| USD$52.87 |
| USD$52.86 |
| USD$33.15 |
| USD$4.65 |
| USD$50.29 |
| USD$11.48 |
| USD$1.16 |
| USD$23.21 |
| USD$23.21 |
| USD$19.13 |
| USD$37.10 |
| USD$43.39 |
| USD$32.13 |
| USD$20.74 |
| USD$12.37 |
| USD$21.36 |
| USD$26.52 |
| USD$19.55 |
| USD$14.73 |
| USD$74.46 |
| USD$135.94 |
| USD$18.78 |
| USD$14.03 |
| USD$364.01 |
| USD$7.96 |
| USD$3,383.85 |
| USD$10.89 |
| USD$194.40 |
| USD$10.94 |
| USD$238.43 |
| USD$151.73 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.6 | 95,019 | 57,011 |
Arena lavada de río 6 m3 | 0.10002 | 570,000 | 57,011 |
Cemento 1 Kg | 500 | 798 | 399,000 |
Cemento, bulto de 50 Kg | 10 | 39,900 | 399,000 |
Triturado de 3/4" x 1 m3 | 0.6 | 150,500 | 90,300 |
Grava 3/4" x 6 m3 | 0.100000002 | 903,000 | 90,300 |
Valor Adicional: | 546,311 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cuadrilla 7 (8 obreros) x jornal | 0.07 | 578,347 | 40,484 |
Salario mínimo mensual vigente, incluyendo complementos | 0.018669 | 2,168,530 | 40,484 |
Oficial de construcción x hora | 0.07 | 15,397 | 1,078 |
Salario mínimo mensual vigente, incluyendo complementos | 0.000497 | 2,168,530 | 1,078 |
Valor Adicional: | 41,562 |
| USD$617.79 |
| USD$229,500.00 |
| USD$9.74 |
| USD$646.43 |
| USD$14.05 |
| USD$19.89 |
| USD$23.13 |
| USD$26.52 |
| USD$157,393.99 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-50 tipo perfil x 1 Kg | 35000 | 8,050 | 281,750,000 |
Soldador mano de obra x hora | 8750 | 16,640 | 145,600,000 |
Salario mínimo mensual vigente, base | 112 | 1,300,000 | 145,600,000 |
Valor Adicional: | 427,350,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 15 | 533,055 | 7,995,829 |
Arena lavada de río 1 m3 | 8.82 | 95,019 | 838,068 |
Cemento 1 Kg | 5512.5 | 798 | 4,398,975 |
Triturado de 3/4" x 1 m3 | 13.23 | 150,500 | 1,991,115 |
Agua para la obra 1 litro | 2992.5 | 36 | 108,927 |
Mezcladora 1 bulto, alquiler x hora | 7.2 | 7,150 | 51,480 |
Cuadrilla 7 (8 obreros) x jornal | 1.05 | 578,347 | 607,264 |
Acero G-60 x 1 Kg | 13000 | 5,200 | 67,600,000 |
Valor Adicional: | 75,595,829 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| USD$606.96 |
| USD$87.59 |
| USD$188.94 |
| USD$113.55 |
| USD$26.52 |
| USD$27.34 |
| USD$688.50 |
| USD$72.51 |
| USD$7.37 |
| USD$26.52 |
| USD$630,710.68 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 4 | 1,112,456 | 4,449,824 |
Hora de ingeniero | 120 | 37,082 | 4,449,824 |
Puente, diseño estructural x 1 m2 | 488 | 246,975 | 120,523,946 |
Salario diario vigente | 2781.6 | 43,329 | 120,523,946 |
Valor Adicional: | 124,973,770 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-50 tipo perfil x 1 Kg | 140000 | 8,050 | 1,127,000,000 |
Soldador mano de obra x hora | 35000 | 16,640 | 582,400,000 |
Salario mínimo mensual vigente, base | 448 | 1,300,000 | 582,400,000 |
Valor Adicional: | 1,709,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 60 | 533,055 | 31,983,316 |
Arena lavada de río 1 m3 | 35.28 | 95,019 | 3,352,270 |
Cemento 1 Kg | 22050 | 798 | 17,595,900 |
Triturado de 3/4" x 1 m3 | 52.92 | 150,500 | 7,964,460 |
Agua para la obra 1 litro | 11970 | 36 | 435,708 |
Mezcladora 1 bulto, alquiler x hora | 28.8 | 7,150 | 205,920 |
Cuadrilla 7 (8 obreros) x jornal | 4.2 | 578,347 | 2,429,057 |
Acero G-60 x 1 Kg | 52000 | 5,200 | 270,400,000 |
Valor Adicional: | 302,383,316 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 800 | 10,038 | 8,030,117 |
Cuerda de Nylon 100 m x 0,50 mm | 40 | 50,900 | 2,036,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 400 | 6,100 | 2,440,000 |
| 8 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 13.12 | 24,504 | 321,498 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 131.92 | 24,504 | 3,232,619 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 4 | 4,147,000 | 16,588,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 12 | 650,000 | 7,800,000 |
Ensayo SPT | 4 | 247,000 | 988,000 |
Informe Geotécnico y recomendaciones de construcción | 4 | 1,950,000 | 7,800,000 |
Valor Adicional: | 24,618,117 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 104000000 | 1 | 104,000,000 |
Imprevistos | 104000000 | 1 | 104,000,000 |
Utilidad | 104000000 | 1 | 104,000,000 |
Valor Adicional: | 312,000,000 |
| USD$49.73 |
| USD$12.11 |
| USD$26.85 |
| USD$52.79 |
| USD$26.52 |
| USD$7.14 |
| USD$45.57 |
| USD$22.19 |
| USD$8.42 |
| USD$135.93 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| USD$0.00 |
| USD$53.04 |
| USD$1.40 |
| USD$24.86 |
| USD$19.89 |
| USD$637.25 |
| USD$124.95 |
| USD$0.00 |
| USD$20.88 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.