínimo mensual vigente, base | 0.0004275 | 1,300,000 | 556 |
Valor Adicional: | 37,082 |
| $20,280 |
| $93,400 |
| $1,265,460 |
| $195,000 |
| $57,194 |
| $1,430,000 |
| $102,700 |
| $40,000 |
| $1,100,000 |
| $623,070 |
| $2,044,700 |
| $200,000 |
| $130,000 |
| $830,000 |
| $2,371,530 |
| $1,287,000 |
| $1,235,000 |
| $39,000 |
| $0 |
| $7,720,000 |
| $40,000 |
| $45,000 |
| $99,000 |
| $40,000 |
| $198,300 |
| $48,000 |
| $360,000 |
| $860,000 |
| $212,700 |
| $169,000 |
| $588,000 |
| $149,000 |
| $380,000 |
| $82,000 |
| $267,100 |
| $3,300,000 |
| $320,000 |
| $70,350 |
| $57,000 |
| $0 |
| $50,000 |
| $0 |
| $292,950 |
| $387,700 |
| $104,000 |
| $702,000 |
| $102,700 |
| $50,350 |
| $286,000 |
| $39,800 |
| $969,000 |
| $25,000 |
| $475,400 |
| $4,200 |
| $20,000 |
| $101,950 |
| $235,600 |
| $25,000 |
| $520,000 |
| $299,000 |
| $1,820,000 |
| $97,500 |
| $25,000 |
| $45,500 |
| $1,735,050 |
| $56,450 |
| $585,000 |
| $104,000 |
| $183,700 |
| $589,139 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| $42,150 |
| $325,000 |
| $702,000 |
| $6,845 |
| $1,050,000 |
| $165,750 |
| $755,000 |
| $150,000 |
| $81,550 |
| $1,800 |
| $35,000 |
| $370,000 |
| $2,790,000 |
| $33,750 |
| $476,619 |
| $550,000 |
| $99,000 |
| $1,300,000 |
| $30,700 |
| $54,500 |
| $1,933,961 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Apartamento nuevo en edificio de 10 plantas, Precio por 1 m2 | 1 | 1,933,961 | 1,933,961 |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00014968019 | 12,920,619,720 | 1,933,961 |
Valor Adicional: | 1,933,961 |
| $39,000,000 |
| $174,000 |
| $1,075,000 |
| $268,700 |
| $611,310 |
| $254,350 |
| $68,150 |
| $133,200 |
| $78,000 |
| $307,900 |
| $1,650,000 |
| $87,000 |
| $390,000 |
| $350,000 |
| $44,900 |
| $287,196 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Estructura de pavimento flexible, presupuesto de construcción de 1 Km de vía 7 m de ancho | 0.0001428571 | 2,010,375,000 | 287,196 |
Diseño de pavimento por unidad homogénea de diseño, según cbr y tránsito | 0.0004285713 | 3,900,000 | 1,671 |
Subbase triturada de 2" x 1 m3 | 0.29999991 | 125,200 | 37,560 |
Base granular de 1 1/2" x m3 | 0.29999991 | 126,550 | 37,965 |
Asfalto 60/70 por tonelada | 0.09999997 | 2,100,000 | 210,000 |
Valor Adicional: | 287,196 |
| $96,642,307 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 51.58 | 533,055 | 27,494,990 |
Arena lavada de río 1 m3 | 30.32904 | 95,019 | 2,881,835 |
Cemento 1 Kg | 18955.65 | 798 | 15,126,609 |
Triturado de 3/4" x 1 m3 | 45.49356 | 150,500 | 6,846,781 |
Agua para la obra 1 litro | 10290.21 | 36 | 374,564 |
Mezcladora 1 bulto, alquiler x hora | 24.7584 | 7,150 | 177,023 |
Cuadrilla 7 (8 obreros) x jornal | 3.6106 | 578,347 | 2,088,180 |
Acero G-60 x 1 Kg | 2170 | 5,200 | 11,284,000 |
Cuadrilla de albañileria x 1 Hora | 800 | 24,504 | 19,603,511 |
Oficial de construcción x hora | 800 | 15,397 | 12,317,250 |
Ayudante de construcción x 1 hora | 800 | 9,108 | 7,286,261 |
Valor Adicional: | 58,382,502 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 5 | 533,055 | 2,665,276 |
Arena lavada de río 1 m3 | 2.94 | 95,019 | 279,356 |
Cemento 1 Kg | 1837.5 | 798 | 1,466,325 |
Triturado de 3/4" x 1 m3 | 4.41 | 150,500 | 663,705 |
Agua para la obra 1 litro | 997.5 | 36 | 36,309 |
Mezcladora 1 bulto, alquiler x hora | 2.4 | 7,150 | 17,160 |
Cuadrilla 7 (8 obreros) x jornal | 0.35 | 578,347 | 202,421 |
Acero G-60 x 1 Kg | 1300 | 5,200 | 6,760,000 |
Valor Adicional: | 9,425,276 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| $104,000 |
| $41,200 |
| $1,500,000 |
| $39,000 |
| $50,000 |
| $37,600 |
| $380,000 |
| $599,000 |
| $69,000 |
| $12,300,000 |
| $363,950 |
| $1,650,000 |
| $239,700 |
| $35,800 |
| $37,400 |
| $325,000 |
| $97,500 |
| $1,933,961 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00014968019 | 12,920,619,720 | 1,933,961 |
Terreno, predio, lote precio por 1m2 | 0.374200475 | 1,000,000 | 374,200 |
Levantamiento topográfico hasta 1,000 m2 | 0.00029936038 | 2,600,000 | 778 |
Replanteo Arquitectónico X 1 m2 | 1.22213875135 | 10,038 | 12,267 |
Diseño arquitectónico de edificios x 1 m2 | 1.22213875135 | 14,000 | 17,110 |
Estudio de suelos y geotecnia desde | 0.00059872076 | 4,147,000 | 2,483 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 1.22213875135 | 10,400 | 12,710 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.22213875135 | 13,520 | 16,523 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.22213875135 | 16,000 | 19,554 |
Excavación mecánica en conglomerado x 1 m3 | 1.09925131536 | 4,551 | 5,003 |
Piloteadora, alquiler por Hora | 0.0119744152 | 390,000 | 4,670 |
Acero G-60 x 1 Kg | 61.43383910246 | 5,200 | 319,456 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.31896848489 | 533,055 | 170,028 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.04984350327 | 854,441 | 42,588 |
Steel deck metaldeck grado 40 | 0.24442775027 | 451,000 | 110,237 |
Kit Mueble para baño + lavamanos | 0.0179616228 | 484,450 | 8,702 |
Punto agua fria PVC 1/2" | 0.1077697368 | 44,047 | 4,747 |
Tubo 1" x 6 m RDE 13.5 | 0.089808114 | 63,000 | 5,658 |
Sanitario suministro e instalación | 0.0179616228 | 1,077,612 | 19,356 |
Punto desagüe sanitario pvc 4" | 0.089808114 | 68,312 | 6,135 |
Caja de inspección y distribución | 0.0239488304 | 207,000 | 4,957 |
Tubería PVC sanitaria 4" | 0.059872076 | 156,100 | 9,346 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.0059872076 | 23,113 | 138 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.1975778508 | 23,313 | 4,606 |
Panel de 80W para sistema de energía solar | 0.0239488304 | 920,900 | 22,054 |
Inversor de voltaje 300W | 0.0059872076 | 297,050 | 1,779 |
Caja de control sistema de energía solar | 0.0059872076 | 1,018,750 | 6,099 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.0239488304 | 731,600 | 17,521 |
Tablero trifásico con puerta de 24 circuitos | 0.0059872076 | 321,000 | 1,922 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.0239488304 | 395,000 | 9,460 |
Muro drywall doble cara x 1 m2 | 0.7753433842 | 153,842 | 119,280 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 0.778336988 | 178,966 | 139,296 |
Ascensor 8 personas | 0.00029936038 | 99,900,000 | 29,906 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1.511769919 | 12,828 | 19,393 |
Geomembrana Instalación x 1 m2 | 0.44904057 | 13,477 | 6,052 |
Cepillera Attica | 0.014968019 | 28,850 | 432 |
Espejo de 2mm de espesor *1 m2 | 0.029936038 | 93,700 | 2,805 |
Argolla toalla attica | 0.014968019 | 36,250 | 543 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 1.8934544035 | 141,747 | 268,391 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0014968019 | 140,813 | 211 |
Administración | 47021.13360736 | 1 | 47,021 |
Imprevistos | 23521.34377736 | 1 | 23,521 |
Utilidad | 47021.13360736 | 1 | 47,021 |
Valor Adicional: | 1,933,961 |
| $78,500 |
| $2,499,000 |
| $682,471 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.6 | 95,019 | 57,011 |
Arena lavada de río 6 m3 | 0.10002 | 570,000 | 57,011 |
Cemento 1 Kg | 420 | 798 | 335,160 |
Cemento, bulto de 50 Kg | 8.4 | 39,900 | 335,160 |
Triturado de 3/4" x 1 m3 | 0.6 | 150,500 | 90,300 |
Grava 3/4" x 6 m3 | 0.100000002 | 903,000 | 90,300 |
Valor Adicional: | 482,471 |
| $33,650 |
| $105,300 |
| $105,300 |
| $6,325,000 |
| $400,000 |
| $8,666 |
| $50,000 |
| $163,550 |
| $14,299 |
| $15,179,710 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 7 | 2,168,530 | 15,179,710 |
Salario mínimo mensual vigente, base | 7 | 1,300,000 | 9,100,000 |
Salario mínimo mensual vigente, base | 0.8722 | 1,300,000 | 1,133,860 |
Salario mínimo mensual vigente, base | 0.84 | 1,300,000 | 1,092,000 |
Salario mínimo mensual vigente, base | 0.595 | 1,300,000 | 773,500 |
Salario mínimo mensual vigente, base | 0.63 | 1,300,000 | 819,000 |
Salario mínimo mensual vigente, base | 0.5831 | 1,300,000 | 758,030 |
Salario mínimo mensual vigente, base | 0.07 | 1,300,000 | 91,000 |
Salario mínimo mensual vigente, base | 0.0364 | 1,300,000 | 47,320 |
Salario mínimo mensual vigente, base | 0.5831 | 1,300,000 | 758,030 |
Salario mínimo mensual vigente, base | 0.2919 | 1,300,000 | 379,470 |
Salario mínimo mensual vigente, base | 0.175 | 1,300,000 | 227,500 |
Valor Adicional: | 15,179,710 |
| $6,228,000 |
| $1,170,000 |
| $104,000 |
| $50,000 |
| $34,650 |
| $11,000 |
| $471,500 |
| $1,560,000 |
| $2,535,000 |
| $6,765,000 |
| $1,650,000 |
| $173,750 |
| $75,000 |
| $85,000 |
| $143,000 |
| $64,994 |
| $338,000 |
| $518,000 |
| $101,400 |
| $19,900 |
| $2,600,000 |
| $97,500 |
| $195,000 |
| $65,000 |
| $1,290,536 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa nueva de 1 planta y 209 m2 presupuesto de construcción | 0.004758 | 271,234,996 | 1,290,536 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 0.994422 | 3,900 | 3,878 |
Levantamiento topográfico hasta 1,000 m2 | 0.004758 | 2,600,000 | 12,371 |
Replanteo Arquitectónico X 1 m2 | 0.994422 | 10,038 | 9,982 |
Diseño arquitectónico de casa personalizada x 1 m2 | 0.994422 | 28,597 | 28,438 |
Estudio de suelos y geotecnia desde | 0.004758 | 4,147,000 | 19,731 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.004758 | 11,001 | 52 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 0.994422 | 13,520 | 13,445 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 0.994422 | 16,000 | 15,911 |
Excavación manual en conglomerado x 1 m3 | 0.04758 | 58,492 | 2,783 |
Kit Mueble para baño + lavamanos | 0.014274 | 484,450 | 6,915 |
Punto agua fria PVC 1/2" | 0.085644 | 44,047 | 3,772 |
Tubo 1" x 6 m RDE 13.5 | 0.07137 | 63,000 | 4,496 |
Sanitario suministro e instalación | 0.014274 | 1,077,612 | 15,382 |
Punto desagüe sanitario pvc 4" | 0.07137 | 68,312 | 4,875 |
Caja de inspección y distribución | 0.019032 | 207,000 | 3,940 |
Tubería PVC sanitaria 4" | 0.04758 | 156,100 | 7,427 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.004758 | 23,113 | 110 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.157014 | 23,313 | 3,660 |
Panel de 80W para sistema de energía solar | 0.019032 | 920,900 | 17,527 |
Inversor de voltaje 300W | 0.004758 | 297,050 | 1,413 |
Caja de control sistema de energía solar | 0.004758 | 1,018,750 | 4,847 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.019032 | 731,600 | 13,924 |
Tablero trifásico con puerta de 24 circuitos | 0.004758 | 321,000 | 1,527 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.019032 | 395,000 | 7,518 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.028548 | 492,210 | 14,052 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.038064 | 818,067 | 31,139 |
Acero G-60 x 1 Kg | 2.8548 | 5,200 | 14,845 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.066612 | 533,055 | 35,508 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.009516 | 854,441 | 8,131 |
Muro panel doble cara x 1 m2 | 1.156194 | 232,618 | 268,951 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 0.9516 | 90,690 | 86,301 |
Teja termoacustica x 1 m2, suministro e instalación | 1.084824 | 198,448 | 215,281 |
Guardaescoba en ceramica porcelanato x 1m | 0.409188 | 23,946 | 9,798 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 0.52338 | 178,966 | 93,667 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 0.0171288 | 1,574,907 | 26,976 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 0.07137 | 220,857 | 15,763 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1.61772 | 12,828 | 20,752 |
Geomembrana Instalación x 1 m2 | 0.57096 | 13,477 | 7,695 |
Cepillera Attica | 0.014274 | 28,850 | 412 |
Espejo de 2mm de espesor *1 m2 | 0.014274 | 93,700 | 1,337 |
Argolla toalla attica | 0.014274 | 36,250 | 517 |
División de baño corrediza | 0.014274 | 550,000 | 7,851 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 0.004758 | 505,085 | 2,403 |
Puerta de triplex | 0.038064 | 342,450 | 13,035 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.04758 | 140,813 | 6,700 |
Aseo general para entrega de obra x metro cuadrado | 0.994422 | 3,042 | 3,025 |
Administración | 79458.6 | 1 | 79,459 |
Imprevistos | 77079.6 | 1 | 77,080 |
Utilidad | 38539.8 | 1 | 38,540 |
Unidad Monetaria | 7393.4562 | 1 | 7,393 |
Valor Adicional: | 1,290,536 |