| USD$8.98 |
| USD$46.41 |
| USD$77.37 |
| USD$28,066.07 |
| USD$7.19 |
| USD$11.81 |
| USD$10.84 |
| USD$70.18 |
| USD$112.58 |
| USD$425.47 |
| USD$105.75 |
| USD$7.19 |
| USD$12.93 |
| USD$10.63 |
| USD$15.80 |
| USD$7.19 |
| USD$724.58 |
| USD$7.19 |
| USD$5.05 |
| USD$81.37 |
| USD$297.90 |
| USD$7.83 |
| USD$7.19 |
| USD$30.75 |
| USD$33.66 |
| USD$18.87 |
| USD$135.94 |
| USD$512,645.63 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño de pavimento por unidad homogénea de diseño, según cbr y tránsito | 3 | 3,900,000 | 11,700,000 |
Salario mínimo mensual vigente, base | 9 | 1,300,000 | 11,700,000 |
Valor Adicional: | 11,700,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Subbase triturada de 2" x 1 m3 | 2100 | 125,200 | 262,920,000 |
Base granular de 1 1/2" x m3 | 2100 | 126,550 | 265,755,000 |
Asfalto 60/70 por tonelada | 700 | 2,100,000 | 1,470,000,000 |
Valor Adicional: | 1,998,675,000 |
| USD$13.01 |
| USD$9.80 |
| USD$112.31 |
| USD$36.80 |
| USD$26.16 |
| USD$0.00 |
| USD$57.63 |
| USD$14.73 |
| USD$253,146.21 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 1 | 1,199,995 | 1,199,995 |
Hora de ingeniero | 32.3607 | 37,082 | 1,199,995 |
Puente, diseño estructural x 1 m2 | 122 | 246,975 | 30,130,987 |
Salario diario vigente | 695.4 | 43,329 | 30,130,987 |
Valor Adicional: | 31,330,982 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero galvanizado G-50 tipo perfil x 1 Kg | 48600 | 13,181 | 640,596,600 |
Soldador mano de obra x hora | 8750 | 16,640 | 145,600,000 |
Salario mínimo mensual vigente, base | 112 | 1,300,000 | 145,600,000 |
Valor Adicional: | 786,196,600 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 15 | 533,055 | 7,995,829 |
Arena lavada de río 1 m3 | 8.82 | 95,019 | 838,068 |
Cemento 1 Kg | 5512.5 | 798 | 4,398,975 |
Triturado de 3/4" x 1 m3 | 13.23 | 150,500 | 1,991,115 |
Agua para la obra 1 litro | 2992.5 | 36 | 108,927 |
Mezcladora 1 bulto, alquiler x hora | 7.2 | 7,150 | 51,480 |
Cuadrilla 7 (8 obreros) x jornal | 1.05 | 578,347 | 607,264 |
Acero G-60 x 1 Kg | 13000 | 5,200 | 67,600,000 |
Valor Adicional: | 75,595,829 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 500 | 10,038 | 5,018,823 |
Cuerda de Nylon 100 m x 0,50 mm | 25 | 50,900 | 1,272,500 |
Estaca de Madera Ø=0.05 L=0.60 m | 250 | 6,100 | 1,525,000 |
| 5 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 8.2 | 24,504 | 200,936 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 82.45 | 24,504 | 2,020,387 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 4 | 4,147,000 | 16,588,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 12 | 650,000 | 7,800,000 |
Ensayo SPT | 4 | 247,000 | 988,000 |
Informe Geotécnico y recomendaciones de construcción | 4 | 1,950,000 | 7,800,000 |
Valor Adicional: | 21,606,823 |
| USD$16.45 |
| USD$53.93 |
| USD$12.37 |
| USD$35.14 |
| USD$198.24 |
| USD$19.89 |
| USD$26.52 |
| USD$9.13 |
| USD$52.79 |
| USD$53.75 |
| USD$145.86 |
| USD$10.22 |
| USD$175.73 |
| USD$7.14 |
| USD$33.15 |
| USD$6.02 |
| USD$8.42 |
| USD$9.72 |
| USD$148.54 |
| USD$26.52 |
| USD$7.37 |
| USD$38.99 |
| USD$29.38 |
| USD$7.28 |
| USD$91.09 |
| USD$376.09 |
| USD$30.35 |
| USD$19.89 |
| USD$171.36 |
| USD$223.01 |
| USD$12.75 |
| USD$165.75 |
| USD$743.33 |
| USD$7.64 |
| USD$6.63 |
| USD$14.93 |
| USD$21.17 |
| USD$1,017.45 |
| USD$11.05 |
| USD$8.80 |
| USD$27.77 |
| USD$552.84 |
| USD$343.36 |
| USD$23.03 |
| USD$36.54 |
| USD$4,386.00 |
| USD$22.82 |
| USD$66.30 |
| USD$99.45 |
| USD$37.22 |
| USD$12.38 |
| USD$50.75 |
| USD$250.03 |
| USD$51.51 |
| USD$104.55 |
| USD$28.10 |
| USD$3.32 |
| USD$28.28 |
| USD$6.96 |
| USD$12.67 |
| USD$9.58 |
| USD$66.30 |
| USD$17.38 |
| USD$22.58 |
| USD$8.84 |
| USD$13.26 |
| USD$147.48 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 0.2667 | 2,168,530 | 578,347 |
Salario mínimo mensual vigente, base | 0.2667 | 1,300,000 | 346,710 |
Salario mínimo mensual vigente, base | 0.03323082 | 1,300,000 | 43,200 |
Salario mínimo mensual vigente, base | 0.032004 | 1,300,000 | 41,605 |
Salario mínimo mensual vigente, base | 0.0226695 | 1,300,000 | 29,470 |
Salario mínimo mensual vigente, base | 0.024003 | 1,300,000 | 31,204 |
Salario mínimo mensual vigente, base | 0.02221611 | 1,300,000 | 28,881 |
Salario mínimo mensual vigente, base | 0.002667 | 1,300,000 | 3,467 |
Salario mínimo mensual vigente, base | 0.00138684 | 1,300,000 | 1,803 |
Salario mínimo mensual vigente, base | 0.02221611 | 1,300,000 | 28,881 |
Salario mínimo mensual vigente, base | 0.01112139 | 1,300,000 | 14,458 |
Salario mínimo mensual vigente, base | 0.0066675 | 1,300,000 | 8,668 |
Valor Adicional: | 578,347 |
| USD$187.43 |
| USD$22.67 |
| USD$0.00 |
| USD$51.00 |
| USD$14.00 |
| USD$45.52 |
| USD$22.66 |
| USD$6.89 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.4 | 5,200 | 2,080 |
Salario mínimo mensual vigente, base | 0.0016 | 1,300,000 | 2,080 |
Transporte 1 tonelada x 1 kilómetro | 0.4 | 3,900 | 1,560 |
Salario mínimo mensual vigente, base | 0.0012 | 1,300,000 | 1,560 |
Valor Adicional: | 3,640 |
| USD$3.93 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 0.0071 | 2,168,530 | 15,397 |
Salario mínimo mensual vigente, base | 0.0071 | 1,300,000 | 9,230 |
Salario mínimo mensual vigente, base | 0.00088466 | 1,300,000 | 1,150 |
Salario mínimo mensual vigente, base | 0.000852 | 1,300,000 | 1,108 |
Salario mínimo mensual vigente, base | 0.0006035 | 1,300,000 | 785 |
Salario mínimo mensual vigente, base | 0.000639 | 1,300,000 | 831 |
Salario mínimo mensual vigente, base | 0.00059143 | 1,300,000 | 769 |
Salario mínimo mensual vigente, base | 7.1E-5 | 1,300,000 | 92 |
Salario mínimo mensual vigente, base | 3.692E-5 | 1,300,000 | 48 |
Salario mínimo mensual vigente, base | 0.00059143 | 1,300,000 | 769 |
Salario mínimo mensual vigente, base | 0.00029607 | 1,300,000 | 385 |
Salario mínimo mensual vigente, base | 0.0001775 | 1,300,000 | 231 |
Valor Adicional: | 15,397 |
| USD$20.18 |
| USD$552.44 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario diario vigente | 50 | 43,329 | 2,166,450 |
Salario mínimo mensual vigente, base | 1.6665 | 1,300,000 | 2,166,450 |
Valor Adicional: | 2,166,450 |
| USD$552.98 |
| USD$46.41 |
| USD$5.79 |
| USD$34.62 |
| USD$16.15 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 0.0292 | 2,168,530 | 63,321 |
Salario mínimo mensual vigente, base | 0.0292 | 1,300,000 | 37,960 |
Salario mínimo mensual vigente, base | 0.00363832 | 1,300,000 | 4,730 |
Salario mínimo mensual vigente, base | 0.003504 | 1,300,000 | 4,555 |
Salario mínimo mensual vigente, base | 0.002482 | 1,300,000 | 3,227 |
Salario mínimo mensual vigente, base | 0.002628 | 1,300,000 | 3,416 |
Salario mínimo mensual vigente, base | 0.00243236 | 1,300,000 | 3,162 |
Salario mínimo mensual vigente, base | 0.000292 | 1,300,000 | 380 |
Salario mínimo mensual vigente, base | 0.00015184 | 1,300,000 | 197 |
Salario mínimo mensual vigente, base | 0.00243236 | 1,300,000 | 3,162 |
Salario mínimo mensual vigente, base | 0.00121764 | 1,300,000 | 1,583 |
Salario mínimo mensual vigente, base | 0.00073 | 1,300,000 | 949 |
Valor Adicional: | 63,321 |
| USD$11.67 |
| USD$68.60 |
| USD$22.95 |
| USD$331.50 |
| USD$21.55 |
| USD$23.45 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 0.02 | 135,750 | 2,715 |
| 0.34 | 0 | 0 |
Vinilo , Viniltex 5 galones | 0.01 | 364,000 | 3,640 |
Angulo 6m x 25 mm x 2.5mm | 0.42 | 22,700 | 9,534 |
Vigueta 1-1/2" x 3/4" x 0.38 mm x 2.44 m | 0.65 | 4,550 | 2,958 |
Valor Adicional: | 18,847 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.3675 | 5,200 | 1,911 |
Salario mínimo mensual vigente, base | 0.00147 | 1,300,000 | 1,911 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 2,067 |
| USD$24.99 |
| USD$8.30 |
| USD$7.19 |
| USD$13.26 |
| USD$13.49 |
| USD$3,870.83 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 7 | 2,168,530 | 15,179,710 |
Salario mínimo mensual vigente, base | 7 | 1,300,000 | 9,100,000 |
Salario mínimo mensual vigente, base | 0.8722 | 1,300,000 | 1,133,860 |
Salario mínimo mensual vigente, base | 0.84 | 1,300,000 | 1,092,000 |
Salario mínimo mensual vigente, base | 0.595 | 1,300,000 | 773,500 |
Salario mínimo mensual vigente, base | 0.63 | 1,300,000 | 819,000 |
Salario mínimo mensual vigente, base | 0.5831 | 1,300,000 | 758,030 |
Salario mínimo mensual vigente, base | 0.07 | 1,300,000 | 91,000 |
Salario mínimo mensual vigente, base | 0.0364 | 1,300,000 | 47,320 |
Salario mínimo mensual vigente, base | 0.5831 | 1,300,000 | 758,030 |
Salario mínimo mensual vigente, base | 0.2919 | 1,300,000 | 379,470 |
Salario mínimo mensual vigente, base | 0.175 | 1,300,000 | 227,500 |
Valor Adicional: | 15,179,710 |
| USD$28.82 |
| USD$10.24 |
| USD$38.22 |
| USD$35.66 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ladrillo Rejilla | 68 | 1,550 | 105,400 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.02 | 473,449 | 9,469 |
Arena lavada de río 1 m3 | 0.0256 | 95,019 | 2,432 |
Cemento 1 Kg | 7.64 | 798 | 6,097 |
Agua para la obra 1 litro | 4.8 | 36 | 175 |
Ayudante de construcción x 1 hora | 0.004 | 9,108 | 36 |
Ayudante de construcción x 1 hora | 0.08 | 9,108 | 729 |
Valor Adicional: | 114,869 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.3675 | 5,200 | 1,911 |
Salario mínimo mensual vigente, base | 0.00147 | 1,300,000 | 1,911 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 2,067 |
| USD$12.93 |
| USD$22.41 |
| USD$59.32 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sistema, Panel x 1 m2 x 0.04 m | 1.05 | 56,500 | 59,325 |
Malla plana RG2 | 0.4 | 5,350 | 2,140 |
Malla RGU 80 | 0.5 | 6,500 | 3,250 |
Malla angular RG1 | 0.5 | 6,700 | 3,350 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.055 | 473,449 | 26,040 |
Arena lavada de río 1 m3 | 0.0704 | 95,019 | 6,689 |
Cemento 1 Kg | 21.01 | 798 | 16,766 |
Agua para la obra 1 litro | 13.2 | 36 | 480 |
Ayudante de construcción x 1 hora | 0.011 | 9,108 | 100 |
Ayudante de construcción x 1 hora | 0.22 | 9,108 | 2,004 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.258 | 31,013 | 8,001 |
Acero G-60 x 1 Kg | 1.538712 | 5,200 | 8,001 |
Valor Adicional: | 102,106 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 5 | 5,200 | 26,000 |
Salario mínimo mensual vigente, base | 0.02 | 1,300,000 | 26,000 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 26,156 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.1 | 232,618 | 23,262 |
Sistema, Panel x 1 m2 x 0.04 m | 0.105 | 56,500 | 5,933 |
Malla plana RG2 | 0.04 | 5,350 | 214 |
Malla RGU 80 | 0.05 | 6,500 | 325 |
Malla angular RG1 | 0.05 | 6,700 | 335 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.0055 | 473,449 | 2,604 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0258 | 31,013 | 800 |
Cuadrilla de instalaciones x 1 Hora | 0.01508 | 26,955 | 406 |
Cuadrilla de instalaciones x 1 Hora | 0.1508 | 26,955 | 4,065 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.5 | 5,200 | 2,600 |
Transporte 1 tonelada x 1 kilómetro | 0.004 | 3,900 | 16 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Valor Adicional: | 23,262 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.1 | 232,618 | 23,262 |
Sistema, Panel x 1 m2 x 0.04 m | 0.105 | 56,500 | 5,933 |
Malla plana RG2 | 0.04 | 5,350 | 214 |
Malla RGU 80 | 0.05 | 6,500 | 325 |
Malla angular RG1 | 0.05 | 6,700 | 335 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.0055 | 473,449 | 2,604 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0258 | 31,013 | 800 |
Cuadrilla de instalaciones x 1 Hora | 0.01508 | 26,955 | 406 |
Cuadrilla de instalaciones x 1 Hora | 0.1508 | 26,955 | 4,065 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.5 | 5,200 | 2,600 |
Transporte 1 tonelada x 1 kilómetro | 0.004 | 3,900 | 16 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Valor Adicional: | 23,262 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.05 | 232,618 | 11,631 |
Sistema, Panel x 1 m2 x 0.04 m | 0.0525 | 56,500 | 2,966 |
Malla plana RG2 | 0.02 | 5,350 | 107 |
Malla RGU 80 | 0.025 | 6,500 | 163 |
Malla angular RG1 | 0.025 | 6,700 | 168 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.00275 | 473,449 | 1,302 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0129 | 31,013 | 400 |
Cuadrilla de instalaciones x 1 Hora | 0.00754 | 26,955 | 203 |
Cuadrilla de instalaciones x 1 Hora | 0.0754 | 26,955 | 2,032 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.25 | 5,200 | 1,300 |
Transporte 1 tonelada x 1 kilómetro | 0.002 | 3,900 | 8 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.0025 | 232,618 | 582 |
Muro panel doble cara x 1 m2 | 0.00032 | 232,618 | 74 |
Valor Adicional: | 11,631 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.0064 | 232,618 | 1,489 |
Sistema, Panel x 1 m2 x 0.04 m | 0.00672 | 56,500 | 380 |
Malla plana RG2 | 0.00256 | 5,350 | 14 |
Malla RGU 80 | 0.0032 | 6,500 | 21 |
Malla angular RG1 | 0.0032 | 6,700 | 21 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.000352 | 473,449 | 167 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0016512 | 31,013 | 51 |
Cuadrilla de instalaciones x 1 Hora | 0.00096512 | 26,955 | 26 |
Cuadrilla de instalaciones x 1 Hora | 0.0096512 | 26,955 | 260 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.032 | 5,200 | 166 |
Transporte 1 tonelada x 1 kilómetro | 0.000256 | 3,900 | 1 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Muro panel doble cara x 1 m2 | 0.00032 | 232,618 | 74 |
Muro panel doble cara x 1 m2 | 4.096E-5 | 232,618 | 10 |
Valor Adicional: | 1,489 |
| USD$21.14 |
| USD$32.00 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.