| $689,150 |
| $27,500 |
| $418,000 |
| $267,500 |
| $572,000 |
| $25,700 |
| $505,085 |
| $855,350 |
| $152,900 |
| $151,700 |
| $28,550 |
| $97,000 |
| $63,500 |
| $2,576,000 |
| $357,200 |
| $1,560,000 |
| $156,000 |
| $650,000 |
| $156,000 |
| $1,560,000 |
| $32,800 |
| $195,000 |
| $980,750,000 |
| $417,850 |
| $91,000 |
| $2 |
| $26,700 |
| $103,612 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4.5 | 5,200 | 23,400 |
Salario mínimo mensual vigente, base | 0.018 | 1,300,000 | 23,400 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 23,556 |
| $4,737,700 |
| $47,000 |
| $47,400 |
| $775,900 |
| $3,400,000 |
| $650,000 |
| $79,900 |
| $1,077,612 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Instalación de aparatos sanitarios x unidad | 1 | 103,612 | 103,612 |
Cuadrilla de instalaciones x 1 Hora | 0.27 | 26,955 | 7,278 |
Cuadrilla de instalaciones x 1 Hora | 2.7 | 26,955 | 72,778 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4.5 | 5,200 | 23,400 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Valor Adicional: | 103,612 |
| $3,710,062,806 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 6 | 1,112,456 | 6,674,735 |
Hora de ingeniero | 180 | 37,082 | 6,674,735 |
Puente, diseño estructural x 1 m2 | 732 | 246,975 | 180,785,920 |
Salario diario vigente | 4172.4 | 43,329 | 180,785,920 |
Valor Adicional: | 187,460,655 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-50 tipo perfil x 1 Kg | 210000 | 8,050 | 1,690,500,000 |
Soldador mano de obra x hora | 52500 | 16,640 | 873,600,000 |
Salario mínimo mensual vigente, base | 672 | 1,300,000 | 873,600,000 |
Valor Adicional: | 2,564,100,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 90 | 533,055 | 47,974,974 |
Arena lavada de río 1 m3 | 52.92 | 95,019 | 5,028,405 |
Cemento 1 Kg | 33075 | 798 | 26,393,850 |
Triturado de 3/4" x 1 m3 | 79.38 | 150,500 | 11,946,690 |
Agua para la obra 1 litro | 17955 | 36 | 653,562 |
Mezcladora 1 bulto, alquiler x hora | 43.2 | 7,150 | 308,880 |
Cuadrilla 7 (8 obreros) x jornal | 6.3 | 578,347 | 3,643,586 |
Acero G-60 x 1 Kg | 78000 | 5,200 | 405,600,000 |
Valor Adicional: | 453,574,974 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 1200 | 10,038 | 12,045,175 |
Cuerda de Nylon 100 m x 0,50 mm | 60 | 50,900 | 3,054,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 600 | 6,100 | 3,660,000 |
| 12 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 19.68 | 24,504 | 482,246 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 197.88 | 24,504 | 4,848,928 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 6 | 4,147,000 | 24,882,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 18 | 650,000 | 11,700,000 |
Ensayo SPT | 6 | 247,000 | 1,482,000 |
Informe Geotécnico y recomendaciones de construcción | 6 | 1,950,000 | 11,700,000 |
Valor Adicional: | 36,927,175 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 156000000 | 1 | 156,000,000 |
Imprevistos | 156000000 | 1 | 156,000,000 |
Utilidad | 156000000 | 1 | 156,000,000 |
Valor Adicional: | 468,000,000 |
| $974,000 |
| $54,450 |
| $89,000 |
| $884,000 |
| $64,446 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2.67 | 5,200 | 13,884 |
Salario mínimo mensual vigente, base | 0.01068 | 1,300,000 | 13,884 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 14,040 |
| $1,170,000 |
| $273,000 |
| $520,000 |
| $120,600 |
| $78,616 |
| $78,360 |
| $147,200 |
| $5,561,000 |
| $130,848 |
| $23,550 |
| $1,474,850 |
| $549,300 |
| $84,000 |
| $78,000 |
| $50,000 |
| $7,650,000 |
| $50,000 |
| $484,450 |
| $144,300 |
| $80,158 |
| $1,179,000 |
| $45,350 |
| $29,850 |
| $69,850 |
| $223,600 |
| $650,000 |
| $137,800 |
| $50,500 |
| $111,450 |
| $3,946,500 |
| $409,500 |
| $307,000 |
| $195,000 |
| $273,000 |
| $77,000 |
| $182,400 |
| $68,312 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 0.17 | 78,000 | 13,260 |
Cuadrilla de albañileria x 1 Hora | 2 | 24,504 | 49,009 |
Oficial de construcción x hora | 2 | 15,397 | 30,793 |
Ayudante de construcción x 1 hora | 2 | 9,108 | 18,216 |
Limpiador para PVC 1/4 de galón | 0.0376 | 99,000 | 3,722 |
Soldadura para PVC DE 1/4 de Galón | 0.0313 | 74,150 | 2,321 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 68,312 |
| $6,550,000 |
| $25,500 |
| $3,871,608 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa nueva de 1 planta y 209 m2 presupuesto de construcción | 0.014274 | 271,234,996 | 3,871,608 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 2.983266 | 3,900 | 11,635 |
Levantamiento topográfico hasta 1,000 m2 | 0.014274 | 2,600,000 | 37,112 |
Replanteo Arquitectónico X 1 m2 | 2.983266 | 10,038 | 29,945 |
Diseño arquitectónico de casa personalizada x 1 m2 | 2.983266 | 28,597 | 85,313 |
Estudio de suelos y geotecnia desde | 0.014274 | 4,147,000 | 59,194 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.014274 | 11,001 | 157 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 2.983266 | 13,520 | 40,334 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 2.983266 | 16,000 | 47,732 |
Excavación manual en conglomerado x 1 m3 | 0.14274 | 58,492 | 8,349 |
Kit Mueble para baño + lavamanos | 0.042822 | 484,450 | 20,745 |
Punto agua fria PVC 1/2" | 0.256932 | 44,047 | 11,317 |
Tubo 1" x 6 m RDE 13.5 | 0.21411 | 63,000 | 13,489 |
Sanitario suministro e instalación | 0.042822 | 1,077,612 | 46,145 |
Punto desagüe sanitario pvc 4" | 0.21411 | 68,312 | 14,626 |
Caja de inspección y distribución | 0.057096 | 207,000 | 11,819 |
Tubería PVC sanitaria 4" | 0.14274 | 156,100 | 22,282 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.014274 | 23,113 | 330 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.471042 | 23,313 | 10,981 |
Panel de 80W para sistema de energía solar | 0.057096 | 920,900 | 52,580 |
Inversor de voltaje 300W | 0.014274 | 297,050 | 4,240 |
Caja de control sistema de energía solar | 0.014274 | 1,018,750 | 14,542 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.057096 | 731,600 | 41,771 |
Tablero trifásico con puerta de 24 circuitos | 0.014274 | 321,000 | 4,582 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.057096 | 395,000 | 22,553 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.085644 | 492,210 | 42,155 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.114192 | 818,067 | 93,417 |
Acero G-60 x 1 Kg | 8.5644 | 5,200 | 44,535 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.199836 | 533,055 | 106,524 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.028548 | 854,441 | 24,393 |
Muro panel doble cara x 1 m2 | 3.468582 | 232,618 | 806,854 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 2.8548 | 90,690 | 258,902 |
Teja termoacustica x 1 m2, suministro e instalación | 3.254472 | 198,448 | 645,844 |
Guardaescoba en ceramica porcelanato x 1m | 1.227564 | 23,946 | 29,395 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 1.57014 | 178,966 | 281,002 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 0.0513864 | 1,574,907 | 80,929 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 0.21411 | 220,857 | 47,288 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 4.85316 | 12,828 | 62,257 |
Geomembrana Instalación x 1 m2 | 1.71288 | 13,477 | 23,085 |
Cepillera Attica | 0.042822 | 28,850 | 1,235 |
Espejo de 2mm de espesor *1 m2 | 0.042822 | 93,700 | 4,012 |
Argolla toalla attica | 0.042822 | 36,250 | 1,552 |
División de baño corrediza | 0.042822 | 550,000 | 23,552 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 0.014274 | 505,085 | 7,210 |
Puerta de triplex | 0.114192 | 342,450 | 39,105 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.14274 | 140,813 | 20,100 |
Aseo general para entrega de obra x metro cuadrado | 2.983266 | 3,042 | 9,074 |
Administración | 238375.8 | 1 | 238,376 |
Imprevistos | 231238.8 | 1 | 231,239 |
Utilidad | 115619.4 | 1 | 115,619 |
Unidad Monetaria | 22180.3686 | 1 | 22,180 |
Valor Adicional: | 3,871,608 |
| $1,700,000,000 |
| $96,000,000 |
| $97,500 |
| $51,250 |
| $719,094,030 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 600 | 3,900 | 2,340,000 |
Salario mínimo mensual vigente, base | 1.8 | 1,300,000 | 2,340,000 |
| 0 | 0 | 0 |
4655" target="_blank"> | 6 | 0 | 0 |
Replanteo Arquitectónico X 1 m2 | 600 | 10,038 | 6,022,587 |
Cuerda de Nylon 100 m x 0,50 mm | 30 | 50,900 | 1,527,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 300 | 6,100 | 1,830,000 |
| 6 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 9.84 | 24,504 | 241,123 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 98.94 | 24,504 | 2,424,464 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 600 | 28,597 | 17,158,284 |
Salario diario vigente | 396 | 43,329 | 17,158,284 |
Estudio de suelos y geotecnia desde | 6 | 4,147,000 | 24,882,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 18 | 650,000 | 11,700,000 |
Ensayo SPT | 6 | 247,000 | 1,482,000 |
Informe Geotécnico y recomendaciones de construcción | 6 | 1,950,000 | 11,700,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 6 | 11,001 | 66,007 |
Salario diario vigente | 1.5234 | 43,329 | 66,007 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 600 | 13,520 | 8,112,000 |
Diseño hidráulico de edificio x 1 m2 | 600 | 6,760 | 4,056,000 |
Diseño sanitario de edificio x 1 m2, servicio | 600 | 6,760 | 4,056,000 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 600 | 16,000 | 9,600,000 |
Valor Adicional: | 68,180,879 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Punto desagüe sanitario pvc 4" | 90 | 68,312 | 6,148,087 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 15.3 | 78,000 | 1,193,400 |
Cuadrilla de albañileria x 1 Hora | 180 | 24,504 | 4,410,790 |
Limpiador para PVC 1/4 de galón | 3.384 | 99,000 | 335,016 |
Soldadura para PVC DE 1/4 de Galón | 2.817 | 74,150 | 208,881 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 6,148,087 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Panel de 80W para sistema de energía solar | 24 | 920,900 | 22,101,600 |
Inversor de voltaje 300W | 6 | 297,050 | 1,782,300 |
Caja de control sistema de energía solar | 6 | 1,018,750 | 6,112,500 |
Batería estacionaria 90 Amperios para sistema energía solar | 24 | 731,600 | 17,558,400 |
Valor Adicional: | 47,554,800 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 3600 | 5,200 | 18,720,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 84 | 533,055 | 44,776,642 |
Arena lavada de río 1 m3 | 49.392 | 95,019 | 4,693,178 |
Cemento 1 Kg | 30870 | 798 | 24,634,260 |
Triturado de 3/4" x 1 m3 | 74.088 | 150,500 | 11,150,244 |
Agua para la obra 1 litro | 16758 | 36 | 609,991 |
Mezcladora 1 bulto, alquiler x hora | 40.32 | 7,150 | 288,288 |
Cuadrilla 7 (8 obreros) x jornal | 5.88 | 578,347 | 3,400,680 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 12 | 854,441 | 10,253,289 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 12 | 533,055 | 6,396,663 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.12 | 155,000 | 18,600 |
Durmiente ordinario 0,04x0.04x3,00 m. | 12 | 30,000 | 360,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 12 | 32,500 | 390,000 |
Vara clavo 3m | 2.04 | 20,100 | 41,004 |
Cuadrilla de albañileria x 1 Hora | 108 | 24,504 | 2,646,474 |
Cuadrilla de albañileria x 1 Hora | 10.8 | 24,504 | 264,647 |
Vibrador eléctrico de aguja para concreto x hora | 18 | 7,550 | 135,900 |
Valor Adicional: | 73,749,930 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 1020 | 153,842 | 156,918,430 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 759.594 | 83,900 | 63,729,937 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 5.1 | 135,750 | 692,325 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 275.4 | 32,100 | 8,840,340 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 836.4 | 25,500 | 21,328,200 |
Cuadrilla de carpintería por hora | 84.966 | 38,130 | 3,239,713 |
Cuadrilla de carpintería por hora | 849.966 | 38,130 | 32,408,796 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 5100 | 5,200 | 26,520,000 |
Transporte 1 tonelada x 1 kilómetro | 40.8 | 3,900 | 159,120 |
Valor Adicional: | 156,918,430 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Teja termoacustica x 1 m2, suministro e instalación | 660 | 198,448 | 130,975,869 |
Teja termoacústica 3 m x 0.78 m | 282.084 | 393,120 | 110,892,862 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 137.478 | 93,400 | 12,840,445 |
Andamio Tubular estandar con tijeras alquiler por día | 33 | 47,300 | 1,560,900 |
Cuadrilla de instalaciones x 1 Hora | 16.5 | 26,955 | 444,755 |
Cuadrilla de instalaciones x 1 Hora | 165 | 26,955 | 4,447,547 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 132 | 5,200 | 686,400 |
Transporte 1 tonelada x 1 kilómetro | 26.4 | 3,900 | 102,960 |
Valor Adicional: | 130,975,869 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 0 | 99,900,000 | 0 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 2040 | 12,828 | 26,169,528 |
Intervinil 5 galones, vinilo tipo 2 | 20.4 | 230,000 | 4,692,000 |
Cuadrilla de pintura x 1 hora | 44.88 | 38,563 | 1,730,699 |
Cuadrilla de pintura x 1 hora | 448.8 | 38,563 | 17,306,989 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 408 | 5,200 | 2,121,600 |
Transporte 1 tonelada x 1 kilómetro | 81.6 | 3,900 | 318,240 |
Geomembrana Instalación x 1 m2 | 720 | 13,477 | 9,703,738 |
Cuadrilla de albañileria x 1 Hora | 36 | 24,504 | 882,158 |
Cuadrilla de albañileria x 1 Hora | 360 | 24,504 | 8,821,580 |
Cepillera Attica | 18 | 28,850 | 519,300 |
Espejo de 2mm de espesor *1 m2 | 18 | 93,700 | 1,686,600 |
Argolla toalla attica | 18 | 36,250 | 652,500 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 180 | 141,747 | 25,514,397 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 180 | 130,000 | 23,400,000 |
Silicona transparente con fungicida 11 Onzas | 16.38 | 39,050 | 639,639 |
Cuadrilla de albañileria x 1 Hora | 45 | 24,504 | 1,102,698 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 66.15 | 5,200 | 343,980 |
Transporte 1 tonelada x 1 kilómetro | 7.2 | 3,900 | 28,080 |
Valor Adicional: | 64,246,063 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 60 | 140,813 | 8,448,805 |
Cascarilla de arroz x bulto 45 Kg | 15 | 155,000 | 2,325,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 4.5 | 91,000 | 409,500 |
Plántula aguacate | 60 | 33,250 | 1,995,000 |
Tierra negra abonada x 1 m3 | 12 | 235,000 | 2,820,000 |
Pala redonda No. 4 mango plástico | 0.3 | 63,000 | 18,900 |
Cuadrilla de instalaciones x 1 Hora | 30 | 26,955 | 808,645 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 12 | 5,200 | 62,400 |
Transporte 1 tonelada x 1 kilómetro | 2.4 | 3,900 | 9,360 |
Valor Adicional: | 8,448,805 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 60000000 | 1 | 60,000,000 |
Valor Adicional: | 60,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 60000000 | 1 | 60,000,000 |
Valor Adicional: | 60,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 34800000 | 1 | 34,800,000 |
Valor Adicional: | 34,800,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 5700000 | 1 | 5,700,000 |
Valor Adicional: | 5,700,000 |
| $224,308,597,072 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 44800 | 1,000,000 | 44,800,000,000 |
Valor Adicional: | 44,800,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 35 | 2,600,000 | 91,000,000 |
Salario mínimo mensual vigente, base | 70 | 1,300,000 | 91,000,000 |
Replanteo Arquitectónico X 1 m2 | 171465 | 10,038 | 1,721,104,920 |
Cuerda de Nylon 100 m x 0,50 mm | 8573.25 | 50,900 | 436,378,425 |
Estaca de Madera Ø=0.05 L=0.60 m | 85732.5 | 6,100 | 522,968,250 |
| 1714.65 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 2812.026 | 24,504 | 68,906,979 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 28274.5785 | 24,504 | 692,851,270 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 171465 | 14,000 | 2,400,510,000 |
Estudio de suelos y geotecnia desde | 70 | 4,147,000 | 290,290,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 210 | 650,000 | 136,500,000 |
Ensayo SPT | 70 | 247,000 | 17,290,000 |
Informe Geotécnico y recomendaciones de construcción | 70 | 1,950,000 | 136,500,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 171465 | 10,400 | 1,783,236,000 |
Salario mínimo mensual vigente, base | 1371.72 | 1,300,000 | 1,783,236,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 171465 | 13,520 | 2,318,206,800 |
Diseño hidráulico de edificio x 1 m2 | 171465 | 6,760 | 1,159,103,400 |
Diseño sanitario de edificio x 1 m2, servicio | 171465 | 6,760 | 1,159,103,400 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 171465 | 16,000 | 2,743,440,000 |
Valor Adicional: | 11,347,787,720 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 148008 | 4,551 | 673,621,410 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 3700.2 | 182,050 | 673,621,410 |
Piloteadora, alquiler por Hora | 560 | 390,000 | 218,400,000 |
Salario mínimo mensual vigente, base | 168 | 1,300,000 | 218,400,000 |
Valor Adicional: | 892,021,410 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 8619121 | 5,200 | 44,819,429,200 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 44737 | 533,055 | 23,847,293,220 |
Arena lavada de río 1 m3 | 26305.356 | 95,019 | 2,499,508,622 |
Cemento 1 Kg | 16440847.5 | 798 | 13,119,796,305 |
Triturado de 3/4" x 1 m3 | 39458.034 | 150,500 | 5,938,434,235 |
Agua para la obra 1 litro | 8925031.5 | 36 | 324,871,147 |
Mezcladora 1 bulto, alquiler x hora | 21473.76 | 7,150 | 153,537,384 |
Cuadrilla 7 (8 obreros) x jornal | 3131.59 | 578,347 | 1,811,145,528 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 7000 | 854,441 | 5,981,084,986 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 7000 | 533,055 | 3,731,386,828 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 70 | 155,000 | 10,850,000 |
Durmiente ordinario 0,04x0.04x3,00 m. | 7000 | 30,000 | 210,000,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 7000 | 32,500 | 227,500,000 |
Vara clavo 3m | 1190 | 20,100 | 23,919,000 |
Cuadrilla de albañileria x 1 Hora | 63000 | 24,504 | 1,543,776,507 |
Cuadrilla de albañileria x 1 Hora | 6300 | 24,504 | 154,377,651 |
Vibrador eléctrico de aguja para concreto x hora | 10500 | 7,550 | 79,275,000 |
Valor Adicional: | 74,647,807,406 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 2520 | 484,450 | 1,220,814,000 |
Punto agua fria PVC 1/2" | 15120 | 44,047 | 665,983,139 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 3024 | 20,300 | 61,387,200 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 756 | 30,700 | 23,209,200 |
Codo PVC 90° presión de 1/2" x 10 unidades | 1512 | 45,000 | 68,040,000 |
Soldadura para PVC 1/4 de galón | 604.8 | 53,500 | 32,356,800 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 226.8 | 77,000 | 17,463,600 |
Instalación carpintería metálica x 1 m2 | 20154.96 | 20,907 | 421,387,581 |
Instalación carpintería metálica x 1 m2 | 2015.496 | 20,907 | 42,138,758 |
Tubo 1" x 6 m RDE 13.5 | 12600 | 63,000 | 793,800,000 |
Valor Adicional: | 2,680,597,139 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 2520 | 1,077,612 | 2,715,581,834 |
Sanitario One Piece Galio Blanco | 2520 | 974,000 | 2,454,480,000 |
Instalación de aparatos sanitarios x unidad | 2520 | 103,612 | 261,101,834 |
Punto desagüe sanitario pvc 4" | 12600 | 68,312 | 860,732,120 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 2142 | 78,000 | 167,076,000 |
Cuadrilla de albañileria x 1 Hora | 25200 | 24,504 | 617,510,603 |
Limpiador para PVC 1/4 de galón | 473.76 | 99,000 | 46,902,240 |
Soldadura para PVC DE 1/4 de Galón | 394.38 | 74,150 | 29,243,277 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 3360 | 207,000 | 695,520,000 |
Tubería PVC sanitaria 4" | 8400 | 156,100 | 1,311,240,000 |
Valor Adicional: | 5,583,073,954 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 840 | 23,113 | 19,414,729 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 168 | 94,000 | 15,792,000 |
Cuadrilla de albañileria x 1 Hora | 134.4 | 24,504 | 3,293,390 |
Cuadrilla de albañileria x 1 Hora | 13.44 | 24,504 | 329,339 |
Interruptor sencillo cuatro vías. Suministro e instalación | 27720 | 23,313 | 646,230,054 |
Interruptor sencillo cuatro vías x 5 unidades | 5544 | 95,000 | 526,680,000 |
Cuadrilla de albañileria x 1 Hora | 4435.2 | 24,504 | 108,681,866 |
Cuadrilla de albañileria x 1 Hora | 443.52 | 24,504 | 10,868,187 |
Panel de 80W para sistema de energía solar | 3360 | 920,900 | 3,094,224,000 |
Inversor de voltaje 300W | 840 | 297,050 | 249,522,000 |
Caja de control sistema de energía solar | 840 | 1,018,750 | 855,750,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 3360 | 731,600 | 2,458,176,000 |
Tablero trifásico con puerta de 24 circuitos | 840 | 321,000 | 269,640,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 3360 | 395,000 | 1,327,200,000 |
Valor Adicional: | 8,920,156,783 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 108780 | 153,842 | 16,734,889,030 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 81008.466 | 83,900 | 6,796,610,297 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 543.9 | 135,750 | 73,834,425 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 29370.6 | 32,100 | 942,796,260 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 89199.6 | 25,500 | 2,274,589,800 |
Cuadrilla de carpintería por hora | 9061.374 | 38,130 | 345,505,841 |
Cuadrilla de carpintería por hora | 90646.374 | 38,130 | 3,456,302,730 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 543900 | 5,200 | 2,828,280,000 |
Transporte 1 tonelada x 1 kilómetro | 4351.2 | 3,900 | 16,969,680 |
Valor Adicional: | 16,734,889,030 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 42 | 99,900,000 | 4,195,800,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 211750 | 12,828 | 2,716,371,350 |
Intervinil 5 galones, vinilo tipo 2 | 2117.5 | 230,000 | 487,025,000 |
Cuadrilla de pintura x 1 hora | 4658.5 | 38,563 | 179,644,850 |
Cuadrilla de pintura x 1 hora | 46585 | 38,563 | 1,796,448,504 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 42350 | 5,200 | 220,220,000 |
Transporte 1 tonelada x 1 kilómetro | 8470 | 3,900 | 33,033,000 |
Geomembrana Instalación x 1 m2 | 142800 | 13,477 | 1,924,574,719 |
Cuadrilla de albañileria x 1 Hora | 7140 | 24,504 | 174,961,337 |
Cuadrilla de albañileria x 1 Hora | 71400 | 24,504 | 1,749,613,375 |
Cepillera Attica | 2100 | 28,850 | 60,585,000 |
Espejo de 2mm de espesor *1 m2 | 4200 | 93,700 | 393,540,000 |
Argolla toalla attica | 2100 | 36,250 | 76,125,000 |
Valor Adicional: | 9,366,996,069 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 2800 | 140,813 | 394,277,559 |
Cascarilla de arroz x bulto 45 Kg | 700 | 155,000 | 108,500,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 210 | 91,000 | 19,110,000 |
Plántula aguacate | 2800 | 33,250 | 93,100,000 |
Tierra negra abonada x 1 m3 | 560 | 235,000 | 131,600,000 |
Pala redonda No. 4 mango plástico | 14 | 63,000 | 882,000 |
Cuadrilla de instalaciones x 1 Hora | 1400 | 26,955 | 37,736,759 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 560 | 5,200 | 2,912,000 |
Transporte 1 tonelada x 1 kilómetro | 112 | 3,900 | 436,800 |
Valor Adicional: | 394,277,559 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 18858000000 | 1 | 18,858,000,000 |
Valor Adicional: | 18,858,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 18858000000 | 1 | 18,858,000,000 |
Valor Adicional: | 18,858,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 9432990000 | 1 | 9,432,990,000 |
Valor Adicional: | 9,432,990,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 1792000000 | 1 | 1,792,000,000 |
Valor Adicional: | 1,792,000,000 |
| $20,370,000 |
| $119,000 |
| $13,537,727 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00104776133 | 12,920,619,720 | 13,537,726 |
Terreno, predio, lote precio por 1m2 | 2.619403325 | 1,000,000 | 2,619,403 |
Levantamiento topográfico hasta 1,000 m2 | 0.00209552266 | 2,600,000 | 5,448 |
Replanteo Arquitectónico X 1 m2 | 8.55497125945 | 10,038 | 85,872 |
Diseño arquitectónico de edificios x 1 m2 | 8.55497125945 | 14,000 | 119,770 |
Estudio de suelos y geotecnia desde | 0.00419104532 | 4,147,000 | 17,380 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 8.55497125945 | 10,400 | 88,972 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 8.55497125945 | 13,520 | 115,663 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 8.55497125945 | 16,000 | 136,880 |
Excavación mecánica en conglomerado x 1 m3 | 7.69475920752 | 4,551 | 35,021 |
Piloteadora, alquiler por Hora | 0.0838209064 | 390,000 | 32,690 |
Acero G-60 x 1 Kg | 430.03687371722 | 5,200 | 2,236,192 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 2.23277939423 | 533,055 | 1,190,195 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.34890452289 | 854,441 | 298,118 |
Steel deck metaldeck grado 40 | 1.71099425189 | 451,000 | 771,658 |
Kit Mueble para baño + lavamanos | 0.1257313596 | 484,450 | 60,911 |
Punto agua fria PVC 1/2" | 0.7543881576 | 44,047 | 33,228 |
Tubo 1" x 6 m RDE 13.5 | 0.628656798 | 63,000 | 39,605 |
Sanitario suministro e instalación | 0.1257313596 | 1,077,612 | 135,490 |
Punto desagüe sanitario pvc 4" | 0.628656798 | 68,312 | 42,945 |
Caja de inspección y distribución | 0.1676418128 | 207,000 | 34,702 |
Tubería PVC sanitaria 4" | 0.419104532 | 156,100 | 65,422 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.0419104532 | 23,113 | 969 |
Interruptor sencillo cuatro vías. Suministro e instalación | 1.3830449556 | 23,313 | 32,243 |
Panel de 80W para sistema de energía solar | 0.1676418128 | 920,900 | 154,381 |
Inversor de voltaje 300W | 0.0419104532 | 297,050 | 12,450 |
Caja de control sistema de energía solar | 0.0419104532 | 1,018,750 | 42,696 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.1676418128 | 731,600 | 122,647 |
Tablero trifásico con puerta de 24 circuitos | 0.0419104532 | 321,000 | 13,453 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.1676418128 | 395,000 | 66,219 |
Muro drywall doble cara x 1 m2 | 5.4274036894 | 153,842 | 834,960 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 5.448358916 | 178,966 | 975,072 |
Ascensor 8 personas | 0.00209552266 | 99,900,000 | 209,343 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 10.582389433 | 12,828 | 135,753 |
Geomembrana Instalación x 1 m2 | 3.14328399 | 13,477 | 42,363 |
Cepillera Attica | 0.104776133 | 28,850 | 3,023 |
Espejo de 2mm de espesor *1 m2 | 0.209552266 | 93,700 | 19,635 |
Argolla toalla attica | 0.104776133 | 36,250 | 3,798 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 13.2541808245 | 141,747 | 1,878,736 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0104776133 | 140,813 | 1,475 |
Administración | 329147.93525152 | 1 | 329,148 |
Imprevistos | 164649.40644152 | 1 | 164,649 |
Utilidad | 329147.93525152 | 1 | 329,148 |
Valor Adicional: | 13,537,726 |
| $143,900,771 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo de 30 plantas y 24495 m2, presupuesto de construcción | 0.0044907124 | 32,044,085,296 | 143,900,771 |
Terreno, predio, lote precio por 1m2 | 28.74055936 | 1,000,000 | 28,740,559 |
Levantamiento topográfico hasta 1,000 m2 | 0.022453562 | 2,600,000 | 58,379 |
Replanteo Arquitectónico X 1 m2 | 110.000000238 | 10,038 | 1,104,141 |
Diseño arquitectónico de edificios x 1 m2 | 110.000000238 | 14,000 | 1,540,000 |
Estudio de suelos y geotecnia desde | 0.044907124 | 4,147,000 | 186,230 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 110.000000238 | 10,400 | 1,144,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 110.000000238 | 13,520 | 1,487,200 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 110.000000238 | 16,000 | 1,760,000 |
Excavación mecánica en conglomerado x 1 m3 | 94.9516229856 | 4,551 | 432,149 |
Piloteadora, alquiler por Hora | 0.359256992 | 390,000 | 140,110 |
Acero G-60 x 1 Kg | 5529.4276502572 | 5,200 | 28,753,024 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 28.7001429484 | 533,055 | 15,298,762 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4.4907124 | 854,441 | 3,837,048 |
Kit Mueble para baño + lavamanos | 1.616656464 | 484,450 | 783,189 |
Punto agua fria PVC 1/2" | 9.699938784 | 44,047 | 427,248 |
Tubo 1" x 6 m RDE 13.5 | 8.08328232 | 63,000 | 509,247 |
Sanitario suministro e instalación | 1.616656464 | 1,077,612 | 1,742,128 |
Punto desagüe sanitario pvc 4" | 8.08328232 | 68,312 | 552,186 |
Caja de inspección y distribución | 2.155541952 | 207,000 | 446,197 |
Tubería PVC sanitaria 4" | 5.38885488 | 156,100 | 841,200 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.538885488 | 23,113 | 12,455 |
Interruptor sencillo cuatro vías. Suministro e instalación | 17.783221104 | 23,313 | 414,576 |
Panel de 80W para sistema de energía solar | 2.155541952 | 920,900 | 1,985,039 |
Inversor de voltaje 300W | 0.538885488 | 297,050 | 160,076 |
Caja de control sistema de energía solar | 0.538885488 | 1,018,750 | 548,990 |
Batería estacionaria 90 Amperios para sistema energía solar | 2.155541952 | 731,600 | 1,576,994 |
Tablero trifásico con puerta de 24 circuitos | 0.538885488 | 321,000 | 172,982 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 2.155541952 | 395,000 | 851,439 |
Muro drywall doble cara x 1 m2 | 69.785670696 | 153,842 | 10,735,939 |
Ascensor 8 personas | 0.0269442744 | 99,900,000 | 2,691,733 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 135.8440501 | 12,828 | 1,742,635 |
Geomembrana Instalación x 1 m2 | 91.61053296 | 13,477 | 1,234,673 |
Cepillera Attica | 1.34721372 | 28,850 | 38,867 |
Espejo de 2mm de espesor *1 m2 | 2.69442744 | 93,700 | 252,468 |
Argolla toalla attica | 1.34721372 | 36,250 | 48,836 |
Aguacate, Suministro y siembra de 1 (una) plántula | 1.79628496 | 140,813 | 252,941 |
Administración | 12097979.2056 | 1 | 12,097,979 |
Imprevistos | 12097979.2056 | 1 | 12,097,979 |
Utilidad | 6051549.308868 | 1 | 6,051,549 |
Unidad Monetaria | 1149622.3744 | 1 | 1,149,622 |
Valor Adicional: | 143,900,771 |
| $1,084,939,984 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 836 | 3,900 | 3,260,400 |
Salario mínimo mensual vigente, base | 2.508 | 1,300,000 | 3,260,400 |
Levantamiento topográfico hasta 1,000 m2 | 4 | 2,600,000 | 10,400,000 |
Salario mínimo mensual vigente, base | 8 | 1,300,000 | 10,400,000 |
Replanteo Arquitectónico X 1 m2 | 836 | 10,038 | 8,391,472 |
Cuerda de Nylon 100 m x 0,50 mm | 41.8 | 50,900 | 2,127,620 |
Estaca de Madera Ø=0.05 L=0.60 m | 418 | 6,100 | 2,549,800 |
| 8.36 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 13.7104 | 24,504 | 335,965 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 137.8564 | 24,504 | 3,378,087 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 836 | 28,597 | 23,907,209 |
Salario diario vigente | 551.76 | 43,329 | 23,907,209 |
Estudio de suelos y geotecnia desde | 4 | 4,147,000 | 16,588,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 12 | 650,000 | 7,800,000 |
Ensayo SPT | 4 | 247,000 | 988,000 |
Informe Geotécnico y recomendaciones de construcción | 4 | 1,950,000 | 7,800,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 4 | 11,001 | 44,005 |
Salario diario vigente | 1.0156 | 43,329 | 44,005 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 836 | 13,520 | 11,302,720 |
Diseño hidráulico de edificio x 1 m2 | 836 | 6,760 | 5,651,360 |
Diseño sanitario de edificio x 1 m2, servicio | 836 | 6,760 | 5,651,360 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 836 | 16,000 | 13,376,000 |
Valor Adicional: | 87,269,806 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 40 | 58,492 | 2,339,679 |
Cuadrilla de albañileria x 1 Hora | 8.68 | 24,504 | 212,698 |
Cuadrilla de albañileria x 1 Hora | 86.8 | 24,504 | 2,126,981 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 2,339,679 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 12 | 484,450 | 5,813,400 |
Punto agua fria PVC 1/2" | 72 | 44,047 | 3,171,348 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 14.4 | 20,300 | 292,320 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 3.6 | 30,700 | 110,520 |
Codo PVC 90° presión de 1/2" x 10 unidades | 7.2 | 45,000 | 324,000 |
Soldadura para PVC 1/4 de galón | 2.88 | 53,500 | 154,080 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 1.08 | 77,000 | 83,160 |
Instalación carpintería metálica x 1 m2 | 95.976 | 20,907 | 2,006,608 |
Instalación carpintería metálica x 1 m2 | 9.5976 | 20,907 | 200,661 |
Tubo 1" x 6 m RDE 13.5 | 60 | 63,000 | 3,780,000 |
Valor Adicional: | 12,764,748 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 12 | 1,077,612 | 12,931,342 |
Sanitario One Piece Galio Blanco | 12 | 974,000 | 11,688,000 |
Instalación de aparatos sanitarios x unidad | 12 | 103,612 | 1,243,342 |
Punto desagüe sanitario pvc 4" | 60 | 68,312 | 4,098,724 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 10.2 | 78,000 | 795,600 |
Cuadrilla de albañileria x 1 Hora | 120 | 24,504 | 2,940,527 |
Limpiador para PVC 1/4 de galón | 2.256 | 99,000 | 223,344 |
Soldadura para PVC DE 1/4 de Galón | 1.878 | 74,150 | 139,254 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 16 | 207,000 | 3,312,000 |
Tubería PVC sanitaria 4" | 40 | 156,100 | 6,244,000 |
Valor Adicional: | 26,586,066 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 4 | 23,113 | 92,451 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 0.8 | 94,000 | 75,200 |
Cuadrilla de albañileria x 1 Hora | 0.64 | 24,504 | 15,683 |
Cuadrilla de albañileria x 1 Hora | 0.064 | 24,504 | 1,568 |
Interruptor sencillo cuatro vías. Suministro e instalación | 132 | 23,313 | 3,077,286 |
Interruptor sencillo cuatro vías x 5 unidades | 26.4 | 95,000 | 2,508,000 |
Cuadrilla de albañileria x 1 Hora | 21.12 | 24,504 | 517,533 |
Cuadrilla de albañileria x 1 Hora | 2.112 | 24,504 | 51,753 |
Panel de 80W para sistema de energía solar | 16 | 920,900 | 14,734,400 |
Inversor de voltaje 300W | 4 | 297,050 | 1,188,200 |
Caja de control sistema de energía solar | 4 | 1,018,750 | 4,075,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 16 | 731,600 | 11,705,600 |
Tablero trifásico con puerta de 24 circuitos | 4 | 321,000 | 1,284,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 16 | 395,000 | 6,320,000 |
Valor Adicional: | 42,476,937 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 24 | 492,210 | 11,813,040 |
Agua para la obra 1 litro | 4296 | 36 | 156,374 |
Arena lavada de río 1 m3 | 18.144 | 95,019 | 1,724,025 |
Cemento 1 Kg | 7560 | 798 | 6,032,880 |
Triturado de 3/4" x 1 m3 | 18.144 | 150,500 | 2,730,672 |
Mezcladora 1 bulto, alquiler x hora | 24 | 7,150 | 171,600 |
Cuadrilla 7 (8 obreros) x jornal | 1.68 | 578,347 | 971,623 |
Oficial de construcción x hora | 1.68 | 15,397 | 25,866 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 32 | 818,067 | 26,178,147 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 32 | 533,055 | 17,057,768 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 94.72 | 13,000 | 1,231,360 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 4.8 | 155,000 | 744,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 11.52 | 10,000 | 115,200 |
| 41.92 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 260.8 | 24,504 | 6,390,745 |
Cuadrilla de albañileria x 1 Hora | 26.08 | 24,504 | 639,074 |
Acero G-60 x 1 Kg | 2400 | 5,200 | 12,480,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 56 | 533,055 | 29,851,095 |
Arena lavada de río 1 m3 | 32.928 | 95,019 | 3,128,786 |
Cemento 1 Kg | 20580 | 798 | 16,422,840 |
Triturado de 3/4" x 1 m3 | 49.392 | 150,500 | 7,433,496 |
Agua para la obra 1 litro | 11172 | 36 | 406,661 |
Mezcladora 1 bulto, alquiler x hora | 26.88 | 7,150 | 192,192 |
Cuadrilla 7 (8 obreros) x jornal | 3.92 | 578,347 | 2,267,120 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 8 | 854,441 | 6,835,526 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 8 | 533,055 | 4,264,442 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.08 | 155,000 | 12,400 |
Durmiente ordinario 0,04x0.04x3,00 m. | 8 | 30,000 | 240,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 8 | 32,500 | 260,000 |
Vara clavo 3m | 1.36 | 20,100 | 27,336 |
Cuadrilla de albañileria x 1 Hora | 72 | 24,504 | 1,764,316 |
Cuadrilla de albañileria x 1 Hora | 7.2 | 24,504 | 176,432 |
Vibrador eléctrico de aguja para concreto x hora | 12 | 7,550 | 90,600 |
Valor Adicional: | 87,157,808 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 972 | 232,618 | 226,104,606 |
Sistema, Panel x 1 m2 x 0.04 m | 1020.6 | 56,500 | 57,663,900 |
Malla plana RG2 | 388.8 | 5,350 | 2,080,080 |
Malla RGU 80 | 486 | 6,500 | 3,159,000 |
Malla angular RG1 | 486 | 6,700 | 3,256,200 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 53.46 | 473,449 | 25,310,594 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 250.776 | 31,013 | 7,777,266 |
Cuadrilla de instalaciones x 1 Hora | 146.5776 | 26,955 | 3,950,974 |
Cuadrilla de instalaciones x 1 Hora | 1465.776 | 26,955 | 39,509,740 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4860 | 5,200 | 25,272,000 |
Transporte 1 tonelada x 1 kilómetro | 38.88 | 3,900 | 151,632 |
Muro panel doble cara x 1 m2 | 97.2 | 232,618 | 22,610,461 |
Muro panel doble cara x 1 m2 | 97.2 | 232,618 | 22,610,461 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 6.2208 | 232,618 | 1,447,069 |
Valor Adicional: | 226,104,606 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 800 | 90,690 | 72,551,932 |
Acero G-60 x 1 Kg | 7920 | 5,200 | 41,184,000 |
Pintuco Anticorrosivo rojo | 144 | 95,000 | 13,680,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 96 | 34,650 | 3,326,400 |
Cuadrilla de albañileria x 1 Hora | 532.8 | 24,504 | 13,055,938 |
Cuadrilla de albañileria x 1 Hora | 53.28 | 24,504 | 1,305,594 |
Teja termoacustica x 1 m2, suministro e instalación | 912 | 198,448 | 180,984,837 |
Teja termoacústica 3 m x 0.78 m | 389.7888 | 393,120 | 153,233,773 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 189.9696 | 93,400 | 17,743,161 |
Andamio Tubular estandar con tijeras alquiler por día | 45.6 | 47,300 | 2,156,880 |
Cuadrilla de instalaciones x 1 Hora | 22.8 | 26,955 | 614,570 |
Cuadrilla de instalaciones x 1 Hora | 228 | 26,955 | 6,145,701 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 182.4 | 5,200 | 948,480 |
Transporte 1 tonelada x 1 kilómetro | 36.48 | 3,900 | 142,272 |
Valor Adicional: | 253,536,769 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Guardaescoba en ceramica porcelanato x 1m | 344 | 23,946 | 8,237,456 |
Agua para la obra 1 litro | 516 | 36 | 18,782 |
Arena lavada de río 1 m3 | 5.16 | 95,019 | 490,298 |
Pegacor max, 25 Kg, porcelanato | 8.6 | 85,500 | 735,300 |
Porcelanato sellado Beige x 1 m2 | 34.4 | 135,900 | 4,674,960 |
Cuadrilla de albañileria x 1 Hora | 86 | 24,504 | 2,107,377 |
Cuadrilla de albañileria x 1 Hora | 8.6 | 24,504 | 210,738 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 440 | 178,966 | 78,745,155 |
Agua para la obra 1 litro | 1540 | 36 | 56,056 |
Pegacor max, 25 Kg, porcelanato | 110 | 85,500 | 9,405,000 |
Porcelanato sellado Beige x 1 m2 | 440 | 135,900 | 59,796,000 |
Cuadrilla de albañileria x 1 Hora | 352 | 24,504 | 8,625,545 |
Cuadrilla de albañileria x 1 Hora | 35.2 | 24,504 | 862,554 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 14.4 | 1,574,907 | 22,678,666 |
Puerta en aluminio con vidrio templado de 6 mm x 1m2 | 28.8 | 777,000 | 22,377,600 |
Instalación carpintería metálica x 1 m2 | 14.4 | 20,907 | 301,066 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 60 | 220,857 | 13,251,443 |
Ventana corrediza aluminio anodizado con vidrios x 1m2 | 60 | 199,950 | 11,997,000 |
Instalación carpintería metálica x 1 m2 | 60 | 20,907 | 1,254,443 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1360 | 12,828 | 17,446,352 |
Intervinil 5 galones, vinilo tipo 2 | 13.6 | 230,000 | 3,128,000 |
Cuadrilla de pintura x 1 hora | 29.92 | 38,563 | 1,153,799 |
Cuadrilla de pintura x 1 hora | 299.2 | 38,563 | 11,537,993 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 272 | 5,200 | 1,414,400 |
Transporte 1 tonelada x 1 kilómetro | 54.4 | 3,900 | 212,160 |
Geomembrana Instalación x 1 m2 | 480 | 13,477 | 6,469,159 |
Cuadrilla de albañileria x 1 Hora | 24 | 24,504 | 588,105 |
Cuadrilla de albañileria x 1 Hora | 240 | 24,504 | 5,881,053 |
Cepillera Attica | 12 | 28,850 | 346,200 |
Espejo de 2mm de espesor *1 m2 | 12 | 93,700 | 1,124,400 |
Argolla toalla attica | 12 | 36,250 | 435,000 |
División de baño corrediza | 12 | 550,000 | 6,600,000 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 4 | 505,085 | 2,020,340 |
Puerta de triplex | 32 | 342,450 | 10,958,400 |
Valor Adicional: | 168,312,571 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 40 | 140,813 | 5,632,537 |
Cascarilla de arroz x bulto 45 Kg | 10 | 155,000 | 1,550,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 3 | 91,000 | 273,000 |
Plántula aguacate | 40 | 33,250 | 1,330,000 |
Tierra negra abonada x 1 m3 | 8 | 235,000 | 1,880,000 |
Pala redonda No. 4 mango plástico | 0.2 | 63,000 | 12,600 |
Cuadrilla de instalaciones x 1 Hora | 20 | 26,955 | 539,097 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 8 | 5,200 | 41,600 |
Transporte 1 tonelada x 1 kilómetro | 1.6 | 3,900 | 6,240 |
Valor Adicional: | 5,632,537 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 66800000 | 1 | 66,800,000 |
Valor Adicional: | 66,800,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 64800000 | 1 | 64,800,000 |
Valor Adicional: | 64,800,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 32400000 | 1 | 32,400,000 |
Valor Adicional: | 32,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 6215600 | 1 | 6,215,600 |
Valor Adicional: | 6,215,600 |
| $24,000 |
| $6,500,000 |
| $299,900 |
| $100,000 |
| $4,854,280 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa en obra gris de 1 planta y 209 m2 presupuesto de construcción | 0.024 | 202,261,719 | 4,854,281 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 5.016 | 3,900 | 19,562 |
Levantamiento topográfico hasta 1,000 m2 | 0.024 | 2,600,000 | 62,400 |
Replanteo Arquitectónico X 1 m2 | 5.016 | 10,038 | 50,349 |
Diseño arquitectónico de casa personalizada x 1 m2 | 5.016 | 28,597 | 143,443 |
Estudio de suelos y geotecnia desde | 0.024 | 4,147,000 | 99,528 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.024 | 11,001 | 264 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 5.016 | 13,520 | 67,816 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 5.016 | 16,000 | 80,256 |
Excavación manual en conglomerado x 1 m3 | 0.24 | 58,492 | 14,038 |
Kit Mueble para baño + lavamanos | 0.072 | 484,450 | 34,880 |
Punto agua fria PVC 1/2" | 0.432 | 44,047 | 19,028 |
Tubo 1" x 6 m RDE 13.5 | 0.36 | 63,000 | 22,680 |
Sanitario suministro e instalación | 0.072 | 1,077,612 | 77,588 |
Punto desagüe sanitario pvc 4" | 0.36 | 68,312 | 24,592 |
Caja de inspección y distribución | 0.096 | 207,000 | 19,872 |
Tubería PVC sanitaria 4" | 0.24 | 156,100 | 37,464 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.144 | 492,210 | 70,878 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.192 | 818,067 | 157,069 |
Acero G-60 x 1 Kg | 14.4 | 5,200 | 74,880 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.336 | 533,055 | 179,107 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.048 | 854,441 | 41,013 |
Muro panel doble cara x 1 m2 | 5.832 | 232,618 | 1,356,628 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 4.8 | 90,690 | 435,312 |
Teja termoacustica x 1 m2, suministro e instalación | 5.472 | 198,448 | 1,085,909 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.24 | 140,813 | 33,795 |
Aseo general para entrega de obra x metro cuadrado | 5.016 | 3,042 | 15,257 |
Administración | 304800 | 1 | 304,800 |
Imprevistos | 148800 | 1 | 148,800 |
Utilidad | 148800 | 1 | 148,800 |
Unidad Monetaria | 28272 | 1 | 28,272 |
Valor Adicional: | 4,854,281 |
| $119,600 |
| $503,665,728 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo de 30 plantas y 24495 m2, presupuesto de construcción | 0.0157179 | 32,044,085,296 | 503,665,728 |
Terreno, predio, lote precio por 1m2 | 100.59456 | 1,000,000 | 100,594,560 |
Levantamiento topográfico hasta 1,000 m2 | 0.0785895 | 2,600,000 | 204,333 |
Replanteo Arquitectónico X 1 m2 | 385.0099605 | 10,038 | 3,864,594 |
Diseño arquitectónico de edificios x 1 m2 | 385.0099605 | 14,000 | 5,390,139 |
Estudio de suelos y geotecnia desde | 0.157179 | 4,147,000 | 651,821 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 385.0099605 | 10,400 | 4,004,104 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 385.0099605 | 13,520 | 5,205,335 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 385.0099605 | 16,000 | 6,160,159 |
Excavación mecánica en conglomerado x 1 m3 | 332.3392776 | 4,551 | 1,512,559 |
Piloteadora, alquiler por Hora | 1.257432 | 390,000 | 490,398 |
Acero G-60 x 1 Kg | 19353.4974237 | 5,200 | 100,638,187 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 100.4530989 | 533,055 | 53,547,053 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 15.7179 | 854,441 | 13,430,014 |
Kit Mueble para baño + lavamanos | 5.658444 | 484,450 | 2,741,233 |
Punto agua fria PVC 1/2" | 33.950664 | 44,047 | 1,495,408 |
Tubo 1" x 6 m RDE 13.5 | 28.29222 | 63,000 | 1,782,410 |
Sanitario suministro e instalación | 5.658444 | 1,077,612 | 6,097,606 |
Punto desagüe sanitario pvc 4" | 28.29222 | 68,312 | 1,932,700 |
Caja de inspección y distribución | 7.544592 | 207,000 | 1,561,731 |
Tubería PVC sanitaria 4" | 18.86148 | 156,100 | 2,944,277 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 1.886148 | 23,113 | 43,594 |
Interruptor sencillo cuatro vías. Suministro e instalación | 62.242884 | 23,313 | 1,451,054 |
Panel de 80W para sistema de energía solar | 7.544592 | 920,900 | 6,947,815 |
Inversor de voltaje 300W | 1.886148 | 297,050 | 560,280 |
Caja de control sistema de energía solar | 1.886148 | 1,018,750 | 1,921,513 |
Batería estacionaria 90 Amperios para sistema energía solar | 7.544592 | 731,600 | 5,519,624 |
Tablero trifásico con puerta de 24 circuitos | 1.886148 | 321,000 | 605,454 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 7.544592 | 395,000 | 2,980,114 |
Muro drywall doble cara x 1 m2 | 244.256166 | 153,842 | 37,576,759 |
Ascensor 8 personas | 0.0943074 | 99,900,000 | 9,421,309 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 475.466475 | 12,828 | 6,099,379 |
Geomembrana Instalación x 1 m2 | 320.64516 | 13,477 | 4,321,468 |
Cepillera Attica | 4.71537 | 28,850 | 136,038 |
Espejo de 2mm de espesor *1 m2 | 9.43074 | 93,700 | 883,660 |
Argolla toalla attica | 4.71537 | 36,250 | 170,932 |
Aguacate, Suministro y siembra de 1 (una) plántula | 6.28716 | 140,813 | 885,316 |
Administración | 42344022.6 | 1 | 42,344,023 |
Imprevistos | 42344022.6 | 1 | 42,344,023 |
Utilidad | 21180970.503 | 1 | 21,180,971 |
Unidad Monetaria | 4023782.4 | 1 | 4,023,782 |
Valor Adicional: | 503,665,728 |
| $190,250 |
| $195,000 |
| $5,950,000 |
| $51,682,478,880 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 10000 | 1,000,000 | 10,000,000,000 |
Valor Adicional: | 10,000,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 8 | 2,600,000 | 20,800,000 |
Salario mínimo mensual vigente, base | 16 | 1,300,000 | 20,800,000 |
Replanteo Arquitectónico X 1 m2 | 32660 | 10,038 | 327,829,509 |
Cuerda de Nylon 100 m x 0,50 mm | 1633 | 50,900 | 83,119,700 |
Estaca de Madera Ø=0.05 L=0.60 m | 16330 | 6,100 | 99,613,000 |
| 326.6 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 535.624 | 24,504 | 13,125,139 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 5385.634 | 24,504 | 131,971,671 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 32660 | 14,000 | 457,240,000 |
Estudio de suelos y geotecnia desde | 16 | 4,147,000 | 66,352,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 48 | 650,000 | 31,200,000 |
Ensayo SPT | 16 | 247,000 | 3,952,000 |
Informe Geotécnico y recomendaciones de construcción | 16 | 1,950,000 | 31,200,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 32660 | 10,400 | 339,664,000 |
Salario mínimo mensual vigente, base | 261.28 | 1,300,000 | 339,664,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 32660 | 13,520 | 441,563,200 |
Diseño hidráulico de edificio x 1 m2 | 32660 | 6,760 | 220,781,600 |
Diseño sanitario de edificio x 1 m2, servicio | 32660 | 6,760 | 220,781,600 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 32660 | 16,000 | 522,560,000 |
Valor Adicional: | 2,176,008,709 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 29376 | 4,551 | 133,697,520 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 734.4 | 182,050 | 133,697,520 |
Piloteadora, alquiler por Hora | 320 | 390,000 | 124,800,000 |
Salario mínimo mensual vigente, base | 96 | 1,300,000 | 124,800,000 |
Valor Adicional: | 258,497,520 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 1641736 | 5,200 | 8,537,027,200 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 8524 | 533,055 | 4,543,763,046 |
Arena lavada de río 1 m3 | 5012.112 | 95,019 | 476,245,870 |
Cemento 1 Kg | 3132570 | 798 | 2,499,790,860 |
Triturado de 3/4" x 1 m3 | 7518.168 | 150,500 | 1,131,484,307 |
Agua para la obra 1 litro | 1700538 | 36 | 61,899,583 |
Mezcladora 1 bulto, alquiler x hora | 4091.52 | 7,150 | 29,254,368 |
Cuadrilla 7 (8 obreros) x jornal | 596.68 | 578,347 | 345,088,059 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 1332 | 854,441 | 1,138,115,029 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 1332 | 533,055 | 710,029,608 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 13.32 | 155,000 | 2,064,600 |
Durmiente ordinario 0,04x0.04x3,00 m. | 1332 | 30,000 | 39,960,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 1332 | 32,500 | 43,290,000 |
Vara clavo 3m | 226.44 | 20,100 | 4,551,444 |
Cuadrilla de albañileria x 1 Hora | 11988 | 24,504 | 293,758,615 |
Cuadrilla de albañileria x 1 Hora | 1198.8 | 24,504 | 29,375,862 |
Vibrador eléctrico de aguja para concreto x hora | 1998 | 7,550 | 15,084,900 |
Steel deck metaldeck grado 40 | 6532 | 451,000 | 2,945,932,000 |
Valor Adicional: | 17,164,837,275 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 480 | 484,450 | 232,536,000 |
Punto agua fria PVC 1/2" | 2880 | 44,047 | 126,853,931 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 576 | 20,300 | 11,692,800 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 144 | 30,700 | 4,420,800 |
Codo PVC 90° presión de 1/2" x 10 unidades | 288 | 45,000 | 12,960,000 |
Soldadura para PVC 1/4 de galón | 115.2 | 53,500 | 6,163,200 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 43.2 | 77,000 | 3,326,400 |
Instalación carpintería metálica x 1 m2 | 3839.04 | 20,907 | 80,264,301 |
Instalación carpintería metálica x 1 m2 | 383.904 | 20,907 | 8,026,430 |
Tubo 1" x 6 m RDE 13.5 | 2400 | 63,000 | 151,200,000 |
Valor Adicional: | 510,589,931 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 480 | 1,077,612 | 517,253,683 |
Sanitario One Piece Galio Blanco | 480 | 974,000 | 467,520,000 |
Instalación de aparatos sanitarios x unidad | 480 | 103,612 | 49,733,683 |
Punto desagüe sanitario pvc 4" | 2400 | 68,312 | 163,948,975 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 408 | 78,000 | 31,824,000 |
Cuadrilla de albañileria x 1 Hora | 4800 | 24,504 | 117,621,067 |
Limpiador para PVC 1/4 de galón | 90.24 | 99,000 | 8,933,760 |
Soldadura para PVC DE 1/4 de Galón | 75.12 | 74,150 | 5,570,148 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 640 | 207,000 | 132,480,000 |
Tubería PVC sanitaria 4" | 1600 | 156,100 | 249,760,000 |
Valor Adicional: | 1,063,442,658 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 160 | 23,113 | 3,698,044 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 32 | 94,000 | 3,008,000 |
Cuadrilla de albañileria x 1 Hora | 25.6 | 24,504 | 627,312 |
Cuadrilla de albañileria x 1 Hora | 2.56 | 24,504 | 62,731 |
Interruptor sencillo cuatro vías. Suministro e instalación | 5280 | 23,313 | 123,091,439 |
Interruptor sencillo cuatro vías x 5 unidades | 1056 | 95,000 | 100,320,000 |
Cuadrilla de albañileria x 1 Hora | 844.8 | 24,504 | 20,701,308 |
Cuadrilla de albañileria x 1 Hora | 84.48 | 24,504 | 2,070,131 |
Panel de 80W para sistema de energía solar | 640 | 920,900 | 589,376,000 |
Inversor de voltaje 300W | 160 | 297,050 | 47,528,000 |
Caja de control sistema de energía solar | 160 | 1,018,750 | 163,000,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 640 | 731,600 | 468,224,000 |
Tablero trifásico con puerta de 24 circuitos | 160 | 321,000 | 51,360,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 640 | 395,000 | 252,800,000 |
Valor Adicional: | 1,699,077,482 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 20720 | 153,842 | 3,187,597,911 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 15430.184 | 83,900 | 1,294,592,438 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 103.6 | 135,750 | 14,063,700 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 5594.4 | 32,100 | 179,580,240 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 16990.4 | 25,500 | 433,255,200 |
Cuadrilla de carpintería por hora | 1725.976 | 38,130 | 65,810,636 |
Cuadrilla de carpintería por hora | 17265.976 | 38,130 | 658,343,377 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 103600 | 5,200 | 538,720,000 |
Transporte 1 tonelada x 1 kilómetro | 828.8 | 3,900 | 3,232,320 |
Valor Adicional: | 3,187,597,911 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 20800 | 178,966 | 3,722,498,256 |
Agua para la obra 1 litro | 72800 | 36 | 2,649,920 |
Pegacor max, 25 Kg, porcelanato | 5200 | 85,500 | 444,600,000 |
Porcelanato sellado Beige x 1 m2 | 20800 | 135,900 | 2,826,720,000 |
Cuadrilla de albañileria x 1 Hora | 16640 | 24,504 | 407,753,033 |
Cuadrilla de albañileria x 1 Hora | 1664 | 24,504 | 40,775,303 |
Ascensor 8 personas | 8 | 99,900,000 | 799,200,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 40400 | 12,828 | 518,259,280 |
Intervinil 5 galones, vinilo tipo 2 | 404 | 230,000 | 92,920,000 |
Cuadrilla de pintura x 1 hora | 888.8 | 38,563 | 34,274,626 |
Cuadrilla de pintura x 1 hora | 8888 | 38,563 | 342,746,255 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 8080 | 5,200 | 42,016,000 |
Transporte 1 tonelada x 1 kilómetro | 1616 | 3,900 | 6,302,400 |
Geomembrana Instalación x 1 m2 | 12000 | 13,477 | 161,728,968 |
Cuadrilla de albañileria x 1 Hora | 600 | 24,504 | 14,702,633 |
Cuadrilla de albañileria x 1 Hora | 6000 | 24,504 | 147,026,334 |
Cepillera Attica | 400 | 28,850 | 11,540,000 |
Espejo de 2mm de espesor *1 m2 | 800 | 93,700 | 74,960,000 |
Argolla toalla attica | 400 | 36,250 | 14,500,000 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 50600 | 141,747 | 7,172,380,353 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 50600 | 130,000 | 6,578,000,000 |
Silicona transparente con fungicida 11 Onzas | 4604.6 | 39,050 | 179,809,630 |
Cuadrilla de albañileria x 1 Hora | 12650 | 24,504 | 309,980,521 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 18595.5 | 5,200 | 96,696,600 |
Transporte 1 tonelada x 1 kilómetro | 2024 | 3,900 | 7,893,600 |
Valor Adicional: | 12,475,066,857 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 40 | 140,813 | 5,632,537 |
Cascarilla de arroz x bulto 45 Kg | 10 | 155,000 | 1,550,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 3 | 91,000 | 273,000 |
Plántula aguacate | 40 | 33,250 | 1,330,000 |
Tierra negra abonada x 1 m3 | 8 | 235,000 | 1,880,000 |
Pala redonda No. 4 mango plástico | 0.2 | 63,000 | 12,600 |
Cuadrilla de instalaciones x 1 Hora | 20 | 26,955 | 539,097 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 8 | 5,200 | 41,600 |
Transporte 1 tonelada x 1 kilómetro | 1.6 | 3,900 | 6,240 |
Valor Adicional: | 5,632,537 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 1256576000 | 1 | 1,256,576,000 |
Valor Adicional: | 1,256,576,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 628576000 | 1 | 628,576,000 |
Valor Adicional: | 628,576,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 1256576000 | 1 | 1,256,576,000 |
Valor Adicional: | 1,256,576,000 |
| $90,000 |
| $195,000 |
| $809,046,876 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 836 | 3,900 | 3,260,400 |
Salario mínimo mensual vigente, base | 2.508 | 1,300,000 | 3,260,400 |
Levantamiento topográfico hasta 1,000 m2 | 4 | 2,600,000 | 10,400,000 |
Salario mínimo mensual vigente, base | 8 | 1,300,000 | 10,400,000 |
Replanteo Arquitectónico X 1 m2 | 836 | 10,038 | 8,391,472 |
Cuerda de Nylon 100 m x 0,50 mm | 41.8 | 50,900 | 2,127,620 |
Estaca de Madera Ø=0.05 L=0.60 m | 418 | 6,100 | 2,549,800 |
| 8.36 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 13.7104 | 24,504 | 335,965 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 137.8564 | 24,504 | 3,378,087 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 836 | 28,597 | 23,907,209 |
Salario diario vigente | 551.76 | 43,329 | 23,907,209 |
Estudio de suelos y geotecnia desde | 4 | 4,147,000 | 16,588,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 12 | 650,000 | 7,800,000 |
Ensayo SPT | 4 | 247,000 | 988,000 |
Informe Geotécnico y recomendaciones de construcción | 4 | 1,950,000 | 7,800,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 4 | 11,001 | 44,005 |
Salario diario vigente | 1.0156 | 43,329 | 44,005 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 836 | 13,520 | 11,302,720 |
Diseño hidráulico de edificio x 1 m2 | 836 | 6,760 | 5,651,360 |
Diseño sanitario de edificio x 1 m2, servicio | 836 | 6,760 | 5,651,360 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 836 | 16,000 | 13,376,000 |
Valor Adicional: | 87,269,806 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 40 | 58,492 | 2,339,679 |
Cuadrilla de albañileria x 1 Hora | 8.68 | 24,504 | 212,698 |
Cuadrilla de albañileria x 1 Hora | 86.8 | 24,504 | 2,126,981 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 2,339,679 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 12 | 484,450 | 5,813,400 |
Punto agua fria PVC 1/2" | 72 | 44,047 | 3,171,348 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 14.4 | 20,300 | 292,320 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 3.6 | 30,700 | 110,520 |
Codo PVC 90° presión de 1/2" x 10 unidades | 7.2 | 45,000 | 324,000 |
Soldadura para PVC 1/4 de galón | 2.88 | 53,500 | 154,080 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 1.08 | 77,000 | 83,160 |
Instalación carpintería metálica x 1 m2 | 95.976 | 20,907 | 2,006,608 |
Instalación carpintería metálica x 1 m2 | 9.5976 | 20,907 | 200,661 |
Tubo 1" x 6 m RDE 13.5 | 60 | 63,000 | 3,780,000 |
Valor Adicional: | 12,764,748 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 12 | 1,077,612 | 12,931,342 |
Sanitario One Piece Galio Blanco | 12 | 974,000 | 11,688,000 |
Instalación de aparatos sanitarios x unidad | 12 | 103,612 | 1,243,342 |
Punto desagüe sanitario pvc 4" | 60 | 68,312 | 4,098,724 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 10.2 | 78,000 | 795,600 |
Cuadrilla de albañileria x 1 Hora | 120 | 24,504 | 2,940,527 |
Limpiador para PVC 1/4 de galón | 2.256 | 99,000 | 223,344 |
Soldadura para PVC DE 1/4 de Galón | 1.878 | 74,150 | 139,254 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 16 | 207,000 | 3,312,000 |
Tubería PVC sanitaria 4" | 40 | 156,100 | 6,244,000 |
Valor Adicional: | 26,586,066 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 24 | 492,210 | 11,813,040 |
Agua para la obra 1 litro | 4296 | 36 | 156,374 |
Arena lavada de río 1 m3 | 18.144 | 95,019 | 1,724,025 |
Cemento 1 Kg | 7560 | 798 | 6,032,880 |
Triturado de 3/4" x 1 m3 | 18.144 | 150,500 | 2,730,672 |
Mezcladora 1 bulto, alquiler x hora | 24 | 7,150 | 171,600 |
Cuadrilla 7 (8 obreros) x jornal | 1.68 | 578,347 | 971,623 |
Oficial de construcción x hora | 1.68 | 15,397 | 25,866 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 32 | 818,067 | 26,178,147 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 32 | 533,055 | 17,057,768 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 94.72 | 13,000 | 1,231,360 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 4.8 | 155,000 | 744,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 11.52 | 10,000 | 115,200 |
| 41.92 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 260.8 | 24,504 | 6,390,745 |
Cuadrilla de albañileria x 1 Hora | 26.08 | 24,504 | 639,074 |
Acero G-60 x 1 Kg | 2400 | 5,200 | 12,480,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 56 | 533,055 | 29,851,095 |
Arena lavada de río 1 m3 | 32.928 | 95,019 | 3,128,786 |
Cemento 1 Kg | 20580 | 798 | 16,422,840 |
Triturado de 3/4" x 1 m3 | 49.392 | 150,500 | 7,433,496 |
Agua para la obra 1 litro | 11172 | 36 | 406,661 |
Mezcladora 1 bulto, alquiler x hora | 26.88 | 7,150 | 192,192 |
Cuadrilla 7 (8 obreros) x jornal | 3.92 | 578,347 | 2,267,120 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 8 | 854,441 | 6,835,526 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 8 | 533,055 | 4,264,442 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.08 | 155,000 | 12,400 |
Durmiente ordinario 0,04x0.04x3,00 m. | 8 | 30,000 | 240,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 8 | 32,500 | 260,000 |
Vara clavo 3m | 1.36 | 20,100 | 27,336 |
Cuadrilla de albañileria x 1 Hora | 72 | 24,504 | 1,764,316 |
Cuadrilla de albañileria x 1 Hora | 7.2 | 24,504 | 176,432 |
Vibrador eléctrico de aguja para concreto x hora | 12 | 7,550 | 90,600 |
Valor Adicional: | 87,157,808 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 972 | 232,618 | 226,104,606 |
Sistema, Panel x 1 m2 x 0.04 m | 1020.6 | 56,500 | 57,663,900 |
Malla plana RG2 | 388.8 | 5,350 | 2,080,080 |
Malla RGU 80 | 486 | 6,500 | 3,159,000 |
Malla angular RG1 | 486 | 6,700 | 3,256,200 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 53.46 | 473,449 | 25,310,594 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 250.776 | 31,013 | 7,777,266 |
Cuadrilla de instalaciones x 1 Hora | 146.5776 | 26,955 | 3,950,974 |
Cuadrilla de instalaciones x 1 Hora | 1465.776 | 26,955 | 39,509,740 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4860 | 5,200 | 25,272,000 |
Transporte 1 tonelada x 1 kilómetro | 38.88 | 3,900 | 151,632 |
Muro panel doble cara x 1 m2 | 97.2 | 232,618 | 22,610,461 |
Muro panel doble cara x 1 m2 | 97.2 | 232,618 | 22,610,461 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 6.2208 | 232,618 | 1,447,069 |
Valor Adicional: | 226,104,606 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 800 | 90,690 | 72,551,932 |
Acero G-60 x 1 Kg | 7920 | 5,200 | 41,184,000 |
Pintuco Anticorrosivo rojo | 144 | 95,000 | 13,680,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 96 | 34,650 | 3,326,400 |
Cuadrilla de albañileria x 1 Hora | 532.8 | 24,504 | 13,055,938 |
Cuadrilla de albañileria x 1 Hora | 53.28 | 24,504 | 1,305,594 |
Teja termoacustica x 1 m2, suministro e instalación | 912 | 198,448 | 180,984,837 |
Teja termoacústica 3 m x 0.78 m | 389.7888 | 393,120 | 153,233,773 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 189.9696 | 93,400 | 17,743,161 |
Andamio Tubular estandar con tijeras alquiler por día | 45.6 | 47,300 | 2,156,880 |
Cuadrilla de instalaciones x 1 Hora | 22.8 | 26,955 | 614,570 |
Cuadrilla de instalaciones x 1 Hora | 228 | 26,955 | 6,145,701 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 182.4 | 5,200 | 948,480 |
Transporte 1 tonelada x 1 kilómetro | 36.48 | 3,900 | 142,272 |
Valor Adicional: | 253,536,769 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 40 | 140,813 | 5,632,537 |
Cascarilla de arroz x bulto 45 Kg | 10 | 155,000 | 1,550,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 3 | 91,000 | 273,000 |
Plántula aguacate | 40 | 33,250 | 1,330,000 |
Tierra negra abonada x 1 m3 | 8 | 235,000 | 1,880,000 |
Pala redonda No. 4 mango plástico | 0.2 | 63,000 | 12,600 |
Cuadrilla de instalaciones x 1 Hora | 20 | 26,955 | 539,097 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 8 | 5,200 | 41,600 |
Transporte 1 tonelada x 1 kilómetro | 1.6 | 3,900 | 6,240 |
Valor Adicional: | 5,632,537 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 50800000 | 1 | 50,800,000 |
Valor Adicional: | 50,800,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 24800000 | 1 | 24,800,000 |
Valor Adicional: | 24,800,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 24800000 | 1 | 24,800,000 |
Valor Adicional: | 24,800,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 4712000 | 1 | 4,712,000 |
Valor Adicional: | 4,712,000 |
| $6,250 |
| $571,700 |
| $96,550 |
| $650,000 |
| $193,284,614 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 103.16 | 533,055 | 54,989,981 |
Arena lavada de río 1 m3 | 60.65808 | 95,019 | 5,763,670 |
Cemento 1 Kg | 37911.3 | 798 | 30,253,217 |
Triturado de 3/4" x 1 m3 | 90.98712 | 150,500 | 13,693,562 |
Agua para la obra 1 litro | 20580.42 | 36 | 749,127 |
Mezcladora 1 bulto, alquiler x hora | 49.5168 | 7,150 | 354,045 |
Cuadrilla 7 (8 obreros) x jornal | 7.2212 | 578,347 | 4,176,359 |
Acero G-60 x 1 Kg | 4340 | 5,200 | 22,568,000 |
Cuadrilla de albañileria x 1 Hora | 1600 | 24,504 | 39,207,022 |
Oficial de construcción x hora | 1600 | 15,397 | 24,634,501 |
Ayudante de construcción x 1 hora | 1600 | 9,108 | 14,572,522 |
Valor Adicional: | 116,765,003 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 10 | 533,055 | 5,330,553 |
Arena lavada de río 1 m3 | 5.88 | 95,019 | 558,712 |
Cemento 1 Kg | 3675 | 798 | 2,932,650 |
Triturado de 3/4" x 1 m3 | 8.82 | 150,500 | 1,327,410 |
Agua para la obra 1 litro | 1995 | 36 | 72,618 |
Mezcladora 1 bulto, alquiler x hora | 4.8 | 7,150 | 34,320 |
Cuadrilla 7 (8 obreros) x jornal | 0.7 | 578,347 | 404,843 |
Acero G-60 x 1 Kg | 2600 | 5,200 | 13,520,000 |
Valor Adicional: | 18,850,553 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 400 | 10,038 | 4,015,058 |
Cuerda de Nylon 100 m x 0,50 mm | 20 | 50,900 | 1,018,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 200 | 6,100 | 1,220,000 |
| 4 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 6.56 | 24,504 | 160,749 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 65.96 | 24,504 | 1,616,309 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 2 | 4,147,000 | 8,294,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 6 | 650,000 | 3,900,000 |
Ensayo SPT | 2 | 247,000 | 494,000 |
Informe Geotécnico y recomendaciones de construcción | 2 | 1,950,000 | 3,900,000 |
Valor Adicional: | 12,309,058 |
| $0 |
| $124,020 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 23.85 | 5,200 | 124,020 |
Valor Adicional: | 124,020 |
| $33,400 |
| $1,000,000 |
| $150,000 |
| $83,750 |
| $76,000 |
| $149,000 |
| $90,700 |
| $58,500 |
| $42,250 |
| $781,000 |
| $0 |
| $43,600 |
| $0 |
| $75,000 |
| $76,650 |
| $207,000 |
| $0 |
| $102,500 |
| $292,000 |
| $29,450 |
| $36,500 |
| $95,000 |
| $390,000 |
| $48,500 |
| $2,010,375,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño de pavimento por unidad homogénea de diseño, según cbr y tránsito | 3 | 3,900,000 | 11,700,000 |
Salario mínimo mensual vigente, base | 9 | 1,300,000 | 11,700,000 |
Valor Adicional: | 11,700,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Subbase triturada de 2" x 1 m3 | 2100 | 125,200 | 262,920,000 |
Base granular de 1 1/2" x m3 | 2100 | 126,550 | 265,755,000 |
Asfalto 60/70 por tonelada | 700 | 2,100,000 | 1,470,000,000 |
Valor Adicional: | 1,998,675,000 |
| $458,953 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Bisagras de 3" en niquel | 0.76 | 27,250 | 20,710 |
Cuadrilla de carpintería por hora | 10.31 | 38,130 | 393,115 |
Salario diario vigente | 9.0728 | 43,329 | 393,115 |
Pegante colbón 1 galón | 0.25 | 73,000 | 18,250 |
| 0.15 | 0 | 0 |
Tornillo autoperforante de 8 x 5/8" avellanado madera y aglomerados cobrizado BOLSA 100 unidades | 0.05 | 27,950 | 1,398 |
triplex otobo 4 mm | 0.52 | 49,000 | 25,480 |
Valor Adicional: | 458,953 |
| $39,000 |
| $5,239,000 |
| $104,000 |
| $57,950 |
| $576,000 |
| $175,850 |
| $112,970 |
| $702,000 |
| $395,000 |
| $268,700 |
| $26,550 |
| $2,790,000 |
| $49,000 |
| $1,952,000 |
| $104,000 |
| $115,200 |
| $78,000 |
| $20,280 |
| $57,750 |
| $1,650,000 |
| $33,400 |
| $123,500,000 |
| $90,000 |
| $28,597 |
| $14,000 |
| $113,400 |
| $169,000 |
| $31,600 |
| $50,000 |
| $35,800 |
| $1,933,961 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Apartamento nuevo en edificio de 10 plantas, Precio por 1 m2 | 1 | 1,933,961 | 1,933,961 |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00014968019 | 12,920,619,720 | 1,933,961 |
Valor Adicional: | 1,933,961 |
| $520,000 |
| $910,000 |
| $120,000 |
| $416,000 |
| $624,945,100 |
| $205,000 |
| $702,000 |
| $50,000 |
| $23,313 |
| $465,000,000 |
| $12,038,000 |
| $176,200 |
| $50,000 |
| $73,650 |
| $55,000 |
| $770,000 |
| $35,900 |
| $132,000 |
| $45,300 |
| $44,900 |
| $90,000 |
| $149,500 |
| $13,000 |
| $416,000 |
| $37,950 |
| $50,000 |
| $455,360 |
| $91,000 |
| $550,000,000 |
| $104,000 |
| $59,950 |
| $104,000 |
| $192,100 |
| $110,000 |
| $28,000 |
| $1,100,000 |
| $17,000 |
| $319,900 |
| $104,000 |
| $1,350,000 |
| $533,100 |
| $33,000 |
| $50,000 |
| $268,000 |
| $178,700 |
| $275,900 |
| $55,550 |
| $23,600 |
| $299,000 |
| $11,000 |
| $104,000 |
| $1,650,000 |
| $284,350 |
| $23,113 |
| $36,500 |
| $40,000 |
| $39,000 |
| $116,600 |
| $91,450 |
| $900,000,000 |
| $28,890 |
| $39,000 |
| $52,900 |
| $143,000 |
| $5,043 |
| $1,040,000 |
| $34,250 |
| $25,000 |
| $6,000,000 |
| $471,500 |
| $52,900 |
| $22,750 |
| $1,235,000 |
| $49,000 |
| $163,550 |
| $518,000 |
| $75,000 |
| $13,520 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño hidráulico de edificio x 1 m2 | 1 | 6,760 | 6,760 |
Salario mínimo mensual vigente, base | 0.0052 | 1,300,000 | 6,760 |
Diseño sanitario de edificio x 1 m2, servicio | 1 | 6,760 | 6,760 |
Salario mínimo mensual vigente, base | 0.0052 | 1,300,000 | 6,760 |
Valor Adicional: | 13,520 |
| $6,228,000 |
| $104,000 |
| $5,500 |
| $50,000 |
| $1,300,000 |
| $2,391,250 |
| $88,850 |
| $82,200 |
| $19,900 |
| $261,100 |
| $182,000 |
| $373,000 |
| $2,777,000 |
| $34,250 |
| $105,300 |
| $32,000,000 |
| $105,300 |
| $26,750 |
| $40,600 |
| $25,000 |
| $68,247,140 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto premezclado de 4000 PSI o 27.6 MPa x 1 m3 | 100 | 682,471 | 68,247,140 |
Arena lavada de río 1 m3 | 60 | 95,019 | 5,701,140 |
Cemento 1 Kg | 42000 | 798 | 33,516,000 |
Triturado de 3/4" x 1 m3 | 60 | 150,500 | 9,030,000 |
Planta de concreto precio por hora | 20 | 1,000,000 | 20,000,000 |
Valor Adicional: | 68,247,140 |
| $104,000 |
| $3,203,250 |
| $508,750 |
| $10,140 |
| $68,500 |
| $13,000,000 |
| $44,000 |
| $1,287,000 |
| $6,760 |
| $650,000 |
| $20,000 |
| $25,000 |
| $49,900 |
| $69,900 |
| $87,000 |
| $59,386 |
| $50,000 |
| $4,500,000 |
| $3,203,250 |
| $220,050 |
| $28,400 |
| $34,650 |
| $518,000 |
| $46,650 |
| $35,650 |
| $2,600,000 |
| $97,500 |
| $100,000,000,000 |
| $195,000 |
| $10,038 |
| $170,950 |
| $39,000,000 |
| $338,000 |
| $32,550 |
| $31,250 |
| $102,700 |
| $78,000 |
| $105,000 |
| $32,950 |
| $3,551,240 |
| $33,650 |
| $163,800 |
| $91,500 |
| $3,500,000 |
| $49,900 |
| $25,000 |
| $325,000 |
| $3,087,250 |
| $29,700 |
| $286,000 |
| $173,750 |
| $2,700,000 |
| $380,000 |
| $78,000 |
| $910 |
| $950,000 |
| $486,900 |
| $1,854,150 |
| $3,057,250 |
| $42,250 |
| $1,843,900 |
| $202,900 |
| $1,776,800 |
| $1,346,500 |
| $1,323,250 |
| $411,500 |
| $495,000 |
| $48,350 |
| $150,000 |
| $140,000 |
| $1,075,000 |
| $260,000 |
| $1,527,450 |
| $1,620,000 |
| $103,656 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Oficial de construcción x hora | 2 | 15,397 | 30,793 |
Salario mínimo mensual vigente, incluyendo complementos | 0.0142 | 2,168,530 | 30,793 |
Ayudante de construcción x 1 hora | 8 | 9,108 | 72,863 |
Salario mínimo mensual vigente, incluyendo complementos | 0.0336 | 2,168,530 | 72,863 |
Valor Adicional: | 103,656 |
| $464,000 |
| $295,000 |
| $38,130 |
| $146,875 |
| $124,000 |
| $182,832,000 |
| $143,300 |
| $1,000,000 |
| $34,500 |
| $7,684,100 |
| $1,350,000 |
| $312,000 |
| $13,703,500 |
| $93,000 |
| $413,200 |
| $34,509 |
| $199,450 |
| $358,000 |
| $71,500 |
| $766,300 |
| $4,223,100 |
| $28,850 |
| $99,900 |
| $4,736,000 |
| $5,000 |
| $8,636,000 |
| $357,000 |
| $90,300 |
| $195,000 |
| $302,800 |
| $63,321 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 0.0292 | 2,168,530 | 63,321 |
Salario mínimo mensual vigente, base | 0.0292 | 1,300,000 | 37,960 |
Salario mínimo mensual vigente, base | 0.00363832 | 1,300,000 | 4,730 |
Salario mínimo mensual vigente, base | 0.003504 | 1,300,000 | 4,555 |
Salario mínimo mensual vigente, base | 0.002482 | 1,300,000 | 3,227 |
Salario mínimo mensual vigente, base | 0.002628 | 1,300,000 | 3,416 |
Salario mínimo mensual vigente, base | 0.00243236 | 1,300,000 | 3,162 |
Salario mínimo mensual vigente, base | 0.000292 | 1,300,000 | 380 |
Salario mínimo mensual vigente, base | 0.00015184 | 1,300,000 | 197 |
Salario mínimo mensual vigente, base | 0.00243236 | 1,300,000 | 3,162 |
Salario mínimo mensual vigente, base | 0.00121764 | 1,300,000 | 1,583 |
Salario mínimo mensual vigente, base | 0.00073 | 1,300,000 | 949 |
Valor Adicional: | 63,321 |
| $325,000 |
| $195,000 |
| $3,639,636 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario diario vigente | 84 | 43,329 | 3,639,636 |
Salario mínimo mensual vigente, base | 2.79972 | 1,300,000 | 3,639,636 |
Valor Adicional: | 3,639,636 |
| $28,200 |
| $121,250 |
| $40,000 |
| $58,750 |
| $293,000 |
| $130,000 |
| $82,850 |
| $26,100 |
| $41,800 |
| $27,300 |
| $85,000 |
| $25,400 |
| $143,000 |
| $21,100 |
| $3,990,000 |
| $5,000,000 |
| $390,000 |
| $43,400 |
| $234,000 |
| $130,750 |
| $32,500 |
| $90,000 |
| $69,700 |
| $92,000 |
| $202,000 |
| $92,000 |
| $7,581 |
| $35,200 |
| $89,500 |
| $145,950 |
| $33,300 |
| $102,700 |
| $80,500 |
| $63,000 |
| $97,500 |
| $2,300,000 |
| $143,000 |
| $58,000 |
| $39,400 |
| $24,850 |
| $168,900 |
| $427,650 |
| $200,000 |
| $39,250 |
| $104,000 |
| $23,900 |
| $266,000 |
| $150,900 |
| $43,000 |
| $78,700 |
| $48,550 |
| $95,000 |
| $2,915,000 |
| $86,808 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.2 | 5,200 | 1,040 |
Salario mínimo mensual vigente, base | 0.0008 | 1,300,000 | 1,040 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 1,196 |
| $380,000 |
| $2,168,530 |
| $26,850 |
| $490,000 |
| $390,000 |
| $34,150 |
| $410,000 |
| $140,600 |
| $440,000 |
| $293,700 |
| $390,000 |
| $650,000 |
| $93,400 |
| $156,000 |
| $70,000 |
| $51,995 |
| $28,600 |
| $247,000 |
| $139,700 |
| $200,000 |
| $2,166,450 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario diario vigente | 50 | 43,329 | 2,166,450 |
Salario mínimo mensual vigente, base | 1.6665 | 1,300,000 | 2,166,450 |
Valor Adicional: | 2,166,450 |
| $5,044,000 |
| $471,000 |
| $40,000 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.