| USD$6.54 |
| USD$21.14 |
| USD$49.70 |
| USD$7.89 |
| USD$1.16 |
| USD$44.33 |
| USD$24,643.79 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 51.58 | 533,055 | 27,494,990 |
Arena lavada de río 1 m3 | 30.32904 | 95,019 | 2,881,835 |
Cemento 1 Kg | 18955.65 | 798 | 15,126,609 |
Triturado de 3/4" x 1 m3 | 45.49356 | 150,500 | 6,846,781 |
Agua para la obra 1 litro | 10290.21 | 36 | 374,564 |
Mezcladora 1 bulto, alquiler x hora | 24.7584 | 7,150 | 177,023 |
Cuadrilla 7 (8 obreros) x jornal | 3.6106 | 578,347 | 2,088,180 |
Acero G-60 x 1 Kg | 2170 | 5,200 | 11,284,000 |
Cuadrilla de albañileria x 1 Hora | 800 | 24,504 | 19,603,511 |
Oficial de construcción x hora | 800 | 15,397 | 12,317,250 |
Ayudante de construcción x 1 hora | 800 | 9,108 | 7,286,261 |
Valor Adicional: | 58,382,502 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 5 | 533,055 | 2,665,276 |
Arena lavada de río 1 m3 | 2.94 | 95,019 | 279,356 |
Cemento 1 Kg | 1837.5 | 798 | 1,466,325 |
Triturado de 3/4" x 1 m3 | 4.41 | 150,500 | 663,705 |
Agua para la obra 1 litro | 997.5 | 36 | 36,309 |
Mezcladora 1 bulto, alquiler x hora | 2.4 | 7,150 | 17,160 |
Cuadrilla 7 (8 obreros) x jornal | 0.35 | 578,347 | 202,421 |
Acero G-60 x 1 Kg | 1300 | 5,200 | 6,760,000 |
Valor Adicional: | 9,425,276 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| USD$22.19 |
| USD$6.35 |
| USD$15.22 |
| USD$36.39 |
| USD$6.32 |
| USD$9.15 |
| USD$20.18 |
| USD$14.00 |
| USD$12.76 |
| USD$6.77 |
| USD$28.00 |
| USD$10.31 |
| USD$23.40 |
| USD$34.94 |
| USD$8.93 |
| USD$11.55 |
| USD$59.98 |
| USD$60.49 |
| USD$6.44 |
| USD$8.40 |
| USD$8.80 |
| USD$6.95 |
| USD$92.82 |
| USD$34.62 |
| USD$6.57 |
| USD$11.67 |
| USD$23.45 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 0.02 | 135,750 | 2,715 |
| 0.34 | 0 | 0 |
Vinilo , Viniltex 5 galones | 0.01 | 364,000 | 3,640 |
Angulo 6m x 25 mm x 2.5mm | 0.42 | 22,700 | 9,534 |
Vigueta 1-1/2" x 3/4" x 0.38 mm x 2.44 m | 0.65 | 4,550 | 2,958 |
Valor Adicional: | 18,847 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.3675 | 5,200 | 1,911 |
Salario mínimo mensual vigente, base | 0.00147 | 1,300,000 | 1,911 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 2,067 |
| USD$6.38 |
| USD$18.86 |
| USD$22.66 |
| USD$8.30 |
| USD$9.03 |
| USD$124.95 |
| USD$104.93 |
| USD$31.42 |
| USD$14.51 |
| USD$7.96 |
| USD$38.65 |
| USD$13.49 |
| USD$230.78 |
| USD$8.10 |
| USD$21.55 |
| USD$59.85 |
| USD$8.21 |
| USD$20.35 |
| USD$56.20 |
| USD$50.92 |
| USD$49.80 |
| USD$16.65 |
| USD$31.65 |
| USD$8.73 |
| USD$64.03 |
| USD$12.57 |
| USD$8.15 |
| USD$18.82 |
| USD$19.69 |
| USD$10.77 |
| USD$75.22 |
| USD$43.86 |
| USD$3.27 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.2 | 5,200 | 1,040 |
Salario mínimo mensual vigente, base | 0.0008 | 1,300,000 | 1,040 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 1,196 |
| USD$33.43 |
| USD$8.80 |
| USD$9.24 |
| USD$7.36 |
| USD$160.50 |
| USD$50.86 |
| USD$212.59 |
| USD$17,403.02 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto premezclado de 4000 PSI o 27.6 MPa x 1 m3 | 100 | 682,471 | 68,247,140 |
Arena lavada de río 1 m3 | 60 | 95,019 | 5,701,140 |
Cemento 1 Kg | 42000 | 798 | 33,516,000 |
Triturado de 3/4" x 1 m3 | 60 | 150,500 | 9,030,000 |
Planta de concreto precio por hora | 20 | 1,000,000 | 20,000,000 |
Valor Adicional: | 68,247,140 |
| USD$9.04 |
| USD$7.14 |
| USD$11.05 |
| USD$7.25 |
| USD$7.05 |
| USD$9.05 |
| USD$28.28 |
| USD$95.56 |
| USD$6.74 |
| USD$86.25 |
| USD$7.14 |
| USD$9.05 |
| USD$0.00 |
| USD$7.80 |
| USD$106.59 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.