Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño hidráulico de edificio x 1 m2 | 1 | 6,760 | 6,760 |
Salario mínimo mensual vigente, base | 0.0052 | 1,300,000 | 6,760 |
Diseño sanitario de edificio x 1 m2, servicio | 1 | 6,760 | 6,760 |
Salario mínimo mensual vigente, base | 0.0052 | 1,300,000 | 6,760 |
Valor Adicional: | 13,520 |
| $85,000 |
| $2,222,775 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario diario vigente | 51.3 | 43,329 | 2,222,778 |
Salario mínimo mensual vigente, base | 1.709829 | 1,300,000 | 2,222,778 |
Valor Adicional: | 2,222,778 |
| $300,000 |
| $330,500 |
| $149,900 |
| $97,500 |
| $123,200 |
| $10,000 |
| $32,500 |
| $107,700 |
| $905,000 |
| $273,000 |
| $40,150 |
| $42,500 |
| $82,900 |
| $20,100 |
| $39,000 |
| $56,000 |
| $119,000 |
| $42,300 |
| $32,500 |
| $13,000 |
| $104,000 |
| $27,950 |
| $46,000 |
| $17,332 |
| $81,500 |
| $3,800,000 |
| $97,500 |
| $618,343,801 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 1 | 1,112,456 | 1,112,456 |
Hora de ingeniero | 30 | 37,082 | 1,112,456 |
Puente, diseño estructural x 1 m2 | 122 | 246,975 | 30,130,987 |
Salario diario vigente | 695.4 | 43,329 | 30,130,987 |
Valor Adicional: | 31,243,442 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-50 tipo perfil x 1 Kg | 35000 | 8,050 | 281,750,000 |
Soldador mano de obra x hora | 8750 | 16,640 | 145,600,000 |
Salario mínimo mensual vigente, base | 112 | 1,300,000 | 145,600,000 |
Valor Adicional: | 427,350,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 15 | 533,055 | 7,995,829 |
Arena lavada de río 1 m3 | 8.82 | 95,019 | 838,068 |
Cemento 1 Kg | 5512.5 | 798 | 4,398,975 |
Triturado de 3/4" x 1 m3 | 13.23 | 150,500 | 1,991,115 |
Agua para la obra 1 litro | 2992.5 | 36 | 108,927 |
Mezcladora 1 bulto, alquiler x hora | 7.2 | 7,150 | 51,480 |
Cuadrilla 7 (8 obreros) x jornal | 1.05 | 578,347 | 607,264 |
Acero G-60 x 1 Kg | 13000 | 5,200 | 67,600,000 |
Valor Adicional: | 75,595,829 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| $50,970,000 |
| $8,666 |
| $45,250 |
| $2,010,375,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño de pavimento por unidad homogénea de diseño, según cbr y tránsito | 3 | 3,900,000 | 11,700,000 |
Salario mínimo mensual vigente, base | 9 | 1,300,000 | 11,700,000 |
Valor Adicional: | 11,700,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Subbase triturada de 2" x 1 m3 | 2100 | 125,200 | 262,920,000 |
Base granular de 1 1/2" x m3 | 2100 | 126,550 | 265,755,000 |
Asfalto 60/70 por tonelada | 700 | 2,100,000 | 1,470,000,000 |
Valor Adicional: | 1,998,675,000 |
| $49,050 |
| $0 |
| $235,200 |
| $151,550 |
| $0 |
| $35,700 |
| $61,880 |
| $777,400 |
| $23,500 |
| $121,400 |
| $50,000 |
| $595,023 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.6 | 95,019 | 57,011 |
Arena lavada de río 6 m3 | 0.10002 | 570,000 | 57,011 |
Cemento 1 Kg | 500 | 798 | 399,000 |
Cemento, bulto de 50 Kg | 10 | 39,900 | 399,000 |
Triturado de 3/4" x 1 m3 | 0.6 | 150,500 | 90,300 |
Grava 3/4" x 6 m3 | 0.100000002 | 903,000 | 90,300 |
Valor Adicional: | 546,311 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cuadrilla 7 (8 obreros) x jornal | 0.07 | 578,347 | 40,484 |
Salario mínimo mensual vigente, incluyendo complementos | 0.018669 | 2,168,530 | 40,484 |
Oficial de construcción x hora | 0.07 | 15,397 | 1,078 |
Salario mínimo mensual vigente, incluyendo complementos | 0.000497 | 2,168,530 | 1,078 |
Valor Adicional: | 41,562 |
| $305,350 |
| $578,347 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 0.2667 | 2,168,530 | 578,347 |
Salario mínimo mensual vigente, base | 0.2667 | 1,300,000 | 346,710 |
Salario mínimo mensual vigente, base | 0.03323082 | 1,300,000 | 43,200 |
Salario mínimo mensual vigente, base | 0.032004 | 1,300,000 | 41,605 |
Salario mínimo mensual vigente, base | 0.0226695 | 1,300,000 | 29,470 |
Salario mínimo mensual vigente, base | 0.024003 | 1,300,000 | 31,204 |
Salario mínimo mensual vigente, base | 0.02221611 | 1,300,000 | 28,881 |
Salario mínimo mensual vigente, base | 0.002667 | 1,300,000 | 3,467 |
Salario mínimo mensual vigente, base | 0.00138684 | 1,300,000 | 1,803 |
Salario mínimo mensual vigente, base | 0.02221611 | 1,300,000 | 28,881 |
Salario mínimo mensual vigente, base | 0.01112139 | 1,300,000 | 14,458 |
Salario mínimo mensual vigente, base | 0.0066675 | 1,300,000 | 8,668 |
Valor Adicional: | 578,347 |
| $95,144,000 |
| $31,600 |
| $1,952,000 |
| $105,300 |
| $99,000 |
| $64,994 |
| $22,700 |
| $75,000 |
| $268,700 |
| $1,287,000 |
| $226,000 |
| $563,839 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.6 | 95,019 | 57,011 |
Arena lavada de río 6 m3 | 0.10002 | 570,000 | 57,011 |
Cemento 1 Kg | 420 | 798 | 335,160 |
Cemento, bulto de 50 Kg | 8.4 | 39,900 | 335,160 |
Triturado de 3/4" x 1 m3 | 0.6 | 150,500 | 90,300 |
Grava 3/4" x 6 m3 | 0.100000002 | 903,000 | 90,300 |
Valor Adicional: | 482,471 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cuadrilla 7 (8 obreros) x jornal | 0.125 | 578,347 | 72,293 |
Salario mínimo mensual vigente, incluyendo complementos | 0.0333375 | 2,168,530 | 72,293 |
Oficial de construcción x hora | 0.125 | 15,397 | 1,925 |
Salario mínimo mensual vigente, incluyendo complementos | 0.0008875 | 2,168,530 | 1,925 |
Valor Adicional: | 74,218 |
| $338,000 |
| $54,900 |
| $295,000 |
| $781,000 |
| $104,000 |
| $374,500 |
| $43,329 |
| $1,235,000 |
| $97,500 |
| $325,000 |
| $537,400 |
| $576,000 |
| $4,147,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Salario mínimo mensual vigente, base | 1.5 | 1,300,000 | 1,950,000 |
Valor Adicional: | 1,950,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Salario mínimo mensual vigente, base | 1.5 | 1,300,000 | 1,950,000 |
Valor Adicional: | 1,950,000 |
| $380,000 |
| $220,050 |
| $91,000 |
| $99,900 |
| $8,050 |
| $955,000 |
| $102,500 |
| $97,500 |
| $261,100 |
| $4,551 |
| $88,600 |
| $455,360 |
| $1,179,880 |
| $102,700 |
| $91,000 |
| $260,000 |
| $105,300 |
| $111,800 |
| $6,760 |
| $79,150 |
| $174,000 |
| $1,933,961 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00014968019 | 12,920,619,720 | 1,933,961 |
Terreno, predio, lote precio por 1m2 | 0.374200475 | 1,000,000 | 374,200 |
Levantamiento topográfico hasta 1,000 m2 | 0.00029936038 | 2,600,000 | 778 |
Replanteo Arquitectónico X 1 m2 | 1.22213875135 | 10,038 | 12,267 |
Diseño arquitectónico de edificios x 1 m2 | 1.22213875135 | 14,000 | 17,110 |
Estudio de suelos y geotecnia desde | 0.00059872076 | 4,147,000 | 2,483 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 1.22213875135 | 10,400 | 12,710 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.22213875135 | 13,520 | 16,523 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.22213875135 | 16,000 | 19,554 |
Excavación mecánica en conglomerado x 1 m3 | 1.09925131536 | 4,551 | 5,003 |
Piloteadora, alquiler por Hora | 0.0119744152 | 390,000 | 4,670 |
Acero G-60 x 1 Kg | 61.43383910246 | 5,200 | 319,456 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.31896848489 | 533,055 | 170,028 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.04984350327 | 854,441 | 42,588 |
Steel deck metaldeck grado 40 | 0.24442775027 | 451,000 | 110,237 |
Kit Mueble para baño + lavamanos | 0.0179616228 | 484,450 | 8,702 |
Punto agua fria PVC 1/2" | 0.1077697368 | 44,047 | 4,747 |
Tubo 1" x 6 m RDE 13.5 | 0.089808114 | 63,000 | 5,658 |
Sanitario suministro e instalación | 0.0179616228 | 1,077,612 | 19,356 |
Punto desagüe sanitario pvc 4" | 0.089808114 | 68,312 | 6,135 |
Caja de inspección y distribución | 0.0239488304 | 207,000 | 4,957 |
Tubería PVC sanitaria 4" | 0.059872076 | 156,100 | 9,346 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.0059872076 | 23,113 | 138 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.1975778508 | 23,313 | 4,606 |
Panel de 80W para sistema de energía solar | 0.0239488304 | 920,900 | 22,054 |
Inversor de voltaje 300W | 0.0059872076 | 297,050 | 1,779 |
Caja de control sistema de energía solar | 0.0059872076 | 1,018,750 | 6,099 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.0239488304 | 731,600 | 17,521 |
Tablero trifásico con puerta de 24 circuitos | 0.0059872076 | 321,000 | 1,922 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.0239488304 | 395,000 | 9,460 |
Muro drywall doble cara x 1 m2 | 0.7753433842 | 153,842 | 119,280 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 0.778336988 | 178,966 | 139,296 |
Ascensor 8 personas | 0.00029936038 | 99,900,000 | 29,906 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1.511769919 | 12,828 | 19,393 |
Geomembrana Instalación x 1 m2 | 0.44904057 | 13,477 | 6,052 |
Cepillera Attica | 0.014968019 | 28,850 | 432 |
Espejo de 2mm de espesor *1 m2 | 0.029936038 | 93,700 | 2,805 |
Argolla toalla attica | 0.014968019 | 36,250 | 543 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 1.8934544035 | 141,747 | 268,391 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0014968019 | 140,813 | 211 |
Administración | 47021.13360736 | 1 | 47,021 |
Imprevistos | 23521.34377736 | 1 | 23,521 |
Utilidad | 47021.13360736 | 1 | 47,021 |
Valor Adicional: | 1,933,961 |
| $82,200 |
| $26,955 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Oficial de construcción x hora | 1.1 | 15,397 | 16,936 |
Salario mínimo mensual vigente, incluyendo complementos | 0.00781 | 2,168,530 | 16,936 |
Ayudante de construcción x 1 hora | 1.1 | 9,108 | 10,019 |
Salario mínimo mensual vigente, incluyendo complementos | 0.00462 | 2,168,530 | 10,019 |
Valor Adicional: | 26,955 |
| $195,000 |
| $9,108 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 0.0042 | 2,168,530 | 9,108 |
Salario mínimo mensual vigente, base | 0.0042 | 1,300,000 | 5,460 |
Salario mínimo mensual vigente, base | 0.00052332 | 1,300,000 | 680 |
Salario mínimo mensual vigente, base | 0.000504 | 1,300,000 | 655 |
Salario mínimo mensual vigente, base | 0.000357 | 1,300,000 | 464 |
Salario mínimo mensual vigente, base | 0.000378 | 1,300,000 | 491 |
Salario mínimo mensual vigente, base | 0.00034986 | 1,300,000 | 455 |
Salario mínimo mensual vigente, base | 4.2E-5 | 1,300,000 | 55 |
Salario mínimo mensual vigente, base | 2.184E-5 | 1,300,000 | 28 |
Salario mínimo mensual vigente, base | 0.00034986 | 1,300,000 | 455 |
Salario mínimo mensual vigente, base | 0.00017514 | 1,300,000 | 228 |
Salario mínimo mensual vigente, base | 0.000105 | 1,300,000 | 137 |
Valor Adicional: | 9,108 |
| $95,500 |
| $97,500 |
| $104,000 |
| $246,100 |
| $50,000 |
| $105,300 |
| $135,750 |
| $29,950 |
| $35,050 |
| $5,043 |
| $228,000 |
| $110,063,000 |
| $476,619 |
| $28,400 |
| $35,650 |
| $108,900 |
| $43,400 |
| $67,593 |
| $6,550,000 |
| $145,000 |
| $146,000 |
| $182,000 |
| $86,658 |
| $52,900 |
| $199,450 |
| $293,000 |
| $87,000 |
| $87,000 |
| $35,500 |
| $176,200 |
| $33,450 |
| $138,000 |
| $409,500 |
| $86,658 |
| $23,313 |
| $24,800 |
| $32,200 |
| $16,000 |
| $99,000 |
| $29,700 |
| $43,350 |
| $62,400 |
| $3,900,000 |
| $68,150 |
| $33,400 |
| $96,500 |
| $29,450 |
| $2,119,000 |
| $35,200 |
| $86,658 |
| $28,850 |
| $84,000 |
| $86,658 |
| $49,900 |
| $127,900 |
| $36,650 |
| $26,450 |
| $35,900 |
| $4,680,000 |
| $1,200,000 |
| $39,400 |
| $140,850 |
| $42,250 |
| $584,000 |
| $289,800 |
| $86,658 |
| $33,300 |
| $50,200 |
| $25,250 |
| $85,000 |
| $34,250 |
| $36,500 |
| $139,848 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ladrillo Rejilla | 68 | 1,550 | 105,400 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.02 | 473,449 | 9,469 |
Arena lavada de río 1 m3 | 0.0256 | 95,019 | 2,432 |
Cemento 1 Kg | 7.64 | 798 | 6,097 |
Agua para la obra 1 litro | 4.8 | 36 | 175 |
Ayudante de construcción x 1 hora | 0.004 | 9,108 | 36 |
Ayudante de construcción x 1 hora | 0.08 | 9,108 | 729 |
Valor Adicional: | 114,869 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.3675 | 5,200 | 1,911 |
Salario mínimo mensual vigente, base | 0.00147 | 1,300,000 | 1,911 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 2,067 |
| $91,450 |
| $30,600 |
| $34,150 |
| $0 |
| $86,658 |
| $1,447,300 |
| $26,750 |
| $241,000 |
| $39,600 |
| $13,000 |
| $99,000 |
| $47,000 |
| $123,500,000 |
| $187,800 |
| $1,418,000 |
| $55,550 |
| $143,300 |
| $5,561,000 |
| $617,231,345 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-50 tipo perfil x 1 Kg | 35000 | 8,050 | 281,750,000 |
Soldador mano de obra x hora | 8750 | 16,640 | 145,600,000 |
Salario mínimo mensual vigente, base | 112 | 1,300,000 | 145,600,000 |
Valor Adicional: | 427,350,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 15 | 533,055 | 7,995,829 |
Arena lavada de río 1 m3 | 8.82 | 95,019 | 838,068 |
Cemento 1 Kg | 5512.5 | 798 | 4,398,975 |
Triturado de 3/4" x 1 m3 | 13.23 | 150,500 | 1,991,115 |
Agua para la obra 1 litro | 2992.5 | 36 | 108,927 |
Mezcladora 1 bulto, alquiler x hora | 7.2 | 7,150 | 51,480 |
Cuadrilla 7 (8 obreros) x jornal | 1.05 | 578,347 | 607,264 |
Acero G-60 x 1 Kg | 13000 | 5,200 | 67,600,000 |
Valor Adicional: | 75,595,829 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| $36,000 |
| $140,800 |
| $89,600 |
| $35,800 |
| $37,700 |
| $55,450 |
| $37,950 |
| $3,653,501 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario diario vigente | 84 | 43,329 | 3,639,636 |
Salario mínimo mensual vigente, base | 2.79972 | 1,300,000 | 3,639,636 |
Valor Adicional: | 3,639,636 |
| $49,900 |
| $86,658 |
| $404,000 |
| $77,000 |
| $50,500 |
| $110,900 |
| $51,600 |
| $36,500 |
| $1,014 |
| $73,000 |
| $46,650 |
| $3,946,500 |
| $86,658 |
| $223,000 |
| $95,000 |
| $45,750 |
| $24,800 |
| $45,300 |
| $57,950 |
| $256,000 |
| $40,600 |
| $62,050 |
| $50,000 |
| $49,000 |
| $34,509 |
| $86,658 |
| $90,300 |
| $23,113 |
| $990,000 |