| $83,900 |
| $560,000 |
| $269,000 |
| $190,000 |
| $550,000 |
| $400,000 |
| $220,000 |
| $269,000 |
| $750,000 |
| $423,000 |
| $25,000 |
| $650,000 |
| $223,500 |
| $85,900 |
| $30,000 |
| $51,200 |
| $330,000 |
| $65,400 |
| $32,900 |
| $53,600 |
| $39,450 |
| $16,550 |
| $41,900 |
| $86,200 |
| $618,343,801 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 1 | 1,112,456 | 1,112,456 |
Hora de ingeniero | 30 | 37,082 | 1,112,456 |
Puente, diseño estructural x 1 m2 | 122 | 246,975 | 30,130,987 |
Salario diario vigente | 695.4 | 43,329 | 30,130,987 |
Valor Adicional: | 31,243,442 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-50 tipo perfil x 1 Kg | 35000 | 8,050 | 281,750,000 |
Soldador mano de obra x hora | 8750 | 16,640 | 145,600,000 |
Salario mínimo mensual vigente, base | 112 | 1,300,000 | 145,600,000 |
Valor Adicional: | 427,350,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 15 | 533,055 | 7,995,829 |
Arena lavada de río 1 m3 | 8.82 | 95,019 | 838,068 |
Cemento 1 Kg | 5512.5 | 798 | 4,398,975 |
Triturado de 3/4" x 1 m3 | 13.23 | 150,500 | 1,991,115 |
Agua para la obra 1 litro | 2992.5 | 36 | 108,927 |
Mezcladora 1 bulto, alquiler x hora | 7.2 | 7,150 | 51,480 |
Cuadrilla 7 (8 obreros) x jornal | 1.05 | 578,347 | 607,264 |
Acero G-60 x 1 Kg | 13000 | 5,200 | 67,600,000 |
Valor Adicional: | 75,595,829 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| $49,000 |
| $61,550 |
| $68,312 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 0.17 | 78,000 | 13,260 |
Cuadrilla de albañileria x 1 Hora | 2 | 24,504 | 49,009 |
Oficial de construcción x hora | 2 | 15,397 | 30,793 |
Ayudante de construcción x 1 hora | 2 | 9,108 | 18,216 |
Limpiador para PVC 1/4 de galón | 0.0376 | 99,000 | 3,722 |
Soldadura para PVC DE 1/4 de Galón | 0.0313 | 74,150 | 2,321 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 68,312 |
| $44,850 |
| $37,600 |
| $15,000 |
| $75,450 |
| $28,250 |
| $235,000 |
| $64,700 |
| $111,800 |
| $31,350 |
| $91,000 |
| $429,000 |
| $55,150 |
| $28,250 |
| $40,000 |
| $38,800 |
| $30,000 |
| $56,600 |
| $179,794 |
| $25,150 |
| $24,150 |
| $50,000 |
| $72,050 |
| $88,000 |
| $55,500 |
| $123,050 |
| $94,900 |
| $68,150 |
| $1,575,000 |
| $30,600 |
| $42,250 |
| $34,250 |
| $110,200 |
| $165,000 |
| $378,150 |
| $199,450 |
| $135,900 |
| $88,850 |
| $32,550 |
| $1,101,600 |
| $35,500 |
| $108,900 |
| $110,900 |
| $51,500 |
| $34,509 |
| $43,350 |
| $629,400 |
| $28,850 |
| $88,900 |
| $43,150 |
| $46,300 |
| $1,560,000 |
| $30,000 |
| $1,560,000 |
| $273,000 |
| $85,650 |
| $195,000 |
| $29,700 |
| $1,170,000 |
| $520,000 |
| $41,700 |
| $156,000 |
| $650,000 |
| $1,560,000 |
| $1,560,000 |
| $641,000 |
| $82,900 |
| $261,350 |
| $84,150 |
| $114,500 |
| $75,500 |
| $650,000 |
| $30,000 |
| $37,400 |
| $2,028,800 |
| $93,700 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.