| $0 |
| $98,250 |
| $112,600 |
| $71,500 |
| $61,700 |
| $48,050 |
| $980,500 |
| $33,000 |
| $104,000 |
| $130,000 |
| $67,050 |
| $88,600 |
| $38,350 |
| $520,000 |
| $98,250 |
| $106,550 |
| $12,350,000 |
| $174,000 |
| $6,500 |
| $104,000 |
| $63,200 |
| $82,000 |
| $180,000 |
| $55,150 |
| $234,000 |
| $150,900 |
| $3,560,000 |
| $338,000 |
| $63,150 |
| $46,456,600 |
| $5,350 |
| $249,000 |
| $10,400,000 |
| $54,900 |
| $105,300 |
| $48,950 |
| $42,600 |
| $90,900 |
| $232,618 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sistema, Panel x 1 m2 x 0.04 m | 1.05 | 56,500 | 59,325 |
Malla plana RG2 | 0.4 | 5,350 | 2,140 |
Malla RGU 80 | 0.5 | 6,500 | 3,250 |
Malla angular RG1 | 0.5 | 6,700 | 3,350 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.055 | 473,449 | 26,040 |
Arena lavada de río 1 m3 | 0.0704 | 95,019 | 6,689 |
Cemento 1 Kg | 21.01 | 798 | 16,766 |
Agua para la obra 1 litro | 13.2 | 36 | 480 |
Ayudante de construcción x 1 hora | 0.011 | 9,108 | 100 |
Ayudante de construcción x 1 hora | 0.22 | 9,108 | 2,004 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.258 | 31,013 | 8,001 |
Acero G-60 x 1 Kg | 1.538712 | 5,200 | 8,001 |
Valor Adicional: | 102,106 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 5 | 5,200 | 26,000 |
Salario mínimo mensual vigente, base | 0.02 | 1,300,000 | 26,000 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 26,156 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.1 | 232,618 | 23,262 |
Sistema, Panel x 1 m2 x 0.04 m | 0.105 | 56,500 | 5,933 |
Malla plana RG2 | 0.04 | 5,350 | 214 |
Malla RGU 80 | 0.05 | 6,500 | 325 |
Malla angular RG1 | 0.05 | 6,700 | 335 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.0055 | 473,449 | 2,604 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0258 | 31,013 | 800 |
Cuadrilla de instalaciones x 1 Hora | 0.01508 | 26,955 | 406 |
Cuadrilla de instalaciones x 1 Hora | 0.1508 | 26,955 | 4,065 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.5 | 5,200 | 2,600 |
Transporte 1 tonelada x 1 kilómetro | 0.004 | 3,900 | 16 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Valor Adicional: | 23,262 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.1 | 232,618 | 23,262 |
Sistema, Panel x 1 m2 x 0.04 m | 0.105 | 56,500 | 5,933 |
Malla plana RG2 | 0.04 | 5,350 | 214 |
Malla RGU 80 | 0.05 | 6,500 | 325 |
Malla angular RG1 | 0.05 | 6,700 | 335 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.0055 | 473,449 | 2,604 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0258 | 31,013 | 800 |
Cuadrilla de instalaciones x 1 Hora | 0.01508 | 26,955 | 406 |
Cuadrilla de instalaciones x 1 Hora | 0.1508 | 26,955 | 4,065 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.5 | 5,200 | 2,600 |
Transporte 1 tonelada x 1 kilómetro | 0.004 | 3,900 | 16 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Valor Adicional: | 23,262 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.05 | 232,618 | 11,631 |
Sistema, Panel x 1 m2 x 0.04 m | 0.0525 | 56,500 | 2,966 |
Malla plana RG2 | 0.02 | 5,350 | 107 |
Malla RGU 80 | 0.025 | 6,500 | 163 |
Malla angular RG1 | 0.025 | 6,700 | 168 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.00275 | 473,449 | 1,302 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0129 | 31,013 | 400 |
Cuadrilla de instalaciones x 1 Hora | 0.00754 | 26,955 | 203 |
Cuadrilla de instalaciones x 1 Hora | 0.0754 | 26,955 | 2,032 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.25 | 5,200 | 1,300 |
Transporte 1 tonelada x 1 kilómetro | 0.002 | 3,900 | 8 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.0025 | 232,618 | 582 |
Muro panel doble cara x 1 m2 | 0.00032 | 232,618 | 74 |
Valor Adicional: | 11,631 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.0064 | 232,618 | 1,489 |
Sistema, Panel x 1 m2 x 0.04 m | 0.00672 | 56,500 | 380 |
Malla plana RG2 | 0.00256 | 5,350 | 14 |
Malla RGU 80 | 0.0032 | 6,500 | 21 |
Malla angular RG1 | 0.0032 | 6,700 | 21 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.000352 | 473,449 | 167 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0016512 | 31,013 | 51 |
Cuadrilla de instalaciones x 1 Hora | 0.00096512 | 26,955 | 26 |
Cuadrilla de instalaciones x 1 Hora | 0.0096512 | 26,955 | 260 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.032 | 5,200 | 166 |
Transporte 1 tonelada x 1 kilómetro | 0.000256 | 3,900 | 1 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Muro panel doble cara x 1 m2 | 0.00032 | 232,618 | 74 |
Muro panel doble cara x 1 m2 | 4.096E-5 | 232,618 | 10 |
Valor Adicional: | 1,489 |
| $53,400 |
| $520,000 |
| $17,200,000 |
| $55,750 |
| $49,900 |
| $34,500 |
| $0 |
| $533,055 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| $497,000 |
| $447,000 |
| $26,550 |
| $833,700 |
| $4,020,750,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño de pavimento por unidad homogénea de diseño, según cbr y tránsito | 6 | 3,900,000 | 23,400,000 |
Salario mínimo mensual vigente, base | 18 | 1,300,000 | 23,400,000 |
Valor Adicional: | 23,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Subbase triturada de 2" x 1 m3 | 4200 | 125,200 | 525,840,000 |
Base granular de 1 1/2" x m3 | 4200 | 126,550 | 531,510,000 |
Asfalto 60/70 por tonelada | 1400 | 2,100,000 | 2,940,000,000 |
Valor Adicional: | 3,997,350,000 |
| $2,625,000 |
| $5,162,144 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa nueva de 1 planta y 209 m2 presupuesto de construcción | 0.019032 | 271,234,996 | 5,162,144 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 3.977688 | 3,900 | 15,513 |
Levantamiento topográfico hasta 1,000 m2 | 0.019032 | 2,600,000 | 49,483 |
Replanteo Arquitectónico X 1 m2 | 3.977688 | 10,038 | 39,927 |
Diseño arquitectónico de casa personalizada x 1 m2 | 3.977688 | 28,597 | 113,751 |
Estudio de suelos y geotecnia desde | 0.019032 | 4,147,000 | 78,926 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.019032 | 11,001 | 209 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 3.977688 | 13,520 | 53,778 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 3.977688 | 16,000 | 63,643 |
Excavación manual en conglomerado x 1 m3 | 0.19032 | 58,492 | 11,132 |
Kit Mueble para baño + lavamanos | 0.057096 | 484,450 | 27,660 |
Punto agua fria PVC 1/2" | 0.342576 | 44,047 | 15,089 |
Tubo 1" x 6 m RDE 13.5 | 0.28548 | 63,000 | 17,985 |
Sanitario suministro e instalación | 0.057096 | 1,077,612 | 61,527 |
Punto desagüe sanitario pvc 4" | 0.28548 | 68,312 | 19,502 |
Caja de inspección y distribución | 0.076128 | 207,000 | 15,758 |
Tubería PVC sanitaria 4" | 0.19032 | 156,100 | 29,709 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.019032 | 23,113 | 440 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.628056 | 23,313 | 14,642 |
Panel de 80W para sistema de energía solar | 0.076128 | 920,900 | 70,106 |
Inversor de voltaje 300W | 0.019032 | 297,050 | 5,653 |
Caja de control sistema de energía solar | 0.019032 | 1,018,750 | 19,389 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.076128 | 731,600 | 55,695 |
Tablero trifásico con puerta de 24 circuitos | 0.019032 | 321,000 | 6,109 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.076128 | 395,000 | 30,071 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.114192 | 492,210 | 56,206 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.152256 | 818,067 | 124,556 |
Acero G-60 x 1 Kg | 11.4192 | 5,200 | 59,380 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.266448 | 533,055 | 142,032 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.038064 | 854,441 | 32,523 |
Muro panel doble cara x 1 m2 | 4.624776 | 232,618 | 1,075,806 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 3.8064 | 90,690 | 345,202 |
Teja termoacustica x 1 m2, suministro e instalación | 4.339296 | 198,448 | 861,126 |
Guardaescoba en ceramica porcelanato x 1m | 1.636752 | 23,946 | 39,194 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 2.09352 | 178,966 | 374,669 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 0.0685152 | 1,574,907 | 107,905 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 0.28548 | 220,857 | 63,050 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 6.47088 | 12,828 | 83,010 |
Geomembrana Instalación x 1 m2 | 2.28384 | 13,477 | 30,780 |
Cepillera Attica | 0.057096 | 28,850 | 1,647 |
Espejo de 2mm de espesor *1 m2 | 0.057096 | 93,700 | 5,350 |
Argolla toalla attica | 0.057096 | 36,250 | 2,070 |
División de baño corrediza | 0.057096 | 550,000 | 31,403 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 0.019032 | 505,085 | 9,613 |
Puerta de triplex | 0.152256 | 342,450 | 52,140 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.19032 | 140,813 | 26,800 |
Aseo general para entrega de obra x metro cuadrado | 3.977688 | 3,042 | 12,099 |
Administración | 317834.4 | 1 | 317,834 |
Imprevistos | 308318.4 | 1 | 308,318 |
Utilidad | 154159.2 | 1 | 154,159 |
Unidad Monetaria | 29573.8248 | 1 | 29,574 |
Valor Adicional: | 5,162,144 |
| $59,700 |
| $2,912,568 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa en obra gris de 1 planta y 209 m2 presupuesto de construcción | 0.0144 | 202,261,719 | 2,912,569 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 3.0096 | 3,900 | 11,737 |
Levantamiento topográfico hasta 1,000 m2 | 0.0144 | 2,600,000 | 37,440 |
Replanteo Arquitectónico X 1 m2 | 3.0096 | 10,038 | 30,209 |
Diseño arquitectónico de casa personalizada x 1 m2 | 3.0096 | 28,597 | 86,066 |
Estudio de suelos y geotecnia desde | 0.0144 | 4,147,000 | 59,717 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.0144 | 11,001 | 158 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 3.0096 | 13,520 | 40,690 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 3.0096 | 16,000 | 48,154 |
Excavación manual en conglomerado x 1 m3 | 0.144 | 58,492 | 8,423 |
Kit Mueble para baño + lavamanos | 0.0432 | 484,450 | 20,928 |
Punto agua fria PVC 1/2" | 0.2592 | 44,047 | 11,417 |
Tubo 1" x 6 m RDE 13.5 | 0.216 | 63,000 | 13,608 |
Sanitario suministro e instalación | 0.0432 | 1,077,612 | 46,553 |
Punto desagüe sanitario pvc 4" | 0.216 | 68,312 | 14,755 |
Caja de inspección y distribución | 0.0576 | 207,000 | 11,923 |
Tubería PVC sanitaria 4" | 0.144 | 156,100 | 22,478 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.0864 | 492,210 | 42,527 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.1152 | 818,067 | 94,241 |
Acero G-60 x 1 Kg | 8.64 | 5,200 | 44,928 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.2016 | 533,055 | 107,464 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.0288 | 854,441 | 24,608 |
Muro panel doble cara x 1 m2 | 3.4992 | 232,618 | 813,977 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 2.88 | 90,690 | 261,187 |
Teja termoacustica x 1 m2, suministro e instalación | 3.2832 | 198,448 | 651,545 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.144 | 140,813 | 20,277 |
Aseo general para entrega de obra x metro cuadrado | 3.0096 | 3,042 | 9,154 |
Administración | 182880 | 1 | 182,880 |
Imprevistos | 89280 | 1 | 89,280 |
Utilidad | 89280 | 1 | 89,280 |
Unidad Monetaria | 16963.2 | 1 | 16,963 |
Valor Adicional: | 2,912,569 |
| $123,500,000 |
| $479,396,020 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 400 | 3,900 | 1,560,000 |
Salario mínimo mensual vigente, base | 1.2 | 1,300,000 | 1,560,000 |
| 0 | 0 | 0 |
4655" target="_blank"> | 4 | 0 | 0 |
Replanteo Arquitectónico X 1 m2 | 400 | 10,038 | 4,015,058 |
Cuerda de Nylon 100 m x 0,50 mm | 20 | 50,900 | 1,018,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 200 | 6,100 | 1,220,000 |
| 4 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 6.56 | 24,504 | 160,749 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 65.96 | 24,504 | 1,616,309 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 400 | 28,597 | 11,438,856 |
Salario diario vigente | 264 | 43,329 | 11,438,856 |
Estudio de suelos y geotecnia desde | 4 | 4,147,000 | 16,588,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 12 | 650,000 | 7,800,000 |
Ensayo SPT | 4 | 247,000 | 988,000 |
Informe Geotécnico y recomendaciones de construcción | 4 | 1,950,000 | 7,800,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 4 | 11,001 | 44,005 |
Salario diario vigente | 1.0156 | 43,329 | 44,005 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 400 | 13,520 | 5,408,000 |
Diseño hidráulico de edificio x 1 m2 | 400 | 6,760 | 2,704,000 |
Diseño sanitario de edificio x 1 m2, servicio | 400 | 6,760 | 2,704,000 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 400 | 16,000 | 6,400,000 |
Valor Adicional: | 45,453,919 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Punto desagüe sanitario pvc 4" | 60 | 68,312 | 4,098,724 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 10.2 | 78,000 | 795,600 |
Cuadrilla de albañileria x 1 Hora | 120 | 24,504 | 2,940,527 |
Limpiador para PVC 1/4 de galón | 2.256 | 99,000 | 223,344 |
Soldadura para PVC DE 1/4 de Galón | 1.878 | 74,150 | 139,254 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 4,098,724 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Panel de 80W para sistema de energía solar | 16 | 920,900 | 14,734,400 |
Inversor de voltaje 300W | 4 | 297,050 | 1,188,200 |
Caja de control sistema de energía solar | 4 | 1,018,750 | 4,075,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 16 | 731,600 | 11,705,600 |
Valor Adicional: | 31,703,200 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 2400 | 5,200 | 12,480,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 56 | 533,055 | 29,851,095 |
Arena lavada de río 1 m3 | 32.928 | 95,019 | 3,128,786 |
Cemento 1 Kg | 20580 | 798 | 16,422,840 |
Triturado de 3/4" x 1 m3 | 49.392 | 150,500 | 7,433,496 |
Agua para la obra 1 litro | 11172 | 36 | 406,661 |
Mezcladora 1 bulto, alquiler x hora | 26.88 | 7,150 | 192,192 |
Cuadrilla 7 (8 obreros) x jornal | 3.92 | 578,347 | 2,267,120 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 8 | 854,441 | 6,835,526 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 8 | 533,055 | 4,264,442 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.08 | 155,000 | 12,400 |
Durmiente ordinario 0,04x0.04x3,00 m. | 8 | 30,000 | 240,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 8 | 32,500 | 260,000 |
Vara clavo 3m | 1.36 | 20,100 | 27,336 |
Cuadrilla de albañileria x 1 Hora | 72 | 24,504 | 1,764,316 |
Cuadrilla de albañileria x 1 Hora | 7.2 | 24,504 | 176,432 |
Vibrador eléctrico de aguja para concreto x hora | 12 | 7,550 | 90,600 |
Valor Adicional: | 49,166,620 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 680 | 153,842 | 104,612,287 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 506.396 | 83,900 | 42,486,624 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 3.4 | 135,750 | 461,550 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 183.6 | 32,100 | 5,893,560 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 557.6 | 25,500 | 14,218,800 |
Cuadrilla de carpintería por hora | 56.644 | 38,130 | 2,159,809 |
Cuadrilla de carpintería por hora | 566.644 | 38,130 | 21,605,864 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 3400 | 5,200 | 17,680,000 |
Transporte 1 tonelada x 1 kilómetro | 27.2 | 3,900 | 106,080 |
Valor Adicional: | 104,612,287 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Teja termoacustica x 1 m2, suministro e instalación | 440 | 198,448 | 87,317,246 |
Teja termoacústica 3 m x 0.78 m | 188.056 | 393,120 | 73,928,575 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 91.652 | 93,400 | 8,560,297 |
Andamio Tubular estandar con tijeras alquiler por día | 22 | 47,300 | 1,040,600 |
Cuadrilla de instalaciones x 1 Hora | 11 | 26,955 | 296,503 |
Cuadrilla de instalaciones x 1 Hora | 110 | 26,955 | 2,965,031 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 88 | 5,200 | 457,600 |
Transporte 1 tonelada x 1 kilómetro | 17.6 | 3,900 | 68,640 |
Valor Adicional: | 87,317,246 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 0 | 99,900,000 | 0 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1360 | 12,828 | 17,446,352 |
Intervinil 5 galones, vinilo tipo 2 | 13.6 | 230,000 | 3,128,000 |
Cuadrilla de pintura x 1 hora | 29.92 | 38,563 | 1,153,799 |
Cuadrilla de pintura x 1 hora | 299.2 | 38,563 | 11,537,993 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 272 | 5,200 | 1,414,400 |
Transporte 1 tonelada x 1 kilómetro | 54.4 | 3,900 | 212,160 |
Geomembrana Instalación x 1 m2 | 480 | 13,477 | 6,469,159 |
Cuadrilla de albañileria x 1 Hora | 24 | 24,504 | 588,105 |
Cuadrilla de albañileria x 1 Hora | 240 | 24,504 | 5,881,053 |
Cepillera Attica | 12 | 28,850 | 346,200 |
Espejo de 2mm de espesor *1 m2 | 12 | 93,700 | 1,124,400 |
Argolla toalla attica | 12 | 36,250 | 435,000 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 120 | 141,747 | 17,009,598 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 120 | 130,000 | 15,600,000 |
Silicona transparente con fungicida 11 Onzas | 10.92 | 39,050 | 426,426 |
Cuadrilla de albañileria x 1 Hora | 30 | 24,504 | 735,132 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 44.1 | 5,200 | 229,320 |
Transporte 1 tonelada x 1 kilómetro | 4.8 | 3,900 | 18,720 |
Valor Adicional: | 42,830,708 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 40 | 140,813 | 5,632,537 |
Cascarilla de arroz x bulto 45 Kg | 10 | 155,000 | 1,550,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 3 | 91,000 | 273,000 |
Plántula aguacate | 40 | 33,250 | 1,330,000 |
Tierra negra abonada x 1 m3 | 8 | 235,000 | 1,880,000 |
Pala redonda No. 4 mango plástico | 0.2 | 63,000 | 12,600 |
Cuadrilla de instalaciones x 1 Hora | 20 | 26,955 | 539,097 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 8 | 5,200 | 41,600 |
Transporte 1 tonelada x 1 kilómetro | 1.6 | 3,900 | 6,240 |
Valor Adicional: | 5,632,537 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 40000000 | 1 | 40,000,000 |
Valor Adicional: | 40,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 40000000 | 1 | 40,000,000 |
Valor Adicional: | 40,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 23200000 | 1 | 23,200,000 |
Valor Adicional: | 23,200,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 3800000 | 1 | 3,800,000 |
Valor Adicional: | 3,800,000 |
| $7,194,000 |
| $1,011,308,595 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 1045 | 3,900 | 4,075,500 |
Salario mínimo mensual vigente, base | 3.135 | 1,300,000 | 4,075,500 |
Levantamiento topográfico hasta 1,000 m2 | 5 | 2,600,000 | 13,000,000 |
Salario mínimo mensual vigente, base | 10 | 1,300,000 | 13,000,000 |
Replanteo Arquitectónico X 1 m2 | 1045 | 10,038 | 10,489,340 |
Cuerda de Nylon 100 m x 0,50 mm | 52.25 | 50,900 | 2,659,525 |
Estaca de Madera Ø=0.05 L=0.60 m | 522.5 | 6,100 | 3,187,250 |
| 10.45 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 17.138 | 24,504 | 419,956 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 172.3205 | 24,504 | 4,222,609 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 1045 | 28,597 | 29,884,011 |
Salario diario vigente | 689.7 | 43,329 | 29,884,011 |
Estudio de suelos y geotecnia desde | 5 | 4,147,000 | 20,735,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 15 | 650,000 | 9,750,000 |
Ensayo SPT | 5 | 247,000 | 1,235,000 |
Informe Geotécnico y recomendaciones de construcción | 5 | 1,950,000 | 9,750,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 5 | 11,001 | 55,006 |
Salario diario vigente | 1.2695 | 43,329 | 55,006 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1045 | 13,520 | 14,128,400 |
Diseño hidráulico de edificio x 1 m2 | 1045 | 6,760 | 7,064,200 |
Diseño sanitario de edificio x 1 m2, servicio | 1045 | 6,760 | 7,064,200 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1045 | 16,000 | 16,720,000 |
Valor Adicional: | 109,087,257 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 50 | 58,492 | 2,924,599 |
Cuadrilla de albañileria x 1 Hora | 10.85 | 24,504 | 265,873 |
Cuadrilla de albañileria x 1 Hora | 108.5 | 24,504 | 2,658,726 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 2,924,599 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 15 | 484,450 | 7,266,750 |
Punto agua fria PVC 1/2" | 90 | 44,047 | 3,964,185 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 18 | 20,300 | 365,400 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 4.5 | 30,700 | 138,150 |
Codo PVC 90° presión de 1/2" x 10 unidades | 9 | 45,000 | 405,000 |
Soldadura para PVC 1/4 de galón | 3.6 | 53,500 | 192,600 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 1.35 | 77,000 | 103,950 |
Instalación carpintería metálica x 1 m2 | 119.97 | 20,907 | 2,508,259 |
Instalación carpintería metálica x 1 m2 | 11.997 | 20,907 | 250,826 |
Tubo 1" x 6 m RDE 13.5 | 75 | 63,000 | 4,725,000 |
Valor Adicional: | 15,955,935 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 15 | 1,077,612 | 16,164,178 |
Sanitario One Piece Galio Blanco | 15 | 974,000 | 14,610,000 |
Instalación de aparatos sanitarios x unidad | 15 | 103,612 | 1,554,178 |
Punto desagüe sanitario pvc 4" | 75 | 68,312 | 5,123,405 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 12.75 | 78,000 | 994,500 |
Cuadrilla de albañileria x 1 Hora | 150 | 24,504 | 3,675,658 |
Limpiador para PVC 1/4 de galón | 2.82 | 99,000 | 279,180 |
Soldadura para PVC DE 1/4 de Galón | 2.3475 | 74,150 | 174,067 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 20 | 207,000 | 4,140,000 |
Tubería PVC sanitaria 4" | 50 | 156,100 | 7,805,000 |
Valor Adicional: | 33,232,583 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 30 | 492,210 | 14,766,300 |
Agua para la obra 1 litro | 5370 | 36 | 195,468 |
Arena lavada de río 1 m3 | 22.68 | 95,019 | 2,155,031 |
Cemento 1 Kg | 9450 | 798 | 7,541,100 |
Triturado de 3/4" x 1 m3 | 22.68 | 150,500 | 3,413,340 |
Mezcladora 1 bulto, alquiler x hora | 30 | 7,150 | 214,500 |
Cuadrilla 7 (8 obreros) x jornal | 2.1 | 578,347 | 1,214,529 |
Oficial de construcción x hora | 2.1 | 15,397 | 32,333 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 40 | 818,067 | 32,722,684 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 40 | 533,055 | 21,322,210 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 118.4 | 13,000 | 1,539,200 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 6 | 155,000 | 930,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 14.4 | 10,000 | 144,000 |
| 52.4 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 326 | 24,504 | 7,988,431 |
Cuadrilla de albañileria x 1 Hora | 32.6 | 24,504 | 798,843 |
Acero G-60 x 1 Kg | 3000 | 5,200 | 15,600,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 70 | 533,055 | 37,313,868 |
Arena lavada de río 1 m3 | 41.16 | 95,019 | 3,910,982 |
Cemento 1 Kg | 25725 | 798 | 20,528,550 |
Triturado de 3/4" x 1 m3 | 61.74 | 150,500 | 9,291,870 |
Agua para la obra 1 litro | 13965 | 36 | 508,326 |
Mezcladora 1 bulto, alquiler x hora | 33.6 | 7,150 | 240,240 |
Cuadrilla 7 (8 obreros) x jornal | 4.9 | 578,347 | 2,833,900 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 10 | 854,441 | 8,544,407 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 10 | 533,055 | 5,330,553 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.1 | 155,000 | 15,500 |
Durmiente ordinario 0,04x0.04x3,00 m. | 10 | 30,000 | 300,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 10 | 32,500 | 325,000 |
Vara clavo 3m | 1.7 | 20,100 | 34,170 |
Cuadrilla de albañileria x 1 Hora | 90 | 24,504 | 2,205,395 |
Cuadrilla de albañileria x 1 Hora | 9 | 24,504 | 220,540 |
Vibrador eléctrico de aguja para concreto x hora | 15 | 7,550 | 113,250 |
Valor Adicional: | 108,947,260 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 1215 | 232,618 | 282,630,758 |
Sistema, Panel x 1 m2 x 0.04 m | 1275.75 | 56,500 | 72,079,875 |
Malla plana RG2 | 486 | 5,350 | 2,600,100 |
Malla RGU 80 | 607.5 | 6,500 | 3,948,750 |
Malla angular RG1 | 607.5 | 6,700 | 4,070,250 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 66.825 | 473,449 | 31,638,242 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 313.47 | 31,013 | 9,721,582 |
Cuadrilla de instalaciones x 1 Hora | 183.222 | 26,955 | 4,938,717 |
Cuadrilla de instalaciones x 1 Hora | 1832.22 | 26,955 | 49,387,175 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 6075 | 5,200 | 31,590,000 |
Transporte 1 tonelada x 1 kilómetro | 48.6 | 3,900 | 189,540 |
Muro panel doble cara x 1 m2 | 121.5 | 232,618 | 28,263,076 |
Muro panel doble cara x 1 m2 | 121.5 | 232,618 | 28,263,076 |
Muro panel doble cara x 1 m2 | 60.75 | 232,618 | 14,131,538 |
Muro panel doble cara x 1 m2 | 7.776 | 232,618 | 1,808,837 |
Valor Adicional: | 282,630,758 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 1000 | 90,690 | 90,689,915 |
Acero G-60 x 1 Kg | 9900 | 5,200 | 51,480,000 |
Pintuco Anticorrosivo rojo | 180 | 95,000 | 17,100,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 120 | 34,650 | 4,158,000 |
Cuadrilla de albañileria x 1 Hora | 666 | 24,504 | 16,319,923 |
Cuadrilla de albañileria x 1 Hora | 66.6 | 24,504 | 1,631,992 |
Teja termoacustica x 1 m2, suministro e instalación | 1140 | 198,448 | 226,231,046 |
Teja termoacústica 3 m x 0.78 m | 487.236 | 393,120 | 191,542,216 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 237.462 | 93,400 | 22,178,951 |
Andamio Tubular estandar con tijeras alquiler por día | 57 | 47,300 | 2,696,100 |
Cuadrilla de instalaciones x 1 Hora | 28.5 | 26,955 | 768,213 |
Cuadrilla de instalaciones x 1 Hora | 285 | 26,955 | 7,682,126 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 228 | 5,200 | 1,185,600 |
Transporte 1 tonelada x 1 kilómetro | 45.6 | 3,900 | 177,840 |
Valor Adicional: | 316,920,961 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 50 | 140,813 | 7,040,671 |
Cascarilla de arroz x bulto 45 Kg | 12.5 | 155,000 | 1,937,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 3.75 | 91,000 | 341,250 |
Plántula aguacate | 50 | 33,250 | 1,662,500 |
Tierra negra abonada x 1 m3 | 10 | 235,000 | 2,350,000 |
Pala redonda No. 4 mango plástico | 0.25 | 63,000 | 15,750 |
Cuadrilla de instalaciones x 1 Hora | 25 | 26,955 | 673,871 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 10 | 5,200 | 52,000 |
Transporte 1 tonelada x 1 kilómetro | 2 | 3,900 | 7,800 |
Valor Adicional: | 7,040,671 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 63500000 | 1 | 63,500,000 |
Valor Adicional: | 63,500,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 31000000 | 1 | 31,000,000 |
Valor Adicional: | 31,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 31000000 | 1 | 31,000,000 |
Valor Adicional: | 31,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 5890000 | 1 | 5,890,000 |
Valor Adicional: | 5,890,000 |
| $256,000 |
| $33,100 |
| $6,100 |
| $208,000 |
| $128,176,341,184 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 25600 | 1,000,000 | 25,600,000,000 |
Valor Adicional: | 25,600,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 20 | 2,600,000 | 52,000,000 |
Salario mínimo mensual vigente, base | 40 | 1,300,000 | 52,000,000 |
Replanteo Arquitectónico X 1 m2 | 97980 | 10,038 | 983,488,526 |
Cuerda de Nylon 100 m x 0,50 mm | 4899 | 50,900 | 249,359,100 |
Estaca de Madera Ø=0.05 L=0.60 m | 48990 | 6,100 | 298,839,000 |
| 979.8 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 1606.872 | 24,504 | 39,375,417 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 16156.902 | 24,504 | 395,915,012 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 97980 | 14,000 | 1,371,720,000 |
Estudio de suelos y geotecnia desde | 40 | 4,147,000 | 165,880,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 120 | 650,000 | 78,000,000 |
Ensayo SPT | 40 | 247,000 | 9,880,000 |
Informe Geotécnico y recomendaciones de construcción | 40 | 1,950,000 | 78,000,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 97980 | 10,400 | 1,018,992,000 |
Salario mínimo mensual vigente, base | 783.84 | 1,300,000 | 1,018,992,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 97980 | 13,520 | 1,324,689,600 |
Diseño hidráulico de edificio x 1 m2 | 97980 | 6,760 | 662,344,800 |
Diseño sanitario de edificio x 1 m2, servicio | 97980 | 6,760 | 662,344,800 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 97980 | 16,000 | 1,567,680,000 |
Valor Adicional: | 6,484,450,126 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 84576 | 4,551 | 384,926,520 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 2114.4 | 182,050 | 384,926,520 |
Piloteadora, alquiler por Hora | 320 | 390,000 | 124,800,000 |
Salario mínimo mensual vigente, base | 96 | 1,300,000 | 124,800,000 |
Valor Adicional: | 509,726,520 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 4925212 | 5,200 | 25,611,102,400 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 25564 | 533,055 | 13,627,024,697 |
Arena lavada de río 1 m3 | 15031.632 | 95,019 | 1,428,290,641 |
Cemento 1 Kg | 9394770 | 798 | 7,497,026,460 |
Triturado de 3/4" x 1 m3 | 22547.448 | 150,500 | 3,393,390,992 |
Agua para la obra 1 litro | 5100018 | 36 | 185,640,655 |
Mezcladora 1 bulto, alquiler x hora | 12270.72 | 7,150 | 87,735,648 |
Cuadrilla 7 (8 obreros) x jornal | 1789.48 | 578,347 | 1,034,940,302 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4000 | 854,441 | 3,417,762,849 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 4000 | 533,055 | 2,132,221,045 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 40 | 155,000 | 6,200,000 |
Durmiente ordinario 0,04x0.04x3,00 m. | 4000 | 30,000 | 120,000,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 4000 | 32,500 | 130,000,000 |
Vara clavo 3m | 680 | 20,100 | 13,668,000 |
Cuadrilla de albañileria x 1 Hora | 36000 | 24,504 | 882,158,004 |
Cuadrilla de albañileria x 1 Hora | 3600 | 24,504 | 88,215,800 |
Vibrador eléctrico de aguja para concreto x hora | 6000 | 7,550 | 45,300,000 |
Valor Adicional: | 42,655,889,947 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 1440 | 484,450 | 697,608,000 |
Punto agua fria PVC 1/2" | 8640 | 44,047 | 380,561,794 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 1728 | 20,300 | 35,078,400 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 432 | 30,700 | 13,262,400 |
Codo PVC 90° presión de 1/2" x 10 unidades | 864 | 45,000 | 38,880,000 |
Soldadura para PVC 1/4 de galón | 345.6 | 53,500 | 18,489,600 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 129.6 | 77,000 | 9,979,200 |
Instalación carpintería metálica x 1 m2 | 11517.12 | 20,907 | 240,792,903 |
Instalación carpintería metálica x 1 m2 | 1151.712 | 20,907 | 24,079,290 |
Tubo 1" x 6 m RDE 13.5 | 7200 | 63,000 | 453,600,000 |
Valor Adicional: | 1,531,769,794 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 1440 | 1,077,612 | 1,551,761,048 |
Sanitario One Piece Galio Blanco | 1440 | 974,000 | 1,402,560,000 |
Instalación de aparatos sanitarios x unidad | 1440 | 103,612 | 149,201,048 |
Punto desagüe sanitario pvc 4" | 7200 | 68,312 | 491,846,926 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 1224 | 78,000 | 95,472,000 |
Cuadrilla de albañileria x 1 Hora | 14400 | 24,504 | 352,863,202 |
Limpiador para PVC 1/4 de galón | 270.72 | 99,000 | 26,801,280 |
Soldadura para PVC DE 1/4 de Galón | 225.36 | 74,150 | 16,710,444 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 1920 | 207,000 | 397,440,000 |
Tubería PVC sanitaria 4" | 4800 | 156,100 | 749,280,000 |
Valor Adicional: | 3,190,327,974 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 480 | 23,113 | 11,094,131 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 96 | 94,000 | 9,024,000 |
Cuadrilla de albañileria x 1 Hora | 76.8 | 24,504 | 1,881,937 |
Cuadrilla de albañileria x 1 Hora | 7.68 | 24,504 | 188,194 |
Interruptor sencillo cuatro vías. Suministro e instalación | 15840 | 23,313 | 369,274,316 |
Interruptor sencillo cuatro vías x 5 unidades | 3168 | 95,000 | 300,960,000 |
Cuadrilla de albañileria x 1 Hora | 2534.4 | 24,504 | 62,103,923 |
Cuadrilla de albañileria x 1 Hora | 253.44 | 24,504 | 6,210,392 |
Panel de 80W para sistema de energía solar | 1920 | 920,900 | 1,768,128,000 |
Inversor de voltaje 300W | 480 | 297,050 | 142,584,000 |
Caja de control sistema de energía solar | 480 | 1,018,750 | 489,000,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 1920 | 731,600 | 1,404,672,000 |
Tablero trifásico con puerta de 24 circuitos | 480 | 321,000 | 154,080,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 1920 | 395,000 | 758,400,000 |
Valor Adicional: | 5,097,232,447 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 62160 | 153,842 | 9,562,793,732 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 46290.552 | 83,900 | 3,883,777,313 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 310.8 | 135,750 | 42,191,100 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 16783.2 | 32,100 | 538,740,720 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 50971.2 | 25,500 | 1,299,765,600 |
Cuadrilla de carpintería por hora | 5177.928 | 38,130 | 197,431,909 |
Cuadrilla de carpintería por hora | 51797.928 | 38,130 | 1,975,030,132 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 310800 | 5,200 | 1,616,160,000 |
Transporte 1 tonelada x 1 kilómetro | 2486.4 | 3,900 | 9,696,960 |
Valor Adicional: | 9,562,793,732 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 24 | 99,900,000 | 2,397,600,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 121000 | 12,828 | 1,552,212,200 |
Intervinil 5 galones, vinilo tipo 2 | 1210 | 230,000 | 278,300,000 |
Cuadrilla de pintura x 1 hora | 2662 | 38,563 | 102,654,200 |
Cuadrilla de pintura x 1 hora | 26620 | 38,563 | 1,026,542,002 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 24200 | 5,200 | 125,840,000 |
Transporte 1 tonelada x 1 kilómetro | 4840 | 3,900 | 18,876,000 |
Geomembrana Instalación x 1 m2 | 81600 | 13,477 | 1,099,756,982 |
Cuadrilla de albañileria x 1 Hora | 4080 | 24,504 | 99,977,907 |
Cuadrilla de albañileria x 1 Hora | 40800 | 24,504 | 999,779,071 |
Cepillera Attica | 1200 | 28,850 | 34,620,000 |
Espejo de 2mm de espesor *1 m2 | 2400 | 93,700 | 224,880,000 |
Argolla toalla attica | 1200 | 36,250 | 43,500,000 |
Valor Adicional: | 5,352,569,182 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 1600 | 140,813 | 225,301,462 |
Cascarilla de arroz x bulto 45 Kg | 400 | 155,000 | 62,000,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 120 | 91,000 | 10,920,000 |
Plántula aguacate | 1600 | 33,250 | 53,200,000 |
Tierra negra abonada x 1 m3 | 320 | 235,000 | 75,200,000 |
Pala redonda No. 4 mango plástico | 8 | 63,000 | 504,000 |
Cuadrilla de instalaciones x 1 Hora | 800 | 26,955 | 21,563,862 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 320 | 5,200 | 1,664,000 |
Transporte 1 tonelada x 1 kilómetro | 64 | 3,900 | 249,600 |
Valor Adicional: | 225,301,462 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 10776000000 | 1 | 10,776,000,000 |
Valor Adicional: | 10,776,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 10776000000 | 1 | 10,776,000,000 |
Valor Adicional: | 10,776,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 5390280000 | 1 | 5,390,280,000 |
Valor Adicional: | 5,390,280,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 1024000000 | 1 | 1,024,000,000 |
Valor Adicional: | 1,024,000,000 |
| $38,200 |
| $95,019 |
| $28,200 |
| $104,000 |
| $77,250 |
| $1,349,000 |
| $21,710,000 |
| $0 |
| $139,700 |
| $589,940 |
| $150,000 |
| $35,400 |
| $654,000 |
| $195,000 |
| $128,550 |
| $418,000 |
| $1,550,000 |
| $25,000 |
| $313,000 |
| $32,150 |
| $1,850,000 |
| $188,000 |
| $217,450 |
| $259,000 |
| $363,200 |
| $38,761,859,160 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 7500 | 1,000,000 | 7,500,000,000 |
Valor Adicional: | 7,500,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 6 | 2,600,000 | 15,600,000 |
Salario mínimo mensual vigente, base | 12 | 1,300,000 | 15,600,000 |
Replanteo Arquitectónico X 1 m2 | 24495 | 10,038 | 245,872,131 |
Cuerda de Nylon 100 m x 0,50 mm | 1224.75 | 50,900 | 62,339,775 |
Estaca de Madera Ø=0.05 L=0.60 m | 12247.5 | 6,100 | 74,709,750 |
| 244.95 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 401.718 | 24,504 | 9,843,854 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 4039.2255 | 24,504 | 98,978,753 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 24495 | 14,000 | 342,930,000 |
Estudio de suelos y geotecnia desde | 12 | 4,147,000 | 49,764,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 36 | 650,000 | 23,400,000 |
Ensayo SPT | 12 | 247,000 | 2,964,000 |
Informe Geotécnico y recomendaciones de construcción | 12 | 1,950,000 | 23,400,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 24495 | 10,400 | 254,748,000 |
Salario mínimo mensual vigente, base | 195.96 | 1,300,000 | 254,748,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 24495 | 13,520 | 331,172,400 |
Diseño hidráulico de edificio x 1 m2 | 24495 | 6,760 | 165,586,200 |
Diseño sanitario de edificio x 1 m2, servicio | 24495 | 6,760 | 165,586,200 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 24495 | 16,000 | 391,920,000 |
Valor Adicional: | 1,632,006,531 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 22032 | 4,551 | 100,273,140 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 550.8 | 182,050 | 100,273,140 |
Piloteadora, alquiler por Hora | 240 | 390,000 | 93,600,000 |
Salario mínimo mensual vigente, base | 72 | 1,300,000 | 93,600,000 |
Valor Adicional: | 193,873,140 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 1231302 | 5,200 | 6,402,770,400 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 6393 | 533,055 | 3,407,822,285 |
Arena lavada de río 1 m3 | 3759.084 | 95,019 | 357,184,403 |
Cemento 1 Kg | 2349427.5 | 798 | 1,874,843,145 |
Triturado de 3/4" x 1 m3 | 5638.626 | 150,500 | 848,613,230 |
Agua para la obra 1 litro | 1275403.5 | 36 | 46,424,687 |
Mezcladora 1 bulto, alquiler x hora | 3068.64 | 7,150 | 21,940,776 |
Cuadrilla 7 (8 obreros) x jornal | 447.51 | 578,347 | 258,816,044 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 999 | 854,441 | 853,586,272 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 999 | 533,055 | 532,522,206 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 9.99 | 155,000 | 1,548,450 |
Durmiente ordinario 0,04x0.04x3,00 m. | 999 | 30,000 | 29,970,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 999 | 32,500 | 32,467,500 |
Vara clavo 3m | 169.83 | 20,100 | 3,413,583 |
Cuadrilla de albañileria x 1 Hora | 8991 | 24,504 | 220,318,961 |
Cuadrilla de albañileria x 1 Hora | 899.1 | 24,504 | 22,031,896 |
Vibrador eléctrico de aguja para concreto x hora | 1498.5 | 7,550 | 11,313,675 |
Steel deck metaldeck grado 40 | 4899 | 451,000 | 2,209,449,000 |
Valor Adicional: | 12,873,627,956 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 360 | 484,450 | 174,402,000 |
Punto agua fria PVC 1/2" | 2160 | 44,047 | 95,140,448 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 432 | 20,300 | 8,769,600 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 108 | 30,700 | 3,315,600 |
Codo PVC 90° presión de 1/2" x 10 unidades | 216 | 45,000 | 9,720,000 |
Soldadura para PVC 1/4 de galón | 86.4 | 53,500 | 4,622,400 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 32.4 | 77,000 | 2,494,800 |
Instalación carpintería metálica x 1 m2 | 2879.28 | 20,907 | 60,198,226 |
Instalación carpintería metálica x 1 m2 | 287.928 | 20,907 | 6,019,823 |
Tubo 1" x 6 m RDE 13.5 | 1800 | 63,000 | 113,400,000 |
Valor Adicional: | 382,942,448 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 360 | 1,077,612 | 387,940,262 |
Sanitario One Piece Galio Blanco | 360 | 974,000 | 350,640,000 |
Instalación de aparatos sanitarios x unidad | 360 | 103,612 | 37,300,262 |
Punto desagüe sanitario pvc 4" | 1800 | 68,312 | 122,961,731 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 306 | 78,000 | 23,868,000 |
Cuadrilla de albañileria x 1 Hora | 3600 | 24,504 | 88,215,800 |
Limpiador para PVC 1/4 de galón | 67.68 | 99,000 | 6,700,320 |
Soldadura para PVC DE 1/4 de Galón | 56.34 | 74,150 | 4,177,611 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 480 | 207,000 | 99,360,000 |
Tubería PVC sanitaria 4" | 1200 | 156,100 | 187,320,000 |
Valor Adicional: | 797,581,993 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 120 | 23,113 | 2,773,533 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 24 | 94,000 | 2,256,000 |
Cuadrilla de albañileria x 1 Hora | 19.2 | 24,504 | 470,484 |
Cuadrilla de albañileria x 1 Hora | 1.92 | 24,504 | 47,048 |
Interruptor sencillo cuatro vías. Suministro e instalación | 3960 | 23,313 | 92,318,579 |
Interruptor sencillo cuatro vías x 5 unidades | 792 | 95,000 | 75,240,000 |
Cuadrilla de albañileria x 1 Hora | 633.6 | 24,504 | 15,525,981 |
Cuadrilla de albañileria x 1 Hora | 63.36 | 24,504 | 1,552,598 |
Panel de 80W para sistema de energía solar | 480 | 920,900 | 442,032,000 |
Inversor de voltaje 300W | 120 | 297,050 | 35,646,000 |
Caja de control sistema de energía solar | 120 | 1,018,750 | 122,250,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 480 | 731,600 | 351,168,000 |
Tablero trifásico con puerta de 24 circuitos | 120 | 321,000 | 38,520,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 480 | 395,000 | 189,600,000 |
Valor Adicional: | 1,274,308,112 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 15540 | 153,842 | 2,390,698,433 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 11572.638 | 83,900 | 970,944,328 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 77.7 | 135,750 | 10,547,775 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 4195.8 | 32,100 | 134,685,180 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 12742.8 | 25,500 | 324,941,400 |
Cuadrilla de carpintería por hora | 1294.482 | 38,130 | 49,357,977 |
Cuadrilla de carpintería por hora | 12949.482 | 38,130 | 493,757,533 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 77700 | 5,200 | 404,040,000 |
Transporte 1 tonelada x 1 kilómetro | 621.6 | 3,900 | 2,424,240 |
Valor Adicional: | 2,390,698,433 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 15600 | 178,966 | 2,791,873,692 |
Agua para la obra 1 litro | 54600 | 36 | 1,987,440 |
Pegacor max, 25 Kg, porcelanato | 3900 | 85,500 | 333,450,000 |
Porcelanato sellado Beige x 1 m2 | 15600 | 135,900 | 2,120,040,000 |
Cuadrilla de albañileria x 1 Hora | 12480 | 24,504 | 305,814,775 |
Cuadrilla de albañileria x 1 Hora | 1248 | 24,504 | 30,581,477 |
Ascensor 8 personas | 6 | 99,900,000 | 599,400,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 30300 | 12,828 | 388,694,460 |
Intervinil 5 galones, vinilo tipo 2 | 303 | 230,000 | 69,690,000 |
Cuadrilla de pintura x 1 hora | 666.6 | 38,563 | 25,705,969 |
Cuadrilla de pintura x 1 hora | 6666 | 38,563 | 257,059,691 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 6060 | 5,200 | 31,512,000 |
Transporte 1 tonelada x 1 kilómetro | 1212 | 3,900 | 4,726,800 |
Geomembrana Instalación x 1 m2 | 9000 | 13,477 | 121,296,726 |
Cuadrilla de albañileria x 1 Hora | 450 | 24,504 | 11,026,975 |
Cuadrilla de albañileria x 1 Hora | 4500 | 24,504 | 110,269,751 |
Cepillera Attica | 300 | 28,850 | 8,655,000 |
Espejo de 2mm de espesor *1 m2 | 600 | 93,700 | 56,220,000 |
Argolla toalla attica | 300 | 36,250 | 10,875,000 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 37950 | 141,747 | 5,379,285,265 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 37950 | 130,000 | 4,933,500,000 |
Silicona transparente con fungicida 11 Onzas | 3453.45 | 39,050 | 134,857,223 |
Cuadrilla de albañileria x 1 Hora | 9487.5 | 24,504 | 232,485,391 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 13946.625 | 5,200 | 72,522,450 |
Transporte 1 tonelada x 1 kilómetro | 1518 | 3,900 | 5,920,200 |
Valor Adicional: | 9,356,300,143 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 30 | 140,813 | 4,224,402 |
Cascarilla de arroz x bulto 45 Kg | 7.5 | 155,000 | 1,162,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 2.25 | 91,000 | 204,750 |
Plántula aguacate | 30 | 33,250 | 997,500 |
Tierra negra abonada x 1 m3 | 6 | 235,000 | 1,410,000 |
Pala redonda No. 4 mango plástico | 0.15 | 63,000 | 9,450 |
Cuadrilla de instalaciones x 1 Hora | 15 | 26,955 | 404,322 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 6 | 5,200 | 31,200 |
Transporte 1 tonelada x 1 kilómetro | 1.2 | 3,900 | 4,680 |
Valor Adicional: | 4,224,402 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 942432000 | 1 | 942,432,000 |
Valor Adicional: | 942,432,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 471432000 | 1 | 471,432,000 |
Valor Adicional: | 471,432,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 942432000 | 1 | 942,432,000 |
Valor Adicional: | 942,432,000 |
| $589,139 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| $50,900 |
| $1,430,000 |
| $86,200 |
| $25,000 |
| $91,000 |
| $338,250 |
| $38,950 |
| $1,560,000 |
| $275,900 |
| $261,350 |
| $29,550 |
| $182,000 |
| $454,000 |
| $1,356,174,980 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 1045 | 3,900 | 4,075,500 |
Salario mínimo mensual vigente, base | 3.135 | 1,300,000 | 4,075,500 |
Levantamiento topográfico hasta 1,000 m2 | 5 | 2,600,000 | 13,000,000 |
Salario mínimo mensual vigente, base | 10 | 1,300,000 | 13,000,000 |
Replanteo Arquitectónico X 1 m2 | 1045 | 10,038 | 10,489,340 |
Cuerda de Nylon 100 m x 0,50 mm | 52.25 | 50,900 | 2,659,525 |
Estaca de Madera Ø=0.05 L=0.60 m | 522.5 | 6,100 | 3,187,250 |
| 10.45 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 17.138 | 24,504 | 419,956 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 172.3205 | 24,504 | 4,222,609 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 1045 | 28,597 | 29,884,011 |
Salario diario vigente | 689.7 | 43,329 | 29,884,011 |
Estudio de suelos y geotecnia desde | 5 | 4,147,000 | 20,735,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 15 | 650,000 | 9,750,000 |
Ensayo SPT | 5 | 247,000 | 1,235,000 |
Informe Geotécnico y recomendaciones de construcción | 5 | 1,950,000 | 9,750,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 5 | 11,001 | 55,006 |
Salario diario vigente | 1.2695 | 43,329 | 55,006 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1045 | 13,520 | 14,128,400 |
Diseño hidráulico de edificio x 1 m2 | 1045 | 6,760 | 7,064,200 |
Diseño sanitario de edificio x 1 m2, servicio | 1045 | 6,760 | 7,064,200 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1045 | 16,000 | 16,720,000 |
Valor Adicional: | 109,087,257 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 50 | 58,492 | 2,924,599 |
Cuadrilla de albañileria x 1 Hora | 10.85 | 24,504 | 265,873 |
Cuadrilla de albañileria x 1 Hora | 108.5 | 24,504 | 2,658,726 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 2,924,599 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 15 | 484,450 | 7,266,750 |
Punto agua fria PVC 1/2" | 90 | 44,047 | 3,964,185 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 18 | 20,300 | 365,400 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 4.5 | 30,700 | 138,150 |
Codo PVC 90° presión de 1/2" x 10 unidades | 9 | 45,000 | 405,000 |
Soldadura para PVC 1/4 de galón | 3.6 | 53,500 | 192,600 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 1.35 | 77,000 | 103,950 |
Instalación carpintería metálica x 1 m2 | 119.97 | 20,907 | 2,508,259 |
Instalación carpintería metálica x 1 m2 | 11.997 | 20,907 | 250,826 |
Tubo 1" x 6 m RDE 13.5 | 75 | 63,000 | 4,725,000 |
Valor Adicional: | 15,955,935 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 15 | 1,077,612 | 16,164,178 |
Sanitario One Piece Galio Blanco | 15 | 974,000 | 14,610,000 |
Instalación de aparatos sanitarios x unidad | 15 | 103,612 | 1,554,178 |
Punto desagüe sanitario pvc 4" | 75 | 68,312 | 5,123,405 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 12.75 | 78,000 | 994,500 |
Cuadrilla de albañileria x 1 Hora | 150 | 24,504 | 3,675,658 |
Limpiador para PVC 1/4 de galón | 2.82 | 99,000 | 279,180 |
Soldadura para PVC DE 1/4 de Galón | 2.3475 | 74,150 | 174,067 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 20 | 207,000 | 4,140,000 |
Tubería PVC sanitaria 4" | 50 | 156,100 | 7,805,000 |
Valor Adicional: | 33,232,583 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 5 | 23,113 | 115,564 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 1 | 94,000 | 94,000 |
Cuadrilla de albañileria x 1 Hora | 0.8 | 24,504 | 19,604 |
Cuadrilla de albañileria x 1 Hora | 0.08 | 24,504 | 1,960 |
Interruptor sencillo cuatro vías. Suministro e instalación | 165 | 23,313 | 3,846,607 |
Interruptor sencillo cuatro vías x 5 unidades | 33 | 95,000 | 3,135,000 |
Cuadrilla de albañileria x 1 Hora | 26.4 | 24,504 | 646,916 |
Cuadrilla de albañileria x 1 Hora | 2.64 | 24,504 | 64,692 |
Panel de 80W para sistema de energía solar | 20 | 920,900 | 18,418,000 |
Inversor de voltaje 300W | 5 | 297,050 | 1,485,250 |
Caja de control sistema de energía solar | 5 | 1,018,750 | 5,093,750 |
Batería estacionaria 90 Amperios para sistema energía solar | 20 | 731,600 | 14,632,000 |
Tablero trifásico con puerta de 24 circuitos | 5 | 321,000 | 1,605,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 20 | 395,000 | 7,900,000 |
Valor Adicional: | 53,096,171 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 30 | 492,210 | 14,766,300 |
Agua para la obra 1 litro | 5370 | 36 | 195,468 |
Arena lavada de río 1 m3 | 22.68 | 95,019 | 2,155,031 |
Cemento 1 Kg | 9450 | 798 | 7,541,100 |
Triturado de 3/4" x 1 m3 | 22.68 | 150,500 | 3,413,340 |
Mezcladora 1 bulto, alquiler x hora | 30 | 7,150 | 214,500 |
Cuadrilla 7 (8 obreros) x jornal | 2.1 | 578,347 | 1,214,529 |
Oficial de construcción x hora | 2.1 | 15,397 | 32,333 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 40 | 818,067 | 32,722,684 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 40 | 533,055 | 21,322,210 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 118.4 | 13,000 | 1,539,200 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 6 | 155,000 | 930,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 14.4 | 10,000 | 144,000 |
| 52.4 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 326 | 24,504 | 7,988,431 |
Cuadrilla de albañileria x 1 Hora | 32.6 | 24,504 | 798,843 |
Acero G-60 x 1 Kg | 3000 | 5,200 | 15,600,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 70 | 533,055 | 37,313,868 |
Arena lavada de río 1 m3 | 41.16 | 95,019 | 3,910,982 |
Cemento 1 Kg | 25725 | 798 | 20,528,550 |
Triturado de 3/4" x 1 m3 | 61.74 | 150,500 | 9,291,870 |
Agua para la obra 1 litro | 13965 | 36 | 508,326 |
Mezcladora 1 bulto, alquiler x hora | 33.6 | 7,150 | 240,240 |
Cuadrilla 7 (8 obreros) x jornal | 4.9 | 578,347 | 2,833,900 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 10 | 854,441 | 8,544,407 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 10 | 533,055 | 5,330,553 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.1 | 155,000 | 15,500 |
Durmiente ordinario 0,04x0.04x3,00 m. | 10 | 30,000 | 300,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 10 | 32,500 | 325,000 |
Vara clavo 3m | 1.7 | 20,100 | 34,170 |
Cuadrilla de albañileria x 1 Hora | 90 | 24,504 | 2,205,395 |
Cuadrilla de albañileria x 1 Hora | 9 | 24,504 | 220,540 |
Vibrador eléctrico de aguja para concreto x hora | 15 | 7,550 | 113,250 |
Valor Adicional: | 108,947,260 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 1215 | 232,618 | 282,630,758 |
Sistema, Panel x 1 m2 x 0.04 m | 1275.75 | 56,500 | 72,079,875 |
Malla plana RG2 | 486 | 5,350 | 2,600,100 |
Malla RGU 80 | 607.5 | 6,500 | 3,948,750 |
Malla angular RG1 | 607.5 | 6,700 | 4,070,250 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 66.825 | 473,449 | 31,638,242 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 313.47 | 31,013 | 9,721,582 |
Cuadrilla de instalaciones x 1 Hora | 183.222 | 26,955 | 4,938,717 |
Cuadrilla de instalaciones x 1 Hora | 1832.22 | 26,955 | 49,387,175 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 6075 | 5,200 | 31,590,000 |
Transporte 1 tonelada x 1 kilómetro | 48.6 | 3,900 | 189,540 |
Muro panel doble cara x 1 m2 | 121.5 | 232,618 | 28,263,076 |
Muro panel doble cara x 1 m2 | 121.5 | 232,618 | 28,263,076 |
Muro panel doble cara x 1 m2 | 60.75 | 232,618 | 14,131,538 |
Muro panel doble cara x 1 m2 | 7.776 | 232,618 | 1,808,837 |
Valor Adicional: | 282,630,758 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 1000 | 90,690 | 90,689,915 |
Acero G-60 x 1 Kg | 9900 | 5,200 | 51,480,000 |
Pintuco Anticorrosivo rojo | 180 | 95,000 | 17,100,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 120 | 34,650 | 4,158,000 |
Cuadrilla de albañileria x 1 Hora | 666 | 24,504 | 16,319,923 |
Cuadrilla de albañileria x 1 Hora | 66.6 | 24,504 | 1,631,992 |
Teja termoacustica x 1 m2, suministro e instalación | 1140 | 198,448 | 226,231,046 |
Teja termoacústica 3 m x 0.78 m | 487.236 | 393,120 | 191,542,216 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 237.462 | 93,400 | 22,178,951 |
Andamio Tubular estandar con tijeras alquiler por día | 57 | 47,300 | 2,696,100 |
Cuadrilla de instalaciones x 1 Hora | 28.5 | 26,955 | 768,213 |
Cuadrilla de instalaciones x 1 Hora | 285 | 26,955 | 7,682,126 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 228 | 5,200 | 1,185,600 |
Transporte 1 tonelada x 1 kilómetro | 45.6 | 3,900 | 177,840 |
Valor Adicional: | 316,920,961 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Guardaescoba en ceramica porcelanato x 1m | 430 | 23,946 | 10,296,820 |
Agua para la obra 1 litro | 645 | 36 | 23,478 |
Arena lavada de río 1 m3 | 6.45 | 95,019 | 612,873 |
Pegacor max, 25 Kg, porcelanato | 10.75 | 85,500 | 919,125 |
Porcelanato sellado Beige x 1 m2 | 43 | 135,900 | 5,843,700 |
Cuadrilla de albañileria x 1 Hora | 107.5 | 24,504 | 2,634,222 |
Cuadrilla de albañileria x 1 Hora | 10.75 | 24,504 | 263,422 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 550 | 178,966 | 98,431,444 |
Agua para la obra 1 litro | 1925 | 36 | 70,070 |
Pegacor max, 25 Kg, porcelanato | 137.5 | 85,500 | 11,756,250 |
Porcelanato sellado Beige x 1 m2 | 550 | 135,900 | 74,745,000 |
Cuadrilla de albañileria x 1 Hora | 440 | 24,504 | 10,781,931 |
Cuadrilla de albañileria x 1 Hora | 44 | 24,504 | 1,078,193 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 18 | 1,574,907 | 28,348,333 |
Puerta en aluminio con vidrio templado de 6 mm x 1m2 | 36 | 777,000 | 27,972,000 |
Instalación carpintería metálica x 1 m2 | 18 | 20,907 | 376,333 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 75 | 220,857 | 16,564,304 |
Ventana corrediza aluminio anodizado con vidrios x 1m2 | 75 | 199,950 | 14,996,250 |
Instalación carpintería metálica x 1 m2 | 75 | 20,907 | 1,568,054 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1700 | 12,828 | 21,807,940 |
Intervinil 5 galones, vinilo tipo 2 | 17 | 230,000 | 3,910,000 |
Cuadrilla de pintura x 1 hora | 37.4 | 38,563 | 1,442,249 |
Cuadrilla de pintura x 1 hora | 374 | 38,563 | 14,422,491 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 340 | 5,200 | 1,768,000 |
Transporte 1 tonelada x 1 kilómetro | 68 | 3,900 | 265,200 |
Geomembrana Instalación x 1 m2 | 600 | 13,477 | 8,086,448 |
Cuadrilla de albañileria x 1 Hora | 30 | 24,504 | 735,132 |
Cuadrilla de albañileria x 1 Hora | 300 | 24,504 | 7,351,317 |
Cepillera Attica | 15 | 28,850 | 432,750 |
Espejo de 2mm de espesor *1 m2 | 15 | 93,700 | 1,405,500 |
Argolla toalla attica | 15 | 36,250 | 543,750 |
División de baño corrediza | 15 | 550,000 | 8,250,000 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 5 | 505,085 | 2,525,425 |
Puerta de triplex | 40 | 342,450 | 13,698,000 |
Valor Adicional: | 210,390,714 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 50 | 140,813 | 7,040,671 |
Cascarilla de arroz x bulto 45 Kg | 12.5 | 155,000 | 1,937,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 3.75 | 91,000 | 341,250 |
Plántula aguacate | 50 | 33,250 | 1,662,500 |
Tierra negra abonada x 1 m3 | 10 | 235,000 | 2,350,000 |
Pala redonda No. 4 mango plástico | 0.25 | 63,000 | 15,750 |
Cuadrilla de instalaciones x 1 Hora | 25 | 26,955 | 673,871 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 10 | 5,200 | 52,000 |
Transporte 1 tonelada x 1 kilómetro | 2 | 3,900 | 7,800 |
Valor Adicional: | 7,040,671 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 83500000 | 1 | 83,500,000 |
Valor Adicional: | 83,500,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 81000000 | 1 | 81,000,000 |
Valor Adicional: | 81,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 40500000 | 1 | 40,500,000 |
Valor Adicional: | 40,500,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 7769500 | 1 | 7,769,500 |
Valor Adicional: | 7,769,500 |
| $1,236,687,602 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 2 | 1,112,456 | 2,224,912 |
Hora de ingeniero | 60 | 37,082 | 2,224,912 |
Puente, diseño estructural x 1 m2 | 244 | 246,975 | 60,261,973 |
Salario diario vigente | 1390.8 | 43,329 | 60,261,973 |
Valor Adicional: | 62,486,885 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-50 tipo perfil x 1 Kg | 70000 | 8,050 | 563,500,000 |
Soldador mano de obra x hora | 17500 | 16,640 | 291,200,000 |
Salario mínimo mensual vigente, base | 224 | 1,300,000 | 291,200,000 |
Valor Adicional: | 854,700,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 30 | 533,055 | 15,991,658 |
Arena lavada de río 1 m3 | 17.64 | 95,019 | 1,676,135 |
Cemento 1 Kg | 11025 | 798 | 8,797,950 |
Triturado de 3/4" x 1 m3 | 26.46 | 150,500 | 3,982,230 |
Agua para la obra 1 litro | 5985 | 36 | 217,854 |
Mezcladora 1 bulto, alquiler x hora | 14.4 | 7,150 | 102,960 |
Cuadrilla 7 (8 obreros) x jornal | 2.1 | 578,347 | 1,214,529 |
Acero G-60 x 1 Kg | 26000 | 5,200 | 135,200,000 |
Valor Adicional: | 151,191,658 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 400 | 10,038 | 4,015,058 |
Cuerda de Nylon 100 m x 0,50 mm | 20 | 50,900 | 1,018,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 200 | 6,100 | 1,220,000 |
| 4 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 6.56 | 24,504 | 160,749 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 65.96 | 24,504 | 1,616,309 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 2 | 4,147,000 | 8,294,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 6 | 650,000 | 3,900,000 |
Ensayo SPT | 2 | 247,000 | 494,000 |
Informe Geotécnico y recomendaciones de construcción | 2 | 1,950,000 | 3,900,000 |
Valor Adicional: | 12,309,058 |
| $55,150 |
| $77,777,777 |
| $684,000 |
| $360,000 |
| $49,000 |
| $5,801,883 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00044904057 | 12,920,619,720 | 5,801,882 |
Terreno, predio, lote precio por 1m2 | 1.122601425 | 1,000,000 | 1,122,601 |
Levantamiento topográfico hasta 1,000 m2 | 0.00089808114 | 2,600,000 | 2,335 |
Replanteo Arquitectónico X 1 m2 | 3.66641625405 | 10,038 | 36,802 |
Diseño arquitectónico de edificios x 1 m2 | 3.66641625405 | 14,000 | 51,330 |
Estudio de suelos y geotecnia desde | 0.00179616228 | 4,147,000 | 7,449 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 3.66641625405 | 10,400 | 38,131 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 3.66641625405 | 13,520 | 49,570 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 3.66641625405 | 16,000 | 58,663 |
Excavación mecánica en conglomerado x 1 m3 | 3.29775394608 | 4,551 | 15,009 |
Piloteadora, alquiler por Hora | 0.0359232456 | 390,000 | 14,010 |
Acero G-60 x 1 Kg | 184.30151730738 | 5,200 | 958,368 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.95690545467 | 533,055 | 510,083 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.14953050981 | 854,441 | 127,765 |
Steel deck metaldeck grado 40 | 0.73328325081 | 451,000 | 330,711 |
Kit Mueble para baño + lavamanos | 0.0538848684 | 484,450 | 26,105 |
Punto agua fria PVC 1/2" | 0.3233092104 | 44,047 | 14,241 |
Tubo 1" x 6 m RDE 13.5 | 0.269424342 | 63,000 | 16,974 |
Sanitario suministro e instalación | 0.0538848684 | 1,077,612 | 58,067 |
Punto desagüe sanitario pvc 4" | 0.269424342 | 68,312 | 18,405 |
Caja de inspección y distribución | 0.0718464912 | 207,000 | 14,872 |
Tubería PVC sanitaria 4" | 0.179616228 | 156,100 | 28,038 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.0179616228 | 23,113 | 415 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.5927335524 | 23,313 | 13,818 |
Panel de 80W para sistema de energía solar | 0.0718464912 | 920,900 | 66,163 |
Inversor de voltaje 300W | 0.0179616228 | 297,050 | 5,336 |
Caja de control sistema de energía solar | 0.0179616228 | 1,018,750 | 18,298 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.0718464912 | 731,600 | 52,563 |
Tablero trifásico con puerta de 24 circuitos | 0.0179616228 | 321,000 | 5,766 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.0718464912 | 395,000 | 28,379 |
Muro drywall doble cara x 1 m2 | 2.3260301526 | 153,842 | 357,840 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 2.335010964 | 178,966 | 417,888 |
Ascensor 8 personas | 0.00089808114 | 99,900,000 | 89,718 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 4.535309757 | 12,828 | 58,180 |
Geomembrana Instalación x 1 m2 | 1.34712171 | 13,477 | 18,156 |
Cepillera Attica | 0.044904057 | 28,850 | 1,295 |
Espejo de 2mm de espesor *1 m2 | 0.089808114 | 93,700 | 8,415 |
Argolla toalla attica | 0.044904057 | 36,250 | 1,628 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 5.6803632105 | 141,747 | 805,172 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0044904057 | 140,813 | 632 |
Administración | 141063.40082208 | 1 | 141,063 |
Imprevistos | 70564.03133208 | 1 | 70,564 |
Utilidad | 141063.40082208 | 1 | 141,063 |
Valor Adicional: | 5,801,882 |
| $458,953 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Bisagras de 3" en niquel | 0.76 | 27,250 | 20,710 |
Cuadrilla de carpintería por hora | 10.31 | 38,130 | 393,115 |
Salario diario vigente | 9.0728 | 43,329 | 393,115 |
Pegante colbón 1 galón | 0.25 | 73,000 | 18,250 |
| 0.15 | 0 | 0 |
Tornillo autoperforante de 8 x 5/8" avellanado madera y aglomerados cobrizado BOLSA 100 unidades | 0.05 | 27,950 | 1,398 |
triplex otobo 4 mm | 0.52 | 49,000 | 25,480 |
Valor Adicional: | 458,953 |
| $28,250 |
| $3,800,000 |
| $48,000 |
| $900,000,000 |
| $185,000 |
| $82,850 |
| $31,200 |
| $4,551 |
| $2,956,000 |
| $27,016 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.4 | 5,200 | 2,080 |
Salario mínimo mensual vigente, base | 0.0016 | 1,300,000 | 2,080 |
Transporte 1 tonelada x 1 kilómetro | 0.4 | 3,900 | 1,560 |
Salario mínimo mensual vigente, base | 0.0012 | 1,300,000 | 1,560 |
Valor Adicional: | 3,640 |
| $777,400 |
| $550,000,000 |
| $375,000 |
| $465,000,000 |
| $1,895,000 |
| $28,450 |
| $45,750 |
| $1,465,000 |
| $560,000 |
| $42,300 |
| $28,250 |
| $46,000 |
| $75,000 |
| $3,572,000 |
| $7,980,000 |
| $143,000 |
| $1,350,000 |
| $40,000 |
| $25,400 |
| $325,000 |
| $26,650 |
| $125,500 |
| $156,000 |
| $26,100 |
| $95,000 |
| $143,000 |
| $980,750,000 |
| $117,000 |
| $81,500 |
| $32,500 |
| $2,168,530 |
| $3,042 |
| $97,500 |
| $107,700 |
| $97,500 |
| $357,000 |
| $179,000 |
| $43,000 |
| $149,900 |
| $69,700 |
| $380,000 |
| $119,000 |
| $27,300 |
| $1,520,000 |
| $286,000 |
| $91,000 |
| $48,550 |
| $32,550 |
| $104,000 |
| $50,000 |
| $45,000 |
| $124,000 |
| $86,808 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.2 | 5,200 | 1,040 |
Salario mínimo mensual vigente, base | 0.0008 | 1,300,000 | 1,040 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 1,196 |
| $38,200 |
| $390,000 |
| $193,284,614 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 103.16 | 533,055 | 54,989,981 |
Arena lavada de río 1 m3 | 60.65808 | 95,019 | 5,763,670 |
Cemento 1 Kg | 37911.3 | 798 | 30,253,217 |
Triturado de 3/4" x 1 m3 | 90.98712 | 150,500 | 13,693,562 |
Agua para la obra 1 litro | 20580.42 | 36 | 749,127 |
Mezcladora 1 bulto, alquiler x hora | 49.5168 | 7,150 | 354,045 |
Cuadrilla 7 (8 obreros) x jornal | 7.2212 | 578,347 | 4,176,359 |
Acero G-60 x 1 Kg | 4340 | 5,200 | 22,568,000 |
Cuadrilla de albañileria x 1 Hora | 1600 | 24,504 | 39,207,022 |
Oficial de construcción x hora | 1600 | 15,397 | 24,634,501 |
Ayudante de construcción x 1 hora | 1600 | 9,108 | 14,572,522 |
Valor Adicional: | 116,765,003 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 10 | 533,055 | 5,330,553 |
Arena lavada de río 1 m3 | 5.88 | 95,019 | 558,712 |
Cemento 1 Kg | 3675 | 798 | 2,932,650 |
Triturado de 3/4" x 1 m3 | 8.82 | 150,500 | 1,327,410 |
Agua para la obra 1 litro | 1995 | 36 | 72,618 |
Mezcladora 1 bulto, alquiler x hora | 4.8 | 7,150 | 34,320 |
Cuadrilla 7 (8 obreros) x jornal | 0.7 | 578,347 | 404,843 |
Acero G-60 x 1 Kg | 2600 | 5,200 | 13,520,000 |
Valor Adicional: | 18,850,553 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 400 | 10,038 | 4,015,058 |
Cuerda de Nylon 100 m x 0,50 mm | 20 | 50,900 | 1,018,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 200 | 6,100 | 1,220,000 |
| 4 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 6.56 | 24,504 | 160,749 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 65.96 | 24,504 | 1,616,309 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 2 | 4,147,000 | 8,294,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 6 | 650,000 | 3,900,000 |
Ensayo SPT | 2 | 247,000 | 494,000 |
Informe Geotécnico y recomendaciones de construcción | 2 | 1,950,000 | 3,900,000 |
Valor Adicional: | 12,309,058 |
| $98,000 |
| $34,250 |
| $102,700 |
| $130,000 |
| $18,250,000 |
| $82,900 |
| $950,000 |
| $88,850 |
| $50,700 |
| $6,500,000 |
| $158,000 |
| $45,450 |
| $92,000 |
| $550,000 |
| $7,581 |
| $198,448 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.2 | 5,200 | 1,040 |
Salario mínimo mensual vigente, base | 0.0008 | 1,300,000 | 1,040 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 1,196 |
| $130,000 |
| $5,000 |
| $690,800 |
| $350,150 |
| $195,000 |
| $55,000 |
| $330,000 |
| $14,299 |
| $97,500 |
| $90,700 |
| $219,000 |
| $423,000 |
| $3,551,240 |
| $430,000 |
| $1,070,000 |
| $25,250 |
| $223,500 |
| $570,000 |
| $40,250 |
| $76,650 |
| $24,800 |
| $1,447,300 |
| $355,500 |
| $132,000 |
| $40,000 |
| $390,000 |
| $42,250 |
| $2,168,000 |
| $32,500 |
| $1,000,000 |
| $269,000 |
| $99,900 |
| $650,000 |
| $2,391,250 |
| $1,800 |
| $4,940,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, base | 3 | 1,300,000 | 3,900,000 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 200 | 5,200 | 1,040,000 |
Salario mínimo mensual vigente, base | 0.8 | 1,300,000 | 1,040,000 |
Valor Adicional: | 4,940,000 |
| $149,000 |
| $175,500 |
| $1,346,500 |
| $104,000 |
| $4,500,000 |
| $8,666 |
| $1,696,200 |
| $50,000 |
| $8,636,000 |
| $190,000 |
| $40,000 |
| $795,000 |
| $1 |
| $1,560,000 |
| $73,650 |
| $25,750 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.