| $579,600 |
| $2,119,000 |
| $1,190,046 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 1.2 | 95,019 | 114,023 |
Arena lavada de río 6 m3 | 0.20004 | 570,000 | 114,023 |
Cemento 1 Kg | 1000 | 798 | 798,000 |
Cemento, bulto de 50 Kg | 20 | 39,900 | 798,000 |
Triturado de 3/4" x 1 m3 | 1.2 | 150,500 | 180,600 |
Grava 3/4" x 6 m3 | 0.200000004 | 903,000 | 180,600 |
Valor Adicional: | 1,092,623 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cuadrilla 7 (8 obreros) x jornal | 0.14 | 578,347 | 80,969 |
Salario mínimo mensual vigente, incluyendo complementos | 0.037338 | 2,168,530 | 80,969 |
Oficial de construcción x hora | 0.14 | 15,397 | 2,156 |
Salario mínimo mensual vigente, incluyendo complementos | 0.000994 | 2,168,530 | 2,156 |
Valor Adicional: | 83,124 |
| $234,000 |
| $31,750 |
| $41,400 |
| $50,050 |
| $32,950 |
| $246,975 |
| $79,800 |
| $24,900 |
| $336,000 |
| $295,000 |
| $220,400 |
| $27,250 |
| $56,900 |
| $95,500 |
| $65,300 |
| $89,500 |
| $992,730,233 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 1 | 1,199,995 | 1,199,995 |
Hora de ingeniero | 32.3607 | 37,082 | 1,199,995 |
Puente, diseño estructural x 1 m2 | 122 | 246,975 | 30,130,987 |
Salario diario vigente | 695.4 | 43,329 | 30,130,987 |
Valor Adicional: | 31,330,982 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero galvanizado G-50 tipo perfil x 1 Kg | 48600 | 13,181 | 640,596,600 |
Soldador mano de obra x hora | 8750 | 16,640 | 145,600,000 |
Salario mínimo mensual vigente, base | 112 | 1,300,000 | 145,600,000 |
Valor Adicional: | 786,196,600 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 15 | 533,055 | 7,995,829 |
Arena lavada de río 1 m3 | 8.82 | 95,019 | 838,068 |
Cemento 1 Kg | 5512.5 | 798 | 4,398,975 |
Triturado de 3/4" x 1 m3 | 13.23 | 150,500 | 1,991,115 |
Agua para la obra 1 litro | 2992.5 | 36 | 108,927 |
Mezcladora 1 bulto, alquiler x hora | 7.2 | 7,150 | 51,480 |
Cuadrilla 7 (8 obreros) x jornal | 1.05 | 578,347 | 607,264 |
Acero G-60 x 1 Kg | 13000 | 5,200 | 67,600,000 |
Valor Adicional: | 75,595,829 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 500 | 10,038 | 5,018,823 |
Cuerda de Nylon 100 m x 0,50 mm | 25 | 50,900 | 1,272,500 |
Estaca de Madera Ø=0.05 L=0.60 m | 250 | 6,100 | 1,525,000 |
| 5 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 8.2 | 24,504 | 200,936 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 82.45 | 24,504 | 2,020,387 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 4 | 4,147,000 | 16,588,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 12 | 650,000 | 7,800,000 |
Ensayo SPT | 4 | 247,000 | 988,000 |
Informe Geotécnico y recomendaciones de construcción | 4 | 1,950,000 | 7,800,000 |
Valor Adicional: | 21,606,823 |
| $67,050 |
| $128,550 |
| $2,990,000 |
| $380,000 |
| $6,000,000 |
| $1,527,450 |
| $699,000 |
| $325,000 |
| $445,300 |
| $184,200 |
| $970,895 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa en obra gris de 1 planta y 209 m2 presupuesto de construcción | 0.0048 | 202,269,719 | 970,895 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 1.0032 | 3,900 | 3,912 |
Levantamiento topográfico hasta 1,000 m2 | 0.0048 | 2,600,000 | 12,480 |
Replanteo Arquitectónico X 1 m2 | 1.0032 | 10,038 | 10,070 |
Diseño arquitectónico de casa personalizada x 1 m2 | 1.0032 | 28,597 | 28,689 |
Estudio de suelos y geotecnia desde | 0.0048 | 4,147,000 | 19,906 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.0048 | 11,001 | 53 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.0032 | 13,520 | 13,563 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.0032 | 16,000 | 16,051 |
Excavación manual en conglomerado x 1 m3 | 0.048 | 58,492 | 2,808 |
Kit Mueble para baño + lavamanos | 0.0144 | 484,450 | 6,976 |
Punto agua fria PVC 1/2" | 0.0864 | 44,047 | 3,806 |
Tubo 1" x 6 m RDE 13.5 | 0.072 | 63,000 | 4,536 |
Sanitario suministro e instalación | 0.0144 | 1,077,612 | 15,518 |
Punto desagüe sanitario pvc 4" | 0.072 | 68,312 | 4,918 |
Caja de inspección y distribución | 0.0192 | 207,000 | 3,974 |
Tubería PVC sanitaria 4" | 0.048 | 156,100 | 7,493 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.0288 | 492,210 | 14,176 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.0384 | 818,067 | 31,414 |
Acero G-60 x 1 Kg | 2.88 | 5,200 | 14,976 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.0672 | 533,055 | 35,821 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.0096 | 858,441 | 8,241 |
Muro panel doble cara x 1 m2 | 1.1664 | 232,618 | 271,326 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 0.96 | 90,690 | 87,062 |
Teja termoacustica x 1 m2, suministro e instalación | 1.0944 | 198,448 | 217,182 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.048 | 140,813 | 6,759 |
Aseo general para entrega de obra x metro cuadrado | 1.0032 | 3,042 | 3,051 |
Administración | 60960 | 1 | 60,960 |
Imprevistos | 29760 | 1 | 29,760 |
Utilidad | 29760 | 1 | 29,760 |
Unidad Monetaria | 5654.4 | 1 | 5,654 |
Valor Adicional: | 970,895 |
| $96,144,255,888 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 19200 | 1,000,000 | 19,200,000,000 |
Valor Adicional: | 19,200,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 15 | 2,600,000 | 39,000,000 |
Salario mínimo mensual vigente, base | 30 | 1,300,000 | 39,000,000 |
Replanteo Arquitectónico X 1 m2 | 73485 | 10,038 | 737,616,394 |
Cuerda de Nylon 100 m x 0,50 mm | 3674.25 | 50,900 | 187,019,325 |
Estaca de Madera Ø=0.05 L=0.60 m | 36742.5 | 6,100 | 224,129,250 |
| 734.85 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 1205.154 | 24,504 | 29,531,562 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 12117.6765 | 24,504 | 296,936,259 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 73485 | 14,000 | 1,028,790,000 |
Estudio de suelos y geotecnia desde | 30 | 4,147,000 | 124,410,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 90 | 650,000 | 58,500,000 |
Ensayo SPT | 30 | 247,000 | 7,410,000 |
Informe Geotécnico y recomendaciones de construcción | 30 | 1,950,000 | 58,500,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 73485 | 10,400 | 764,244,000 |
Salario mínimo mensual vigente, base | 587.88 | 1,300,000 | 764,244,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 73485 | 13,520 | 993,517,200 |
Diseño hidráulico de edificio x 1 m2 | 73485 | 6,760 | 496,758,600 |
Diseño sanitario de edificio x 1 m2, servicio | 73485 | 6,760 | 496,758,600 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 73485 | 16,000 | 1,175,760,000 |
Valor Adicional: | 4,863,337,594 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 63432 | 4,551 | 288,694,890 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 1585.8 | 182,050 | 288,694,890 |
Piloteadora, alquiler por Hora | 240 | 390,000 | 93,600,000 |
Salario mínimo mensual vigente, base | 72 | 1,300,000 | 93,600,000 |
Valor Adicional: | 382,294,890 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 3693909 | 5,200 | 19,208,326,800 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 19173 | 533,055 | 10,220,268,523 |
Arena lavada de río 1 m3 | 11273.724 | 95,019 | 1,071,217,981 |
Cemento 1 Kg | 7046077.5 | 798 | 5,622,769,845 |
Triturado de 3/4" x 1 m3 | 16910.586 | 150,500 | 2,545,043,244 |
Agua para la obra 1 litro | 3825013.5 | 36 | 139,230,491 |
Mezcladora 1 bulto, alquiler x hora | 9203.04 | 7,150 | 65,801,736 |
Cuadrilla 7 (8 obreros) x jornal | 1342.11 | 578,347 | 776,205,226 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 3000 | 858,441 | 2,575,322,137 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 3000 | 533,055 | 1,599,165,784 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 30 | 155,000 | 4,650,000 |
Durmiente ordinario 0,04x0.04x3,00 m. | 3000 | 30,000 | 90,000,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 3000 | 36,500 | 109,500,000 |
Vara clavo 3m | 510 | 20,100 | 10,251,000 |
Cuadrilla de albañileria x 1 Hora | 27000 | 24,504 | 661,618,503 |
Cuadrilla de albañileria x 1 Hora | 2700 | 24,504 | 66,161,850 |
Vibrador eléctrico de aguja para concreto x hora | 4500 | 7,550 | 33,975,000 |
Valor Adicional: | 32,003,917,460 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 1080 | 484,450 | 523,206,000 |
Punto agua fria PVC 1/2" | 6480 | 44,047 | 285,421,345 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 1296 | 20,300 | 26,308,800 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 324 | 30,700 | 9,946,800 |
Codo PVC 90° presión de 1/2" x 10 unidades | 648 | 45,000 | 29,160,000 |
Soldadura para PVC 1/4 de galón | 259.2 | 53,500 | 13,867,200 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 97.2 | 77,000 | 7,484,400 |
Instalación carpintería metálica x 1 m2 | 8637.84 | 20,907 | 180,594,678 |
Instalación carpintería metálica x 1 m2 | 863.784 | 20,907 | 18,059,468 |
Tubo 1" x 6 m RDE 13.5 | 5400 | 63,000 | 340,200,000 |
Valor Adicional: | 1,148,827,345 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 1080 | 1,077,612 | 1,163,820,786 |
Sanitario One Piece Galio Blanco | 1080 | 974,000 | 1,051,920,000 |
Instalación de aparatos sanitarios x unidad | 1080 | 103,612 | 111,900,786 |
Punto desagüe sanitario pvc 4" | 5400 | 68,312 | 368,885,194 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 918 | 78,000 | 71,604,000 |
Cuadrilla de albañileria x 1 Hora | 10800 | 24,504 | 264,647,401 |
Limpiador para PVC 1/4 de galón | 203.04 | 99,000 | 20,100,960 |
Soldadura para PVC DE 1/4 de Galón | 169.02 | 74,150 | 12,532,833 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 1440 | 207,000 | 298,080,000 |
Tubería PVC sanitaria 4" | 3600 | 156,100 | 561,960,000 |
Valor Adicional: | 2,392,745,980 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 360 | 23,113 | 8,320,598 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 72 | 94,000 | 6,768,000 |
Cuadrilla de albañileria x 1 Hora | 57.6 | 24,504 | 1,411,453 |
Cuadrilla de albañileria x 1 Hora | 5.76 | 24,504 | 141,145 |
Interruptor sencillo cuatro vías. Suministro e instalación | 11880 | 23,313 | 276,955,737 |
Interruptor sencillo cuatro vías x 5 unidades | 2376 | 95,000 | 225,720,000 |
Cuadrilla de albañileria x 1 Hora | 1900.8 | 24,504 | 46,577,943 |
Cuadrilla de albañileria x 1 Hora | 190.08 | 24,504 | 4,657,794 |
Panel de 80W para sistema de energía solar | 1440 | 920,900 | 1,326,096,000 |
Inversor de voltaje 300W | 360 | 297,050 | 106,938,000 |
Caja de control sistema de energía solar | 360 | 1,018,750 | 366,750,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 1440 | 731,600 | 1,053,504,000 |
Tablero trifásico con puerta de 24 circuitos | 360 | 321,000 | 115,560,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 1440 | 395,000 | 568,800,000 |
Valor Adicional: | 3,822,924,335 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 46620 | 153,842 | 7,172,095,299 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 34717.914 | 83,900 | 2,912,832,985 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 233.1 | 135,750 | 31,643,325 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 12587.4 | 32,100 | 404,055,540 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 38228.4 | 25,500 | 974,824,200 |
Cuadrilla de carpintería por hora | 3883.446 | 38,130 | 148,073,932 |
Cuadrilla de carpintería por hora | 38848.446 | 38,130 | 1,481,272,599 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 233100 | 5,200 | 1,212,120,000 |
Transporte 1 tonelada x 1 kilómetro | 1864.8 | 3,900 | 7,272,720 |
Valor Adicional: | 7,172,095,299 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 18 | 99,900,000 | 1,798,200,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 90750 | 12,828 | 1,164,159,150 |
Intervinil 5 galones, vinilo tipo 2 | 907.5 | 230,000 | 208,725,000 |
Cuadrilla de pintura x 1 hora | 1996.5 | 38,563 | 76,990,650 |
Cuadrilla de pintura x 1 hora | 19965 | 38,563 | 769,906,502 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 18150 | 5,200 | 94,380,000 |
Transporte 1 tonelada x 1 kilómetro | 3630 | 3,900 | 14,157,000 |
Geomembrana Instalación x 1 m2 | 61200 | 13,477 | 824,817,737 |
Cuadrilla de albañileria x 1 Hora | 3060 | 24,504 | 74,983,430 |
Cuadrilla de albañileria x 1 Hora | 30600 | 24,504 | 749,834,303 |
Cepillera Attica | 900 | 28,850 | 25,965,000 |
Espejo de 2mm de espesor *1 m2 | 1800 | 93,700 | 168,660,000 |
Argolla toalla attica | 900 | 36,250 | 32,625,000 |
Valor Adicional: | 4,014,426,887 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 1200 | 140,813 | 168,976,097 |
Cascarilla de arroz x bulto 45 Kg | 300 | 155,000 | 46,500,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 90 | 91,000 | 8,190,000 |
Plántula aguacate | 1200 | 33,250 | 39,900,000 |
Tierra negra abonada x 1 m3 | 240 | 235,000 | 56,400,000 |
Pala redonda No. 4 mango plástico | 6 | 63,000 | 378,000 |
Cuadrilla de instalaciones x 1 Hora | 600 | 26,955 | 16,172,897 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 240 | 5,200 | 1,248,000 |
Transporte 1 tonelada x 1 kilómetro | 48 | 3,900 | 187,200 |
Valor Adicional: | 168,976,097 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 8082000000 | 1 | 8,082,000,000 |
Valor Adicional: | 8,082,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 8082000000 | 1 | 8,082,000,000 |
Valor Adicional: | 8,082,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 4042710000 | 1 | 4,042,710,000 |
Valor Adicional: | 4,042,710,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 768000000 | 1 | 768,000,000 |
Valor Adicional: | 768,000,000 |
| $49,000 |
| $457,000 |
| $104,000 |
| $533,055 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| $239,714,010 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 200 | 3,900 | 780,000 |
Salario mínimo mensual vigente, base | 0.6 | 1,300,000 | 780,000 |
| 0 | 0 | 0 |
4655" target="_blank"> | 2 | 0 | 0 |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 200 | 28,597 | 5,719,428 |
Salario diario vigente | 132 | 43,329 | 5,719,428 |
Estudio de suelos y geotecnia desde | 2 | 4,147,000 | 8,294,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 6 | 650,000 | 3,900,000 |
Ensayo SPT | 2 | 247,000 | 494,000 |
Informe Geotécnico y recomendaciones de construcción | 2 | 1,950,000 | 3,900,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 2 | 11,001 | 22,002 |
Salario diario vigente | 0.5078 | 43,329 | 22,002 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 200 | 13,520 | 2,704,000 |
Diseño hidráulico de edificio x 1 m2 | 200 | 6,760 | 1,352,000 |
Diseño sanitario de edificio x 1 m2, servicio | 200 | 6,760 | 1,352,000 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 200 | 16,000 | 3,200,000 |
Valor Adicional: | 22,726,960 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Punto desagüe sanitario pvc 4" | 30 | 68,312 | 2,049,362 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 5.1 | 78,000 | 397,800 |
Cuadrilla de albañileria x 1 Hora | 60 | 24,504 | 1,470,263 |
Limpiador para PVC 1/4 de galón | 1.128 | 99,000 | 111,672 |
Soldadura para PVC DE 1/4 de Galón | 0.939 | 74,150 | 69,627 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 2,049,362 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Panel de 80W para sistema de energía solar | 8 | 920,900 | 7,367,200 |
Inversor de voltaje 300W | 2 | 297,050 | 594,100 |
Caja de control sistema de energía solar | 2 | 1,018,750 | 2,037,500 |
Batería estacionaria 90 Amperios para sistema energía solar | 8 | 731,600 | 5,852,800 |
Valor Adicional: | 15,851,600 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 1200 | 5,200 | 6,240,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 28 | 533,055 | 14,925,547 |
Arena lavada de río 1 m3 | 16.464 | 95,019 | 1,564,393 |
Cemento 1 Kg | 10290 | 798 | 8,211,420 |
Triturado de 3/4" x 1 m3 | 24.696 | 150,500 | 3,716,748 |
Agua para la obra 1 litro | 5586 | 36 | 203,330 |
Mezcladora 1 bulto, alquiler x hora | 13.44 | 7,150 | 96,096 |
Cuadrilla 7 (8 obreros) x jornal | 1.96 | 578,347 | 1,133,560 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4 | 858,441 | 3,433,763 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 4 | 533,055 | 2,132,221 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.04 | 155,000 | 6,200 |
Durmiente ordinario 0,04x0.04x3,00 m. | 4 | 30,000 | 120,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 4 | 36,500 | 146,000 |
Vara clavo 3m | 0.68 | 20,100 | 13,668 |
Cuadrilla de albañileria x 1 Hora | 36 | 24,504 | 882,158 |
Cuadrilla de albañileria x 1 Hora | 3.6 | 24,504 | 88,216 |
Vibrador eléctrico de aguja para concreto x hora | 6 | 7,550 | 45,300 |
Valor Adicional: | 24,599,310 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 340 | 153,842 | 52,306,143 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 253.198 | 83,900 | 21,243,312 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 1.7 | 135,750 | 230,775 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 91.8 | 32,100 | 2,946,780 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 278.8 | 25,500 | 7,109,400 |
Cuadrilla de carpintería por hora | 28.322 | 38,130 | 1,079,904 |
Cuadrilla de carpintería por hora | 283.322 | 38,130 | 10,802,932 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 1700 | 5,200 | 8,840,000 |
Transporte 1 tonelada x 1 kilómetro | 13.6 | 3,900 | 53,040 |
Valor Adicional: | 52,306,143 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Teja termoacustica x 1 m2, suministro e instalación | 220 | 198,448 | 43,658,623 |
Teja termoacústica 3 m x 0.78 m | 94.028 | 393,120 | 36,964,287 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 45.826 | 93,400 | 4,280,148 |
Andamio Tubular estandar con tijeras alquiler por día | 11 | 47,300 | 520,300 |
Cuadrilla de instalaciones x 1 Hora | 5.5 | 26,955 | 148,252 |
Cuadrilla de instalaciones x 1 Hora | 55 | 26,955 | 1,482,516 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 44 | 5,200 | 228,800 |
Transporte 1 tonelada x 1 kilómetro | 8.8 | 3,900 | 34,320 |
Valor Adicional: | 43,658,623 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 0 | 99,900,000 | 0 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 680 | 12,828 | 8,723,176 |
Intervinil 5 galones, vinilo tipo 2 | 6.8 | 230,000 | 1,564,000 |
Cuadrilla de pintura x 1 hora | 14.96 | 38,563 | 576,900 |
Cuadrilla de pintura x 1 hora | 149.6 | 38,563 | 5,768,996 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 136 | 5,200 | 707,200 |
Transporte 1 tonelada x 1 kilómetro | 27.2 | 3,900 | 106,080 |
Geomembrana Instalación x 1 m2 | 240 | 13,477 | 3,234,579 |
Cuadrilla de albañileria x 1 Hora | 12 | 24,504 | 294,053 |
Cuadrilla de albañileria x 1 Hora | 120 | 24,504 | 2,940,527 |
Cepillera Attica | 6 | 28,850 | 173,100 |
Espejo de 2mm de espesor *1 m2 | 6 | 93,700 | 562,200 |
Argolla toalla attica | 6 | 36,250 | 217,500 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 60 | 141,747 | 8,504,799 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 60 | 130,000 | 7,800,000 |
Silicona transparente con fungicida 11 Onzas | 5.46 | 39,050 | 213,213 |
Cuadrilla de albañileria x 1 Hora | 15 | 24,504 | 367,566 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 22.05 | 5,200 | 114,660 |
Transporte 1 tonelada x 1 kilómetro | 2.4 | 3,900 | 9,360 |
Valor Adicional: | 21,415,354 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 20 | 140,813 | 2,816,268 |
Cascarilla de arroz x bulto 45 Kg | 5 | 155,000 | 775,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 1.5 | 91,000 | 136,500 |
Plántula aguacate | 20 | 33,250 | 665,000 |
Tierra negra abonada x 1 m3 | 4 | 235,000 | 940,000 |
Pala redonda No. 4 mango plástico | 0.1 | 63,000 | 6,300 |
Cuadrilla de instalaciones x 1 Hora | 10 | 26,955 | 269,548 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4 | 5,200 | 20,800 |
Transporte 1 tonelada x 1 kilómetro | 0.8 | 3,900 | 3,120 |
Valor Adicional: | 2,816,268 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 20000000 | 1 | 20,000,000 |
Valor Adicional: | 20,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 20000000 | 1 | 20,000,000 |
Valor Adicional: | 20,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 11600000 | 1 | 11,600,000 |
Valor Adicional: | 11,600,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 1900000 | 1 | 1,900,000 |
Valor Adicional: | 1,900,000 |
| $75,000 |
| $3,203,250 |
| $935,000 |
| $91,000 |
| $458,953 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Bisagras de 3" en niquel | 0.76 | 27,250 | 20,710 |
Cuadrilla de carpintería por hora | 10.31 | 38,130 | 393,115 |
Salario diario vigente | 9.0728 | 43,329 | 393,115 |
Pegante colbón 1 galón | 0.25 | 73,000 | 18,250 |
| 0.15 | 0 | 0 |
Tornillo autoperforante de 8 x 5/8" avellanado madera y aglomerados cobrizado BOLSA 100 unidades | 0.05 | 27,950 | 1,398 |
triplex otobo 4 mm | 0.52 | 49,000 | 25,480 |
Valor Adicional: | 458,953 |
| $2,380,250 |
| $50,000 |
| $1,427,500 |
| $82,700 |
| $83,000 |
| $157,000 |
| $47,500 |
| $2,010,375,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño de pavimento por unidad homogénea de diseño, según cbr y tránsito | 3 | 3,900,000 | 11,700,000 |
Salario mínimo mensual vigente, base | 9 | 1,300,000 | 11,700,000 |
Valor Adicional: | 11,700,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Subbase triturada de 2" x 1 m3 | 2100 | 125,200 | 262,920,000 |
Base granular de 1 1/2" x m3 | 2100 | 126,550 | 265,755,000 |
Asfalto 60/70 por tonelada | 700 | 2,100,000 | 1,470,000,000 |
Valor Adicional: | 1,998,675,000 |
| $900,000,000 |
| $50,000 |
| $546,084,492 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 418 | 3,900 | 1,630,200 |
Salario mínimo mensual vigente, base | 1.254 | 1,300,000 | 1,630,200 |
Levantamiento topográfico hasta 1,000 m2 | 2 | 2,600,000 | 5,200,000 |
Salario mínimo mensual vigente, base | 4 | 1,300,000 | 5,200,000 |
Replanteo Arquitectónico X 1 m2 | 418 | 10,038 | 4,195,736 |
Cuerda de Nylon 100 m x 0,50 mm | 20.9 | 50,900 | 1,063,810 |
Estaca de Madera Ø=0.05 L=0.60 m | 209 | 6,100 | 1,274,900 |
| 4.18 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 6.8552 | 24,504 | 167,982 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 68.9282 | 24,504 | 1,689,043 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 418 | 28,597 | 11,953,605 |
Salario diario vigente | 275.88 | 43,329 | 11,953,605 |
Estudio de suelos y geotecnia desde | 2 | 4,147,000 | 8,294,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 6 | 650,000 | 3,900,000 |
Ensayo SPT | 2 | 247,000 | 494,000 |
Informe Geotécnico y recomendaciones de construcción | 2 | 1,950,000 | 3,900,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 2 | 11,001 | 22,002 |
Salario diario vigente | 0.5078 | 43,329 | 22,002 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 418 | 13,520 | 5,651,360 |
Diseño hidráulico de edificio x 1 m2 | 418 | 6,760 | 2,825,680 |
Diseño sanitario de edificio x 1 m2, servicio | 418 | 6,760 | 2,825,680 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 418 | 16,000 | 6,688,000 |
Valor Adicional: | 43,634,903 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 20 | 58,492 | 1,169,840 |
Cuadrilla de albañileria x 1 Hora | 4.34 | 24,504 | 106,349 |
Cuadrilla de albañileria x 1 Hora | 43.4 | 24,504 | 1,063,490 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 1,169,840 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 6 | 484,450 | 2,906,700 |
Punto agua fria PVC 1/2" | 36 | 44,047 | 1,585,674 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 7.2 | 20,300 | 146,160 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 1.8 | 30,700 | 55,260 |
Codo PVC 90° presión de 1/2" x 10 unidades | 3.6 | 45,000 | 162,000 |
Soldadura para PVC 1/4 de galón | 1.44 | 53,500 | 77,040 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.54 | 77,000 | 41,580 |
Instalación carpintería metálica x 1 m2 | 47.988 | 20,907 | 1,003,304 |
Instalación carpintería metálica x 1 m2 | 4.7988 | 20,907 | 100,330 |
Tubo 1" x 6 m RDE 13.5 | 30 | 63,000 | 1,890,000 |
Valor Adicional: | 6,382,374 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 6 | 1,077,612 | 6,465,671 |
Sanitario One Piece Galio Blanco | 6 | 974,000 | 5,844,000 |
Instalación de aparatos sanitarios x unidad | 6 | 103,612 | 621,671 |
Punto desagüe sanitario pvc 4" | 30 | 68,312 | 2,049,362 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 5.1 | 78,000 | 397,800 |
Cuadrilla de albañileria x 1 Hora | 60 | 24,504 | 1,470,263 |
Limpiador para PVC 1/4 de galón | 1.128 | 99,000 | 111,672 |
Soldadura para PVC DE 1/4 de Galón | 0.939 | 74,150 | 69,627 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 8 | 207,000 | 1,656,000 |
Tubería PVC sanitaria 4" | 20 | 156,100 | 3,122,000 |
Valor Adicional: | 13,293,033 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 2 | 23,113 | 46,226 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 0.4 | 94,000 | 37,600 |
Cuadrilla de albañileria x 1 Hora | 0.32 | 24,504 | 7,841 |
Cuadrilla de albañileria x 1 Hora | 0.032 | 24,504 | 784 |
Interruptor sencillo cuatro vías. Suministro e instalación | 66 | 23,313 | 1,538,643 |
Interruptor sencillo cuatro vías x 5 unidades | 13.2 | 95,000 | 1,254,000 |
Cuadrilla de albañileria x 1 Hora | 10.56 | 24,504 | 258,766 |
Cuadrilla de albañileria x 1 Hora | 1.056 | 24,504 | 25,877 |
Panel de 80W para sistema de energía solar | 8 | 920,900 | 7,367,200 |
Inversor de voltaje 300W | 2 | 297,050 | 594,100 |
Caja de control sistema de energía solar | 2 | 1,018,750 | 2,037,500 |
Batería estacionaria 90 Amperios para sistema energía solar | 8 | 731,600 | 5,852,800 |
Tablero trifásico con puerta de 24 circuitos | 2 | 321,000 | 642,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 8 | 395,000 | 3,160,000 |
Valor Adicional: | 21,238,469 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 12 | 492,210 | 5,906,520 |
Agua para la obra 1 litro | 2148 | 36 | 78,187 |
Arena lavada de río 1 m3 | 9.072 | 95,019 | 862,012 |
Cemento 1 Kg | 3780 | 798 | 3,016,440 |
Triturado de 3/4" x 1 m3 | 9.072 | 150,500 | 1,365,336 |
Mezcladora 1 bulto, alquiler x hora | 12 | 7,150 | 85,800 |
Cuadrilla 7 (8 obreros) x jornal | 0.84 | 578,347 | 485,811 |
Oficial de construcción x hora | 0.84 | 15,397 | 12,933 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 16 | 818,067 | 13,089,074 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 16 | 533,055 | 8,528,884 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 47.36 | 13,000 | 615,680 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 2.4 | 155,000 | 372,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 5.76 | 10,000 | 57,600 |
| 20.96 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 130.4 | 24,504 | 3,195,372 |
Cuadrilla de albañileria x 1 Hora | 13.04 | 24,504 | 319,537 |
Acero G-60 x 1 Kg | 1200 | 5,200 | 6,240,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 28 | 533,055 | 14,925,547 |
Arena lavada de río 1 m3 | 16.464 | 95,019 | 1,564,393 |
Cemento 1 Kg | 10290 | 798 | 8,211,420 |
Triturado de 3/4" x 1 m3 | 24.696 | 150,500 | 3,716,748 |
Agua para la obra 1 litro | 5586 | 36 | 203,330 |
Mezcladora 1 bulto, alquiler x hora | 13.44 | 7,150 | 96,096 |
Cuadrilla 7 (8 obreros) x jornal | 1.96 | 578,347 | 1,133,560 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4 | 858,441 | 3,433,763 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 4 | 533,055 | 2,132,221 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.04 | 155,000 | 6,200 |
Durmiente ordinario 0,04x0.04x3,00 m. | 4 | 30,000 | 120,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 4 | 36,500 | 146,000 |
Vara clavo 3m | 0.68 | 20,100 | 13,668 |
Cuadrilla de albañileria x 1 Hora | 36 | 24,504 | 882,158 |
Cuadrilla de albañileria x 1 Hora | 3.6 | 24,504 | 88,216 |
Vibrador eléctrico de aguja para concreto x hora | 6 | 7,550 | 45,300 |
Valor Adicional: | 43,594,904 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 486 | 232,618 | 113,052,303 |
Sistema, Panel x 1 m2 x 0.04 m | 510.3 | 56,500 | 28,831,950 |
Malla plana RG2 | 194.4 | 5,350 | 1,040,040 |
Malla RGU 80 | 243 | 6,500 | 1,579,500 |
Malla angular RG1 | 243 | 6,700 | 1,628,100 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 26.73 | 473,449 | 12,655,297 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 125.388 | 31,013 | 3,888,633 |
Cuadrilla de instalaciones x 1 Hora | 73.2888 | 26,955 | 1,975,487 |
Cuadrilla de instalaciones x 1 Hora | 732.888 | 26,955 | 19,754,870 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2430 | 5,200 | 12,636,000 |
Transporte 1 tonelada x 1 kilómetro | 19.44 | 3,900 | 75,816 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 24.3 | 232,618 | 5,652,615 |
Muro panel doble cara x 1 m2 | 3.1104 | 232,618 | 723,535 |
Valor Adicional: | 113,052,303 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 400 | 90,690 | 36,275,966 |
Acero G-60 x 1 Kg | 3960 | 5,200 | 20,592,000 |
Pintuco Anticorrosivo rojo | 72 | 95,000 | 6,840,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 48 | 34,650 | 1,663,200 |
Cuadrilla de albañileria x 1 Hora | 266.4 | 24,504 | 6,527,969 |
Cuadrilla de albañileria x 1 Hora | 26.64 | 24,504 | 652,797 |
Teja termoacustica x 1 m2, suministro e instalación | 456 | 198,448 | 90,492,418 |
Teja termoacústica 3 m x 0.78 m | 194.8944 | 393,120 | 76,616,887 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 94.9848 | 93,400 | 8,871,580 |
Andamio Tubular estandar con tijeras alquiler por día | 22.8 | 47,300 | 1,078,440 |
Cuadrilla de instalaciones x 1 Hora | 11.4 | 26,955 | 307,285 |
Cuadrilla de instalaciones x 1 Hora | 114 | 26,955 | 3,072,850 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 91.2 | 5,200 | 474,240 |
Transporte 1 tonelada x 1 kilómetro | 18.24 | 3,900 | 71,136 |
Valor Adicional: | 126,768,384 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Guardaescoba en ceramica porcelanato x 1m | 172 | 23,946 | 4,118,728 |
Agua para la obra 1 litro | 258 | 36 | 9,391 |
Arena lavada de río 1 m3 | 2.58 | 95,019 | 245,149 |
Pegacor max, 25 Kg, porcelanato | 4.3 | 85,500 | 367,650 |
Porcelanato sellado Beige x 1 m2 | 17.2 | 135,900 | 2,337,480 |
Cuadrilla de albañileria x 1 Hora | 43 | 24,504 | 1,053,689 |
Cuadrilla de albañileria x 1 Hora | 4.3 | 24,504 | 105,369 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 220 | 178,966 | 39,372,578 |
Agua para la obra 1 litro | 770 | 36 | 28,028 |
Pegacor max, 25 Kg, porcelanato | 55 | 85,500 | 4,702,500 |
Porcelanato sellado Beige x 1 m2 | 220 | 135,900 | 29,898,000 |
Cuadrilla de albañileria x 1 Hora | 176 | 24,504 | 4,312,772 |
Cuadrilla de albañileria x 1 Hora | 17.6 | 24,504 | 431,277 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 7.2 | 1,574,907 | 11,339,333 |
Puerta en aluminio con vidrio templado de 6 mm x 1m2 | 14.4 | 777,000 | 11,188,800 |
Instalación carpintería metálica x 1 m2 | 7.2 | 20,907 | 150,533 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 30 | 340,807 | 10,224,222 |
Ventana corrediza aluminio anodizado con vidrios x 1m2 | 30 | 319,900 | 9,597,000 |
Instalación carpintería metálica x 1 m2 | 30 | 20,907 | 627,222 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 680 | 12,828 | 8,723,176 |
Intervinil 5 galones, vinilo tipo 2 | 6.8 | 230,000 | 1,564,000 |
Cuadrilla de pintura x 1 hora | 14.96 | 38,563 | 576,900 |
Cuadrilla de pintura x 1 hora | 149.6 | 38,563 | 5,768,996 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 136 | 5,200 | 707,200 |
Transporte 1 tonelada x 1 kilómetro | 27.2 | 3,900 | 106,080 |
Geomembrana Instalación x 1 m2 | 240 | 13,477 | 3,234,579 |
Cuadrilla de albañileria x 1 Hora | 12 | 24,504 | 294,053 |
Cuadrilla de albañileria x 1 Hora | 120 | 24,504 | 2,940,527 |
Cepillera Attica | 6 | 28,850 | 173,100 |
Espejo de 2mm de espesor *1 m2 | 6 | 93,700 | 562,200 |
Argolla toalla attica | 6 | 36,250 | 217,500 |
División de baño corrediza | 6 | 550,000 | 3,300,000 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 2 | 505,085 | 1,010,170 |
Puerta de triplex | 16 | 342,450 | 5,479,200 |
Valor Adicional: | 87,754,786 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 20 | 140,813 | 2,816,268 |
Cascarilla de arroz x bulto 45 Kg | 5 | 155,000 | 775,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 1.5 | 91,000 | 136,500 |
Plántula aguacate | 20 | 33,250 | 665,000 |
Tierra negra abonada x 1 m3 | 4 | 235,000 | 940,000 |
Pala redonda No. 4 mango plástico | 0.1 | 63,000 | 6,300 |
Cuadrilla de instalaciones x 1 Hora | 10 | 26,955 | 269,548 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4 | 5,200 | 20,800 |
Transporte 1 tonelada x 1 kilómetro | 0.8 | 3,900 | 3,120 |
Valor Adicional: | 2,816,268 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 33400000 | 1 | 33,400,000 |
Valor Adicional: | 33,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 32400000 | 1 | 32,400,000 |
Valor Adicional: | 32,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 16200000 | 1 | 16,200,000 |
Valor Adicional: | 16,200,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 3107800 | 1 | 3,107,800 |
Valor Adicional: | 3,107,800 |
| $37,560 |
| $50,500 |
| $1,299,135 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa nueva de 1 planta y 209 m2 presupuesto de construcción | 0.004758 | 273,042,246 | 1,299,135 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 0.994422 | 3,900 | 3,878 |
Levantamiento topográfico hasta 1,000 m2 | 0.004758 | 2,600,000 | 12,371 |
Replanteo Arquitectónico X 1 m2 | 0.994422 | 10,038 | 9,982 |
Diseño arquitectónico de casa personalizada x 1 m2 | 0.994422 | 28,597 | 28,438 |
Estudio de suelos y geotecnia desde | 0.004758 | 4,147,000 | 19,731 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.004758 | 11,001 | 52 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 0.994422 | 13,520 | 13,445 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 0.994422 | 16,000 | 15,911 |
Excavación manual en conglomerado x 1 m3 | 0.04758 | 58,492 | 2,783 |
Kit Mueble para baño + lavamanos | 0.014274 | 484,450 | 6,915 |
Punto agua fria PVC 1/2" | 0.085644 | 44,047 | 3,772 |
Tubo 1" x 6 m RDE 13.5 | 0.07137 | 63,000 | 4,496 |
Sanitario suministro e instalación | 0.014274 | 1,077,612 | 15,382 |
Punto desagüe sanitario pvc 4" | 0.07137 | 68,312 | 4,875 |
Caja de inspección y distribución | 0.019032 | 207,000 | 3,940 |
Tubería PVC sanitaria 4" | 0.04758 | 156,100 | 7,427 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.004758 | 23,113 | 110 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.157014 | 23,313 | 3,660 |
Panel de 80W para sistema de energía solar | 0.019032 | 920,900 | 17,527 |
Inversor de voltaje 300W | 0.004758 | 297,050 | 1,413 |
Caja de control sistema de energía solar | 0.004758 | 1,018,750 | 4,847 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.019032 | 731,600 | 13,924 |
Tablero trifásico con puerta de 24 circuitos | 0.004758 | 321,000 | 1,527 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.019032 | 395,000 | 7,518 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.028548 | 492,210 | 14,052 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.038064 | 818,067 | 31,139 |
Acero G-60 x 1 Kg | 2.8548 | 5,200 | 14,845 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.066612 | 533,055 | 35,508 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.009516 | 858,441 | 8,169 |
Muro panel doble cara x 1 m2 | 1.156194 | 232,618 | 268,951 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 0.9516 | 90,690 | 86,301 |
Teja termoacustica x 1 m2, suministro e instalación | 1.084824 | 198,448 | 215,281 |
Guardaescoba en ceramica porcelanato x 1m | 0.409188 | 23,946 | 9,798 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 0.52338 | 178,966 | 93,667 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 0.0171288 | 1,574,907 | 26,976 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 0.07137 | 340,807 | 24,323 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1.61772 | 12,828 | 20,752 |
Geomembrana Instalación x 1 m2 | 0.57096 | 13,477 | 7,695 |
Cepillera Attica | 0.014274 | 28,850 | 412 |
Espejo de 2mm de espesor *1 m2 | 0.014274 | 93,700 | 1,337 |
Argolla toalla attica | 0.014274 | 36,250 | 517 |
División de baño corrediza | 0.014274 | 550,000 | 7,851 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 0.004758 | 505,085 | 2,403 |
Puerta de triplex | 0.038064 | 342,450 | 13,035 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.04758 | 140,813 | 6,700 |
Aseo general para entrega de obra x metro cuadrado | 0.994422 | 3,042 | 3,025 |
Administración | 79458.6 | 1 | 79,459 |
Imprevistos | 77079.6 | 1 | 77,080 |
Utilidad | 38539.8 | 1 | 38,540 |
Unidad Monetaria | 7393.4562 | 1 | 7,393 |
Valor Adicional: | 1,299,135 |
| $29,950 |
| $20,370,000 |
| $95,019 |
| $158,000 |
| $32,000,000 |
| $149,100 |
| $325,000 |
| $456,000 |
| $39,000,000 |
| $93,000 |
| $102,700 |
| $13,270,000 |
| $208,000 |
| $4,845,400 |
| $3,800,000 |
| $39,600 |
| $34,500 |
| $143,000 |
| $1,934,160 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00014968019 | 12,921,951,720 | 1,934,160 |
Terreno, predio, lote precio por 1m2 | 0.374200475 | 1,000,000 | 374,200 |
Levantamiento topográfico hasta 1,000 m2 | 0.00029936038 | 2,600,000 | 778 |
Replanteo Arquitectónico X 1 m2 | 1.22213875135 | 10,038 | 12,267 |
Diseño arquitectónico de edificios x 1 m2 | 1.22213875135 | 14,000 | 17,110 |
Estudio de suelos y geotecnia desde | 0.00059872076 | 4,147,000 | 2,483 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 1.22213875135 | 10,400 | 12,710 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.22213875135 | 13,520 | 16,523 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.22213875135 | 16,000 | 19,554 |
Excavación mecánica en conglomerado x 1 m3 | 1.09925131536 | 4,551 | 5,003 |
Piloteadora, alquiler por Hora | 0.0119744152 | 390,000 | 4,670 |
Acero G-60 x 1 Kg | 61.43383910246 | 5,200 | 319,456 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.31896848489 | 533,055 | 170,028 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.04984350327 | 858,441 | 42,788 |
Steel deck metaldeck grado 40 | 0.24442775027 | 451,000 | 110,237 |
Kit Mueble para baño + lavamanos | 0.0179616228 | 484,450 | 8,702 |
Punto agua fria PVC 1/2" | 0.1077697368 | 44,047 | 4,747 |
Tubo 1" x 6 m RDE 13.5 | 0.089808114 | 63,000 | 5,658 |
Sanitario suministro e instalación | 0.0179616228 | 1,077,612 | 19,356 |
Punto desagüe sanitario pvc 4" | 0.089808114 | 68,312 | 6,135 |
Caja de inspección y distribución | 0.0239488304 | 207,000 | 4,957 |
Tubería PVC sanitaria 4" | 0.059872076 | 156,100 | 9,346 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.0059872076 | 23,113 | 138 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.1975778508 | 23,313 | 4,606 |
Panel de 80W para sistema de energía solar | 0.0239488304 | 920,900 | 22,054 |
Inversor de voltaje 300W | 0.0059872076 | 297,050 | 1,779 |
Caja de control sistema de energía solar | 0.0059872076 | 1,018,750 | 6,099 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.0239488304 | 731,600 | 17,521 |
Tablero trifásico con puerta de 24 circuitos | 0.0059872076 | 321,000 | 1,922 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.0239488304 | 395,000 | 9,460 |
Muro drywall doble cara x 1 m2 | 0.7753433842 | 153,842 | 119,280 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 0.778336988 | 178,966 | 139,296 |
Ascensor 8 personas | 0.00029936038 | 99,900,000 | 29,906 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1.511769919 | 12,828 | 19,393 |
Geomembrana Instalación x 1 m2 | 0.44904057 | 13,477 | 6,052 |
Cepillera Attica | 0.014968019 | 28,850 | 432 |
Espejo de 2mm de espesor *1 m2 | 0.029936038 | 93,700 | 2,805 |
Argolla toalla attica | 0.014968019 | 36,250 | 543 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 1.8934544035 | 141,747 | 268,391 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0014968019 | 140,813 | 211 |
Administración | 47021.13360736 | 1 | 47,021 |
Imprevistos | 23521.34377736 | 1 | 23,521 |
Utilidad | 47021.13360736 | 1 | 47,021 |
Valor Adicional: | 1,934,160 |
| $260,000 |
| $5,200 |
| $25,843,903,440 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 5000 | 1,000,000 | 5,000,000,000 |
Valor Adicional: | 5,000,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 4 | 2,600,000 | 10,400,000 |
Salario mínimo mensual vigente, base | 8 | 1,300,000 | 10,400,000 |
Replanteo Arquitectónico X 1 m2 | 16330 | 10,038 | 163,914,754 |
Cuerda de Nylon 100 m x 0,50 mm | 816.5 | 50,900 | 41,559,850 |
Estaca de Madera Ø=0.05 L=0.60 m | 8165 | 6,100 | 49,806,500 |
| 163.3 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 267.812 | 24,504 | 6,562,569 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 2692.817 | 24,504 | 65,985,835 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 16330 | 14,000 | 228,620,000 |
Estudio de suelos y geotecnia desde | 8 | 4,147,000 | 33,176,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 24 | 650,000 | 15,600,000 |
Ensayo SPT | 8 | 247,000 | 1,976,000 |
Informe Geotécnico y recomendaciones de construcción | 8 | 1,950,000 | 15,600,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 16330 | 10,400 | 169,832,000 |
Salario mínimo mensual vigente, base | 130.64 | 1,300,000 | 169,832,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 16330 | 13,520 | 220,781,600 |
Diseño hidráulico de edificio x 1 m2 | 16330 | 6,760 | 110,390,800 |
Diseño sanitario de edificio x 1 m2, servicio | 16330 | 6,760 | 110,390,800 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 16330 | 16,000 | 261,280,000 |
Valor Adicional: | 1,088,004,354 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 14688 | 4,551 | 66,848,760 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 367.2 | 182,050 | 66,848,760 |
Piloteadora, alquiler por Hora | 160 | 390,000 | 62,400,000 |
Salario mínimo mensual vigente, base | 48 | 1,300,000 | 62,400,000 |
Valor Adicional: | 129,248,760 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 820868 | 5,200 | 4,268,513,600 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 4262 | 533,055 | 2,271,881,523 |
Arena lavada de río 1 m3 | 2506.056 | 95,019 | 238,122,935 |
Cemento 1 Kg | 1566285 | 798 | 1,249,895,430 |
Triturado de 3/4" x 1 m3 | 3759.084 | 150,500 | 565,742,153 |
Agua para la obra 1 litro | 850269 | 36 | 30,949,792 |
Mezcladora 1 bulto, alquiler x hora | 2045.76 | 7,150 | 14,627,184 |
Cuadrilla 7 (8 obreros) x jornal | 298.34 | 578,347 | 172,544,029 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 666 | 858,441 | 571,721,514 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 666 | 533,055 | 355,014,804 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 6.66 | 155,000 | 1,032,300 |
Durmiente ordinario 0,04x0.04x3,00 m. | 666 | 30,000 | 19,980,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 666 | 36,500 | 24,309,000 |
Vara clavo 3m | 113.22 | 20,100 | 2,275,722 |
Cuadrilla de albañileria x 1 Hora | 5994 | 24,504 | 146,879,308 |
Cuadrilla de albañileria x 1 Hora | 599.4 | 24,504 | 14,687,931 |
Vibrador eléctrico de aguja para concreto x hora | 999 | 7,550 | 7,542,450 |
Steel deck metaldeck grado 40 | 3266 | 451,000 | 1,472,966,000 |
Valor Adicional: | 8,585,082,638 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 240 | 484,450 | 116,268,000 |
Punto agua fria PVC 1/2" | 1440 | 44,047 | 63,426,966 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 288 | 20,300 | 5,846,400 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 72 | 30,700 | 2,210,400 |
Codo PVC 90° presión de 1/2" x 10 unidades | 144 | 45,000 | 6,480,000 |
Soldadura para PVC 1/4 de galón | 57.6 | 53,500 | 3,081,600 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 21.6 | 77,000 | 1,663,200 |
Instalación carpintería metálica x 1 m2 | 1919.52 | 20,907 | 40,132,151 |
Instalación carpintería metálica x 1 m2 | 191.952 | 20,907 | 4,013,215 |
Tubo 1" x 6 m RDE 13.5 | 1200 | 63,000 | 75,600,000 |
Valor Adicional: | 255,294,966 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 240 | 1,077,612 | 258,626,841 |
Sanitario One Piece Galio Blanco | 240 | 974,000 | 233,760,000 |
Instalación de aparatos sanitarios x unidad | 240 | 103,612 | 24,866,841 |
Punto desagüe sanitario pvc 4" | 1200 | 68,312 | 81,974,488 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 204 | 78,000 | 15,912,000 |
Cuadrilla de albañileria x 1 Hora | 2400 | 24,504 | 58,810,534 |
Limpiador para PVC 1/4 de galón | 45.12 | 99,000 | 4,466,880 |
Soldadura para PVC DE 1/4 de Galón | 37.56 | 74,150 | 2,785,074 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 320 | 207,000 | 66,240,000 |
Tubería PVC sanitaria 4" | 800 | 156,100 | 124,880,000 |
Valor Adicional: | 531,721,329 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 80 | 23,113 | 1,849,022 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 16 | 94,000 | 1,504,000 |
Cuadrilla de albañileria x 1 Hora | 12.8 | 24,504 | 313,656 |
Cuadrilla de albañileria x 1 Hora | 1.28 | 24,504 | 31,366 |
Interruptor sencillo cuatro vías. Suministro e instalación | 2640 | 23,313 | 61,545,719 |
Interruptor sencillo cuatro vías x 5 unidades | 528 | 95,000 | 50,160,000 |
Cuadrilla de albañileria x 1 Hora | 422.4 | 24,504 | 10,350,654 |
Cuadrilla de albañileria x 1 Hora | 42.24 | 24,504 | 1,035,065 |
Panel de 80W para sistema de energía solar | 320 | 920,900 | 294,688,000 |
Inversor de voltaje 300W | 80 | 297,050 | 23,764,000 |
Caja de control sistema de energía solar | 80 | 1,018,750 | 81,500,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 320 | 731,600 | 234,112,000 |
Tablero trifásico con puerta de 24 circuitos | 80 | 321,000 | 25,680,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 320 | 395,000 | 126,400,000 |
Valor Adicional: | 849,538,741 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 10360 | 153,842 | 1,593,798,955 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 7715.092 | 83,900 | 647,296,219 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 51.8 | 135,750 | 7,031,850 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 2797.2 | 32,100 | 89,790,120 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 8495.2 | 25,500 | 216,627,600 |
Cuadrilla de carpintería por hora | 862.988 | 38,130 | 32,905,318 |
Cuadrilla de carpintería por hora | 8632.988 | 38,130 | 329,171,689 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 51800 | 5,200 | 269,360,000 |
Transporte 1 tonelada x 1 kilómetro | 414.4 | 3,900 | 1,616,160 |
Valor Adicional: | 1,593,798,955 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 10400 | 178,966 | 1,861,249,128 |
Agua para la obra 1 litro | 36400 | 36 | 1,324,960 |
Pegacor max, 25 Kg, porcelanato | 2600 | 85,500 | 222,300,000 |
Porcelanato sellado Beige x 1 m2 | 10400 | 135,900 | 1,413,360,000 |
Cuadrilla de albañileria x 1 Hora | 8320 | 24,504 | 203,876,516 |
Cuadrilla de albañileria x 1 Hora | 832 | 24,504 | 20,387,652 |
Ascensor 8 personas | 4 | 99,900,000 | 399,600,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 20200 | 12,828 | 259,129,640 |
Intervinil 5 galones, vinilo tipo 2 | 202 | 230,000 | 46,460,000 |
Cuadrilla de pintura x 1 hora | 444.4 | 38,563 | 17,137,313 |
Cuadrilla de pintura x 1 hora | 4444 | 38,563 | 171,373,128 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4040 | 5,200 | 21,008,000 |
Transporte 1 tonelada x 1 kilómetro | 808 | 3,900 | 3,151,200 |
Geomembrana Instalación x 1 m2 | 6000 | 13,477 | 80,864,484 |
Cuadrilla de albañileria x 1 Hora | 300 | 24,504 | 7,351,317 |
Cuadrilla de albañileria x 1 Hora | 3000 | 24,504 | 73,513,167 |
Cepillera Attica | 200 | 28,850 | 5,770,000 |
Espejo de 2mm de espesor *1 m2 | 400 | 93,700 | 37,480,000 |
Argolla toalla attica | 200 | 36,250 | 7,250,000 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 25300 | 141,747 | 3,586,190,177 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 25300 | 130,000 | 3,289,000,000 |
Silicona transparente con fungicida 11 Onzas | 2302.3 | 39,050 | 89,904,815 |
Cuadrilla de albañileria x 1 Hora | 6325 | 24,504 | 154,990,260 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 9297.75 | 5,200 | 48,348,300 |
Transporte 1 tonelada x 1 kilómetro | 1012 | 3,900 | 3,946,800 |
Valor Adicional: | 6,237,533,429 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 20 | 140,813 | 2,816,268 |
Cascarilla de arroz x bulto 45 Kg | 5 | 155,000 | 775,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 1.5 | 91,000 | 136,500 |
Plántula aguacate | 20 | 33,250 | 665,000 |
Tierra negra abonada x 1 m3 | 4 | 235,000 | 940,000 |
Pala redonda No. 4 mango plástico | 0.1 | 63,000 | 6,300 |
Cuadrilla de instalaciones x 1 Hora | 10 | 26,955 | 269,548 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4 | 5,200 | 20,800 |
Transporte 1 tonelada x 1 kilómetro | 0.8 | 3,900 | 3,120 |
Valor Adicional: | 2,816,268 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 628288000 | 1 | 628,288,000 |
Valor Adicional: | 628,288,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 314288000 | 1 | 314,288,000 |
Valor Adicional: | 314,288,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 628288000 | 1 | 628,288,000 |
Valor Adicional: | 628,288,000 |
| $96,642,307 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 51.58 | 533,055 | 27,494,990 |
Arena lavada de río 1 m3 | 30.32904 | 95,019 | 2,881,835 |
Cemento 1 Kg | 18955.65 | 798 | 15,126,609 |
Triturado de 3/4" x 1 m3 | 45.49356 | 150,500 | 6,846,781 |
Agua para la obra 1 litro | 10290.21 | 36 | 374,564 |
Mezcladora 1 bulto, alquiler x hora | 24.7584 | 7,150 | 177,023 |
Cuadrilla 7 (8 obreros) x jornal | 3.6106 | 578,347 | 2,088,180 |
Acero G-60 x 1 Kg | 2170 | 5,200 | 11,284,000 |
Cuadrilla de albañileria x 1 Hora | 800 | 24,504 | 19,603,511 |
Oficial de construcción x hora | 800 | 15,397 | 12,317,250 |
Ayudante de construcción x 1 hora | 800 | 9,108 | 7,286,261 |
Valor Adicional: | 58,382,502 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 5 | 533,055 | 2,665,276 |
Arena lavada de río 1 m3 | 2.94 | 95,019 | 279,356 |
Cemento 1 Kg | 1837.5 | 798 | 1,466,325 |
Triturado de 3/4" x 1 m3 | 4.41 | 150,500 | 663,705 |
Agua para la obra 1 litro | 997.5 | 36 | 36,309 |
Mezcladora 1 bulto, alquiler x hora | 2.4 | 7,150 | 17,160 |
Cuadrilla 7 (8 obreros) x jornal | 0.35 | 578,347 | 202,421 |
Acero G-60 x 1 Kg | 1300 | 5,200 | 6,760,000 |
Valor Adicional: | 9,425,276 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| $96,000,000 |
| $97,500 |
| $81,350 |
| $416,000 |
| $97,500 |
| $338,000 |
| $184,900 |
| $5,950,000 |
| $2,391,250 |
| $105,300 |
| $33,400 |
| $96,500 |
| $124,020 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 23.85 | 5,200 | 124,020 |
Valor Adicional: | 124,020 |
| $83,900 |
| $35,050 |
| $22,700 |
| $135,750 |
| $79,150 |
| $2,098,750 |
| $30,000 |
| $97,500 |
| $85,900 |
| $44,047 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 0.2 | 20,300 | 4,060 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 0.05 | 30,700 | 1,535 |
Codo PVC 90° presión de 1/2" x 10 unidades | 0.1 | 45,000 | 4,500 |
Soldadura para PVC 1/4 de galón | 0.04 | 53,500 | 2,140 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.015 | 77,000 | 1,155 |
Valor Adicional: | 13,390 |
| $195,000 |
| $88,900 |
| $25,750 |
| $8,000,000 |
| $35,500 |
| $202,269,719 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 209 | 3,900 | 815,100 |
Salario mínimo mensual vigente, base | 0.627 | 1,300,000 | 815,100 |
Levantamiento topográfico hasta 1,000 m2 | 1 | 2,600,000 | 2,600,000 |
Salario mínimo mensual vigente, base | 2 | 1,300,000 | 2,600,000 |
Replanteo Arquitectónico X 1 m2 | 209 | 10,038 | 2,097,868 |
Cuerda de Nylon 100 m x 0,50 mm | 10.45 | 50,900 | 531,905 |
Estaca de Madera Ø=0.05 L=0.60 m | 104.5 | 6,100 | 637,450 |
| 2.09 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.4276 | 24,504 | 83,991 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 34.4641 | 24,504 | 844,522 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 209 | 28,597 | 5,976,802 |
Salario diario vigente | 137.94 | 43,329 | 5,976,802 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 1 | 11,001 | 11,001 |
Salario diario vigente | 0.2539 | 43,329 | 11,001 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 209 | 13,520 | 2,825,680 |
Diseño hidráulico de edificio x 1 m2 | 209 | 6,760 | 1,412,840 |
Diseño sanitario de edificio x 1 m2, servicio | 209 | 6,760 | 1,412,840 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 209 | 16,000 | 3,344,000 |
Valor Adicional: | 21,817,451 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 3 | 484,450 | 1,453,350 |
Punto agua fria PVC 1/2" | 18 | 44,047 | 792,837 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 3.6 | 20,300 | 73,080 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 0.9 | 30,700 | 27,630 |
Codo PVC 90° presión de 1/2" x 10 unidades | 1.8 | 45,000 | 81,000 |
Soldadura para PVC 1/4 de galón | 0.72 | 53,500 | 38,520 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.27 | 77,000 | 20,790 |
Instalación carpintería metálica x 1 m2 | 23.994 | 20,907 | 501,652 |
Instalación carpintería metálica x 1 m2 | 2.3994 | 20,907 | 50,165 |
Tubo 1" x 6 m RDE 13.5 | 15 | 63,000 | 945,000 |
Valor Adicional: | 3,191,187 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 3 | 1,077,612 | 3,232,836 |
Sanitario One Piece Galio Blanco | 3 | 974,000 | 2,922,000 |
Instalación de aparatos sanitarios x unidad | 3 | 103,612 | 310,836 |
Punto desagüe sanitario pvc 4" | 15 | 68,312 | 1,024,681 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 2.55 | 78,000 | 198,900 |
Cuadrilla de albañileria x 1 Hora | 30 | 24,504 | 735,132 |
Limpiador para PVC 1/4 de galón | 0.564 | 99,000 | 55,836 |
Soldadura para PVC DE 1/4 de Galón | 0.4695 | 74,150 | 34,813 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 4 | 207,000 | 828,000 |
Tubería PVC sanitaria 4" | 10 | 156,100 | 1,561,000 |
Valor Adicional: | 6,646,517 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 6 | 492,210 | 2,953,260 |
Agua para la obra 1 litro | 1074 | 36 | 39,094 |
Arena lavada de río 1 m3 | 4.536 | 95,019 | 431,006 |
Cemento 1 Kg | 1890 | 798 | 1,508,220 |
Triturado de 3/4" x 1 m3 | 4.536 | 150,500 | 682,668 |
Mezcladora 1 bulto, alquiler x hora | 6 | 7,150 | 42,900 |
Cuadrilla 7 (8 obreros) x jornal | 0.42 | 578,347 | 242,906 |
Oficial de construcción x hora | 0.42 | 15,397 | 6,467 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 8 | 818,067 | 6,544,537 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 8 | 533,055 | 4,264,442 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 23.68 | 13,000 | 307,840 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 1.2 | 155,000 | 186,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 2.88 | 10,000 | 28,800 |
| 10.48 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 65.2 | 24,504 | 1,597,686 |
Cuadrilla de albañileria x 1 Hora | 6.52 | 24,504 | 159,769 |
Acero G-60 x 1 Kg | 600 | 5,200 | 3,120,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 14 | 533,055 | 7,462,774 |
Arena lavada de río 1 m3 | 8.232 | 95,019 | 782,196 |
Cemento 1 Kg | 5145 | 798 | 4,105,710 |
Triturado de 3/4" x 1 m3 | 12.348 | 150,500 | 1,858,374 |
Agua para la obra 1 litro | 2793 | 36 | 101,665 |
Mezcladora 1 bulto, alquiler x hora | 6.72 | 7,150 | 48,048 |
Cuadrilla 7 (8 obreros) x jornal | 0.98 | 578,347 | 566,780 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 2 | 858,441 | 1,716,881 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 2 | 533,055 | 1,066,111 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.02 | 155,000 | 3,100 |
Durmiente ordinario 0,04x0.04x3,00 m. | 2 | 30,000 | 60,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 2 | 36,500 | 73,000 |
Vara clavo 3m | 0.34 | 20,100 | 6,834 |
Cuadrilla de albañileria x 1 Hora | 18 | 24,504 | 441,079 |
Cuadrilla de albañileria x 1 Hora | 1.8 | 24,504 | 44,108 |
Vibrador eléctrico de aguja para concreto x hora | 3 | 7,550 | 22,650 |
Valor Adicional: | 21,797,452 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 243 | 232,618 | 56,526,152 |
Sistema, Panel x 1 m2 x 0.04 m | 255.15 | 56,500 | 14,415,975 |
Malla plana RG2 | 97.2 | 5,350 | 520,020 |
Malla RGU 80 | 121.5 | 6,500 | 789,750 |
Malla angular RG1 | 121.5 | 6,700 | 814,050 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 13.365 | 473,449 | 6,327,648 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 62.694 | 31,013 | 1,944,316 |
Cuadrilla de instalaciones x 1 Hora | 36.6444 | 26,955 | 987,743 |
Cuadrilla de instalaciones x 1 Hora | 366.444 | 26,955 | 9,877,435 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 1215 | 5,200 | 6,318,000 |
Transporte 1 tonelada x 1 kilómetro | 9.72 | 3,900 | 37,908 |
Muro panel doble cara x 1 m2 | 24.3 | 232,618 | 5,652,615 |
Muro panel doble cara x 1 m2 | 24.3 | 232,618 | 5,652,615 |
Muro panel doble cara x 1 m2 | 12.15 | 232,618 | 2,826,308 |
Muro panel doble cara x 1 m2 | 1.5552 | 232,618 | 361,767 |
Valor Adicional: | 56,526,152 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 200 | 90,690 | 18,137,983 |
Acero G-60 x 1 Kg | 1980 | 5,200 | 10,296,000 |
Pintuco Anticorrosivo rojo | 36 | 95,000 | 3,420,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 24 | 34,650 | 831,600 |
Cuadrilla de albañileria x 1 Hora | 133.2 | 24,504 | 3,263,985 |
Cuadrilla de albañileria x 1 Hora | 13.32 | 24,504 | 326,398 |
Teja termoacustica x 1 m2, suministro e instalación | 228 | 198,448 | 45,246,209 |
Teja termoacústica 3 m x 0.78 m | 97.4472 | 393,120 | 38,308,443 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 47.4924 | 93,400 | 4,435,790 |
Andamio Tubular estandar con tijeras alquiler por día | 11.4 | 47,300 | 539,220 |
Cuadrilla de instalaciones x 1 Hora | 5.7 | 26,955 | 153,643 |
Cuadrilla de instalaciones x 1 Hora | 57 | 26,955 | 1,536,425 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 45.6 | 5,200 | 237,120 |
Transporte 1 tonelada x 1 kilómetro | 9.12 | 3,900 | 35,568 |
Valor Adicional: | 63,384,192 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 10 | 140,813 | 1,408,134 |
Cascarilla de arroz x bulto 45 Kg | 2.5 | 155,000 | 387,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 0.75 | 91,000 | 68,250 |
Plántula aguacate | 10 | 33,250 | 332,500 |
Tierra negra abonada x 1 m3 | 2 | 235,000 | 470,000 |
Pala redonda No. 4 mango plástico | 0.05 | 63,000 | 3,150 |
Cuadrilla de instalaciones x 1 Hora | 5 | 26,955 | 134,774 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2 | 5,200 | 10,400 |
Transporte 1 tonelada x 1 kilómetro | 0.4 | 3,900 | 1,560 |
Valor Adicional: | 1,408,134 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 12700000 | 1 | 12,700,000 |
Valor Adicional: | 12,700,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 6200000 | 1 | 6,200,000 |
Valor Adicional: | 6,200,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 6200000 | 1 | 6,200,000 |
Valor Adicional: | 6,200,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 1178000 | 1 | 1,178,000 |
Valor Adicional: | 1,178,000 |
| $108,900 |
| $31,850 |
| $465,000,000 |
| $195,290 |
| $73,950 |
| $100,000 |
| $490,000 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.