| $91,000 |
| $149,900 |
| $130,000 |
| $50,700 |
| $52,000 |
| $102,700 |
| $149,100 |
| $100,100 |
| $117,000 |
| $260,000 |
| $81,350 |
| $91,000 |
| $208,000 |
| $107,900 |
| $50,500 |
| $697,600 |
| $325,000 |
| $780,000 |
| $40,150 |
| $128,550 |
| $370,000 |
| $107,700 |
| $29,950 |
| $292,500 |
| $28,250 |
| $124,800 |
| $82,700 |
| $497,000 |
| $90,300 |
| $34,500 |
| $286,000 |
| $143,300 |
| $380,000 |
| $107,900 |
| $195,000 |
| $75,400 |
| $35,700 |
| $1,346,500 |
| $325,000 |
| $81,500 |
| $65,000 |
| $97,500 |
| $125,500 |
| $312,000 |
| $3,120,000 |
| $260,000 |
| $390,000 |
| $156,000 |
| $178,500 |
| $576,000 |
| $884,910 |
| $120,000 |
| $273,000 |
| $268,700 |
| $650,000 |
| $28,250 |
| $113,000 |
| $455,360 |
| $98,000 |
| $102,500 |
| $735,000 |
| $13,000 |
| $537,400 |
| $40,079 |
| $228,000 |
| $395,000 |
| $1,170,000 |
| $269,000 |
| $70,700 |
| $520,000 |
| $1,469,000 |
| $97,500 |
| $105,300 |
| $50,000 |
| $150,900 |
| $650,000 |
| $97,500 |
| $208,000 |
| $77,777,777 |
| $416,000 |
| $102,700 |
| $88,600 |
| $50,000 |
| $143,000 |
| $809,078,876 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 836 | 3,900 | 3,260,400 |
Salario mínimo mensual vigente, base | 2.508 | 1,300,000 | 3,260,400 |
Levantamiento topográfico hasta 1,000 m2 | 4 | 2,600,000 | 10,400,000 |
Salario mínimo mensual vigente, base | 8 | 1,300,000 | 10,400,000 |
Replanteo Arquitectónico X 1 m2 | 836 | 10,038 | 8,391,472 |
Cuerda de Nylon 100 m x 0,50 mm | 41.8 | 50,900 | 2,127,620 |
Estaca de Madera Ø=0.05 L=0.60 m | 418 | 6,100 | 2,549,800 |
| 8.36 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 13.7104 | 24,504 | 335,965 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 137.8564 | 24,504 | 3,378,087 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 836 | 28,597 | 23,907,209 |
Salario diario vigente | 551.76 | 43,329 | 23,907,209 |
Estudio de suelos y geotecnia desde | 4 | 4,147,000 | 16,588,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 12 | 650,000 | 7,800,000 |
Ensayo SPT | 4 | 247,000 | 988,000 |
Informe Geotécnico y recomendaciones de construcción | 4 | 1,950,000 | 7,800,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 4 | 11,001 | 44,005 |
Salario diario vigente | 1.0156 | 43,329 | 44,005 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 836 | 13,520 | 11,302,720 |
Diseño hidráulico de edificio x 1 m2 | 836 | 6,760 | 5,651,360 |
Diseño sanitario de edificio x 1 m2, servicio | 836 | 6,760 | 5,651,360 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 836 | 16,000 | 13,376,000 |
Valor Adicional: | 87,269,806 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 40 | 58,492 | 2,339,679 |
Cuadrilla de albañileria x 1 Hora | 8.68 | 24,504 | 212,698 |
Cuadrilla de albañileria x 1 Hora | 86.8 | 24,504 | 2,126,981 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 2,339,679 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 12 | 484,450 | 5,813,400 |
Punto agua fria PVC 1/2" | 72 | 44,047 | 3,171,348 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 14.4 | 20,300 | 292,320 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 3.6 | 30,700 | 110,520 |
Codo PVC 90° presión de 1/2" x 10 unidades | 7.2 | 45,000 | 324,000 |
Soldadura para PVC 1/4 de galón | 2.88 | 53,500 | 154,080 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 1.08 | 77,000 | 83,160 |
Instalación carpintería metálica x 1 m2 | 95.976 | 20,907 | 2,006,608 |
Instalación carpintería metálica x 1 m2 | 9.5976 | 20,907 | 200,661 |
Tubo 1" x 6 m RDE 13.5 | 60 | 63,000 | 3,780,000 |
Valor Adicional: | 12,764,748 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 12 | 1,077,612 | 12,931,342 |
Sanitario One Piece Galio Blanco | 12 | 974,000 | 11,688,000 |
Instalación de aparatos sanitarios x unidad | 12 | 103,612 | 1,243,342 |
Punto desagüe sanitario pvc 4" | 60 | 68,312 | 4,098,724 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 10.2 | 78,000 | 795,600 |
Cuadrilla de albañileria x 1 Hora | 120 | 24,504 | 2,940,527 |
Limpiador para PVC 1/4 de galón | 2.256 | 99,000 | 223,344 |
Soldadura para PVC DE 1/4 de Galón | 1.878 | 74,150 | 139,254 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 16 | 207,000 | 3,312,000 |
Tubería PVC sanitaria 4" | 40 | 156,100 | 6,244,000 |
Valor Adicional: | 26,586,066 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 24 | 492,210 | 11,813,040 |
Agua para la obra 1 litro | 4296 | 36 | 156,374 |
Arena lavada de río 1 m3 | 18.144 | 95,019 | 1,724,025 |
Cemento 1 Kg | 7560 | 798 | 6,032,880 |
Triturado de 3/4" x 1 m3 | 18.144 | 150,500 | 2,730,672 |
Mezcladora 1 bulto, alquiler x hora | 24 | 7,150 | 171,600 |
Cuadrilla 7 (8 obreros) x jornal | 1.68 | 578,347 | 971,623 |
Oficial de construcción x hora | 1.68 | 15,397 | 25,866 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 32 | 818,067 | 26,178,147 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 32 | 533,055 | 17,057,768 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 94.72 | 13,000 | 1,231,360 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 4.8 | 155,000 | 744,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 11.52 | 10,000 | 115,200 |
| 41.92 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 260.8 | 24,504 | 6,390,745 |
Cuadrilla de albañileria x 1 Hora | 26.08 | 24,504 | 639,074 |
Acero G-60 x 1 Kg | 2400 | 5,200 | 12,480,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 56 | 533,055 | 29,851,095 |
Arena lavada de río 1 m3 | 32.928 | 95,019 | 3,128,786 |
Cemento 1 Kg | 20580 | 798 | 16,422,840 |
Triturado de 3/4" x 1 m3 | 49.392 | 150,500 | 7,433,496 |
Agua para la obra 1 litro | 11172 | 36 | 406,661 |
Mezcladora 1 bulto, alquiler x hora | 26.88 | 7,150 | 192,192 |
Cuadrilla 7 (8 obreros) x jornal | 3.92 | 578,347 | 2,267,120 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 8 | 858,441 | 6,867,526 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 8 | 533,055 | 4,264,442 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.08 | 155,000 | 12,400 |
Durmiente ordinario 0,04x0.04x3,00 m. | 8 | 30,000 | 240,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 8 | 36,500 | 292,000 |
Vara clavo 3m | 1.36 | 20,100 | 27,336 |
Cuadrilla de albañileria x 1 Hora | 72 | 24,504 | 1,764,316 |
Cuadrilla de albañileria x 1 Hora | 7.2 | 24,504 | 176,432 |
Vibrador eléctrico de aguja para concreto x hora | 12 | 7,550 | 90,600 |
Valor Adicional: | 87,189,808 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 972 | 232,618 | 226,104,606 |
Sistema, Panel x 1 m2 x 0.04 m | 1020.6 | 56,500 | 57,663,900 |
Malla plana RG2 | 388.8 | 5,350 | 2,080,080 |
Malla RGU 80 | 486 | 6,500 | 3,159,000 |
Malla angular RG1 | 486 | 6,700 | 3,256,200 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 53.46 | 473,449 | 25,310,594 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 250.776 | 31,013 | 7,777,266 |
Cuadrilla de instalaciones x 1 Hora | 146.5776 | 26,955 | 3,950,974 |
Cuadrilla de instalaciones x 1 Hora | 1465.776 | 26,955 | 39,509,740 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4860 | 5,200 | 25,272,000 |
Transporte 1 tonelada x 1 kilómetro | 38.88 | 3,900 | 151,632 |
Muro panel doble cara x 1 m2 | 97.2 | 232,618 | 22,610,461 |
Muro panel doble cara x 1 m2 | 97.2 | 232,618 | 22,610,461 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 6.2208 | 232,618 | 1,447,069 |
Valor Adicional: | 226,104,606 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 800 | 90,690 | 72,551,932 |
Acero G-60 x 1 Kg | 7920 | 5,200 | 41,184,000 |
Pintuco Anticorrosivo rojo | 144 | 95,000 | 13,680,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 96 | 34,650 | 3,326,400 |
Cuadrilla de albañileria x 1 Hora | 532.8 | 24,504 | 13,055,938 |
Cuadrilla de albañileria x 1 Hora | 53.28 | 24,504 | 1,305,594 |
Teja termoacustica x 1 m2, suministro e instalación | 912 | 198,448 | 180,984,837 |
Teja termoacústica 3 m x 0.78 m | 389.7888 | 393,120 | 153,233,773 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 189.9696 | 93,400 | 17,743,161 |
Andamio Tubular estandar con tijeras alquiler por día | 45.6 | 47,300 | 2,156,880 |
Cuadrilla de instalaciones x 1 Hora | 22.8 | 26,955 | 614,570 |
Cuadrilla de instalaciones x 1 Hora | 228 | 26,955 | 6,145,701 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 182.4 | 5,200 | 948,480 |
Transporte 1 tonelada x 1 kilómetro | 36.48 | 3,900 | 142,272 |
Valor Adicional: | 253,536,769 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 40 | 140,813 | 5,632,537 |
Cascarilla de arroz x bulto 45 Kg | 10 | 155,000 | 1,550,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 3 | 91,000 | 273,000 |
Plántula aguacate | 40 | 33,250 | 1,330,000 |
Tierra negra abonada x 1 m3 | 8 | 235,000 | 1,880,000 |
Pala redonda No. 4 mango plástico | 0.2 | 63,000 | 12,600 |
Cuadrilla de instalaciones x 1 Hora | 20 | 26,955 | 539,097 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 8 | 5,200 | 41,600 |
Transporte 1 tonelada x 1 kilómetro | 1.6 | 3,900 | 6,240 |
Valor Adicional: | 5,632,537 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 50800000 | 1 | 50,800,000 |
Valor Adicional: | 50,800,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 24800000 | 1 | 24,800,000 |
Valor Adicional: | 24,800,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 24800000 | 1 | 24,800,000 |
Valor Adicional: | 24,800,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 4712000 | 1 | 4,712,000 |
Valor Adicional: | 4,712,000 |
| $819,126,738 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 627 | 3,900 | 2,445,300 |
Salario mínimo mensual vigente, base | 1.881 | 1,300,000 | 2,445,300 |
Levantamiento topográfico hasta 1,000 m2 | 3 | 2,600,000 | 7,800,000 |
Salario mínimo mensual vigente, base | 6 | 1,300,000 | 7,800,000 |
Replanteo Arquitectónico X 1 m2 | 627 | 10,038 | 6,293,604 |
Cuerda de Nylon 100 m x 0,50 mm | 31.35 | 50,900 | 1,595,715 |
Estaca de Madera Ø=0.05 L=0.60 m | 313.5 | 6,100 | 1,912,350 |
| 6.27 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 10.2828 | 24,504 | 251,974 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 103.3923 | 24,504 | 2,533,565 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 627 | 28,597 | 17,930,407 |
Salario diario vigente | 413.82 | 43,329 | 17,930,407 |
Estudio de suelos y geotecnia desde | 3 | 4,147,000 | 12,441,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 9 | 650,000 | 5,850,000 |
Ensayo SPT | 3 | 247,000 | 741,000 |
Informe Geotécnico y recomendaciones de construcción | 3 | 1,950,000 | 5,850,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 3 | 11,001 | 33,004 |
Salario diario vigente | 0.7617 | 43,329 | 33,004 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 627 | 13,520 | 8,477,040 |
Diseño hidráulico de edificio x 1 m2 | 627 | 6,760 | 4,238,520 |
Diseño sanitario de edificio x 1 m2, servicio | 627 | 6,760 | 4,238,520 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 627 | 16,000 | 10,032,000 |
Valor Adicional: | 65,452,354 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 30 | 58,492 | 1,754,759 |
Cuadrilla de albañileria x 1 Hora | 6.51 | 24,504 | 159,524 |
Cuadrilla de albañileria x 1 Hora | 65.1 | 24,504 | 1,595,236 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 1,754,759 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 9 | 484,450 | 4,360,050 |
Punto agua fria PVC 1/2" | 54 | 44,047 | 2,378,511 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 10.8 | 20,300 | 219,240 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 2.7 | 30,700 | 82,890 |
Codo PVC 90° presión de 1/2" x 10 unidades | 5.4 | 45,000 | 243,000 |
Soldadura para PVC 1/4 de galón | 2.16 | 53,500 | 115,560 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.81 | 77,000 | 62,370 |
Instalación carpintería metálica x 1 m2 | 71.982 | 20,907 | 1,504,956 |
Instalación carpintería metálica x 1 m2 | 7.1982 | 20,907 | 150,496 |
Tubo 1" x 6 m RDE 13.5 | 45 | 63,000 | 2,835,000 |
Valor Adicional: | 9,573,561 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 9 | 1,077,612 | 9,698,507 |
Sanitario One Piece Galio Blanco | 9 | 974,000 | 8,766,000 |
Instalación de aparatos sanitarios x unidad | 9 | 103,612 | 932,507 |
Punto desagüe sanitario pvc 4" | 45 | 68,312 | 3,074,043 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 7.65 | 78,000 | 596,700 |
Cuadrilla de albañileria x 1 Hora | 90 | 24,504 | 2,205,395 |
Limpiador para PVC 1/4 de galón | 1.692 | 99,000 | 167,508 |
Soldadura para PVC DE 1/4 de Galón | 1.4085 | 74,150 | 104,440 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 12 | 207,000 | 2,484,000 |
Tubería PVC sanitaria 4" | 30 | 156,100 | 4,683,000 |
Valor Adicional: | 19,939,550 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 3 | 23,113 | 69,338 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 0.6 | 94,000 | 56,400 |
Cuadrilla de albañileria x 1 Hora | 0.48 | 24,504 | 11,762 |
Cuadrilla de albañileria x 1 Hora | 0.048 | 24,504 | 1,176 |
Interruptor sencillo cuatro vías. Suministro e instalación | 99 | 23,313 | 2,307,964 |
Interruptor sencillo cuatro vías x 5 unidades | 19.8 | 95,000 | 1,881,000 |
Cuadrilla de albañileria x 1 Hora | 15.84 | 24,504 | 388,150 |
Cuadrilla de albañileria x 1 Hora | 1.584 | 24,504 | 38,815 |
Panel de 80W para sistema de energía solar | 12 | 920,900 | 11,050,800 |
Inversor de voltaje 300W | 3 | 297,050 | 891,150 |
Caja de control sistema de energía solar | 3 | 1,018,750 | 3,056,250 |
Batería estacionaria 90 Amperios para sistema energía solar | 12 | 731,600 | 8,779,200 |
Tablero trifásico con puerta de 24 circuitos | 3 | 321,000 | 963,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 12 | 395,000 | 4,740,000 |
Valor Adicional: | 31,857,703 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 18 | 492,210 | 8,859,780 |
Agua para la obra 1 litro | 3222 | 36 | 117,281 |
Arena lavada de río 1 m3 | 13.608 | 95,019 | 1,293,019 |
Cemento 1 Kg | 5670 | 798 | 4,524,660 |
Triturado de 3/4" x 1 m3 | 13.608 | 150,500 | 2,048,004 |
Mezcladora 1 bulto, alquiler x hora | 18 | 7,150 | 128,700 |
Cuadrilla 7 (8 obreros) x jornal | 1.26 | 578,347 | 728,717 |
Oficial de construcción x hora | 1.26 | 15,397 | 19,400 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 24 | 818,067 | 19,633,611 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 24 | 533,055 | 12,793,326 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 71.04 | 13,000 | 923,520 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 3.6 | 155,000 | 558,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 8.64 | 10,000 | 86,400 |
| 31.44 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 195.6 | 24,504 | 4,793,058 |
Cuadrilla de albañileria x 1 Hora | 19.56 | 24,504 | 479,306 |
Acero G-60 x 1 Kg | 1800 | 5,200 | 9,360,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 42 | 533,055 | 22,388,321 |
Arena lavada de río 1 m3 | 24.696 | 95,019 | 2,346,589 |
Cemento 1 Kg | 15435 | 798 | 12,317,130 |
Triturado de 3/4" x 1 m3 | 37.044 | 150,500 | 5,575,122 |
Agua para la obra 1 litro | 8379 | 36 | 304,996 |
Mezcladora 1 bulto, alquiler x hora | 20.16 | 7,150 | 144,144 |
Cuadrilla 7 (8 obreros) x jornal | 2.94 | 578,347 | 1,700,340 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 6 | 858,441 | 5,150,644 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 6 | 533,055 | 3,198,332 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.06 | 155,000 | 9,300 |
Durmiente ordinario 0,04x0.04x3,00 m. | 6 | 30,000 | 180,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 6 | 36,500 | 219,000 |
Vara clavo 3m | 1.02 | 20,100 | 20,502 |
Cuadrilla de albañileria x 1 Hora | 54 | 24,504 | 1,323,237 |
Cuadrilla de albañileria x 1 Hora | 5.4 | 24,504 | 132,324 |
Vibrador eléctrico de aguja para concreto x hora | 9 | 7,550 | 67,950 |
Valor Adicional: | 65,392,356 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 729 | 232,618 | 169,578,455 |
Sistema, Panel x 1 m2 x 0.04 m | 765.45 | 56,500 | 43,247,925 |
Malla plana RG2 | 291.6 | 5,350 | 1,560,060 |
Malla RGU 80 | 364.5 | 6,500 | 2,369,250 |
Malla angular RG1 | 364.5 | 6,700 | 2,442,150 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 40.095 | 473,449 | 18,982,945 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 188.082 | 31,013 | 5,832,949 |
Cuadrilla de instalaciones x 1 Hora | 109.9332 | 26,955 | 2,963,230 |
Cuadrilla de instalaciones x 1 Hora | 1099.332 | 26,955 | 29,632,305 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 3645 | 5,200 | 18,954,000 |
Transporte 1 tonelada x 1 kilómetro | 29.16 | 3,900 | 113,724 |
Muro panel doble cara x 1 m2 | 72.9 | 232,618 | 16,957,845 |
Muro panel doble cara x 1 m2 | 72.9 | 232,618 | 16,957,845 |
Muro panel doble cara x 1 m2 | 36.45 | 232,618 | 8,478,923 |
Muro panel doble cara x 1 m2 | 4.6656 | 232,618 | 1,085,302 |
Valor Adicional: | 169,578,455 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 600 | 90,690 | 54,413,949 |
Acero G-60 x 1 Kg | 5940 | 5,200 | 30,888,000 |
Pintuco Anticorrosivo rojo | 108 | 95,000 | 10,260,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 72 | 34,650 | 2,494,800 |
Cuadrilla de albañileria x 1 Hora | 399.6 | 24,504 | 9,791,954 |
Cuadrilla de albañileria x 1 Hora | 39.96 | 24,504 | 979,195 |
Teja termoacustica x 1 m2, suministro e instalación | 684 | 198,448 | 135,738,627 |
Teja termoacústica 3 m x 0.78 m | 292.3416 | 393,120 | 114,925,330 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 142.4772 | 93,400 | 13,307,370 |
Andamio Tubular estandar con tijeras alquiler por día | 34.2 | 47,300 | 1,617,660 |
Cuadrilla de instalaciones x 1 Hora | 17.1 | 26,955 | 460,928 |
Cuadrilla de instalaciones x 1 Hora | 171 | 26,955 | 4,609,276 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 136.8 | 5,200 | 711,360 |
Transporte 1 tonelada x 1 kilómetro | 27.36 | 3,900 | 106,704 |
Valor Adicional: | 190,152,577 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Guardaescoba en ceramica porcelanato x 1m | 258 | 23,946 | 6,178,092 |
Agua para la obra 1 litro | 387 | 36 | 14,087 |
Arena lavada de río 1 m3 | 3.87 | 95,019 | 367,724 |
Pegacor max, 25 Kg, porcelanato | 6.45 | 85,500 | 551,475 |
Porcelanato sellado Beige x 1 m2 | 25.8 | 135,900 | 3,506,220 |
Cuadrilla de albañileria x 1 Hora | 64.5 | 24,504 | 1,580,533 |
Cuadrilla de albañileria x 1 Hora | 6.45 | 24,504 | 158,053 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 330 | 178,966 | 59,058,867 |
Agua para la obra 1 litro | 1155 | 36 | 42,042 |
Pegacor max, 25 Kg, porcelanato | 82.5 | 85,500 | 7,053,750 |
Porcelanato sellado Beige x 1 m2 | 330 | 135,900 | 44,847,000 |
Cuadrilla de albañileria x 1 Hora | 264 | 24,504 | 6,469,159 |
Cuadrilla de albañileria x 1 Hora | 26.4 | 24,504 | 646,916 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 10.8 | 1,574,907 | 17,009,000 |
Puerta en aluminio con vidrio templado de 6 mm x 1m2 | 21.6 | 777,000 | 16,783,200 |
Instalación carpintería metálica x 1 m2 | 10.8 | 20,907 | 225,800 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 45 | 340,807 | 15,336,332 |
Ventana corrediza aluminio anodizado con vidrios x 1m2 | 45 | 319,900 | 14,395,500 |
Instalación carpintería metálica x 1 m2 | 45 | 20,907 | 940,832 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1020 | 12,828 | 13,084,764 |
Intervinil 5 galones, vinilo tipo 2 | 10.2 | 230,000 | 2,346,000 |
Cuadrilla de pintura x 1 hora | 22.44 | 38,563 | 865,349 |
Cuadrilla de pintura x 1 hora | 224.4 | 38,563 | 8,653,495 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 204 | 5,200 | 1,060,800 |
Transporte 1 tonelada x 1 kilómetro | 40.8 | 3,900 | 159,120 |
Geomembrana Instalación x 1 m2 | 360 | 13,477 | 4,851,869 |
Cuadrilla de albañileria x 1 Hora | 18 | 24,504 | 441,079 |
Cuadrilla de albañileria x 1 Hora | 180 | 24,504 | 4,410,790 |
Cepillera Attica | 9 | 28,850 | 259,650 |
Espejo de 2mm de espesor *1 m2 | 9 | 93,700 | 843,300 |
Argolla toalla attica | 9 | 36,250 | 326,250 |
División de baño corrediza | 9 | 550,000 | 4,950,000 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 3 | 505,085 | 1,515,255 |
Puerta de triplex | 24 | 342,450 | 8,218,800 |
Valor Adicional: | 131,632,179 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 30 | 140,813 | 4,224,402 |
Cascarilla de arroz x bulto 45 Kg | 7.5 | 155,000 | 1,162,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 2.25 | 91,000 | 204,750 |
Plántula aguacate | 30 | 33,250 | 997,500 |
Tierra negra abonada x 1 m3 | 6 | 235,000 | 1,410,000 |
Pala redonda No. 4 mango plástico | 0.15 | 63,000 | 9,450 |
Cuadrilla de instalaciones x 1 Hora | 15 | 26,955 | 404,322 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 6 | 5,200 | 31,200 |
Transporte 1 tonelada x 1 kilómetro | 1.2 | 3,900 | 4,680 |
Valor Adicional: | 4,224,402 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 50100000 | 1 | 50,100,000 |
Valor Adicional: | 50,100,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 48600000 | 1 | 48,600,000 |
Valor Adicional: | 48,600,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 24300000 | 1 | 24,300,000 |
Valor Adicional: | 24,300,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 4661700 | 1 | 4,661,700 |
Valor Adicional: | 4,661,700 |
| $654,000 |
| $5,561,000 |
| $87,000 |
| $0 |
| $0 |
| $3,897,405 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa nueva de 1 planta y 209 m2 presupuesto de construcción | 0.014274 | 273,042,246 | 3,897,405 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 2.983266 | 3,900 | 11,635 |
Levantamiento topográfico hasta 1,000 m2 | 0.014274 | 2,600,000 | 37,112 |
Replanteo Arquitectónico X 1 m2 | 2.983266 | 10,038 | 29,945 |
Diseño arquitectónico de casa personalizada x 1 m2 | 2.983266 | 28,597 | 85,313 |
Estudio de suelos y geotecnia desde | 0.014274 | 4,147,000 | 59,194 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.014274 | 11,001 | 157 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 2.983266 | 13,520 | 40,334 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 2.983266 | 16,000 | 47,732 |
Excavación manual en conglomerado x 1 m3 | 0.14274 | 58,492 | 8,349 |
Kit Mueble para baño + lavamanos | 0.042822 | 484,450 | 20,745 |
Punto agua fria PVC 1/2" | 0.256932 | 44,047 | 11,317 |
Tubo 1" x 6 m RDE 13.5 | 0.21411 | 63,000 | 13,489 |
Sanitario suministro e instalación | 0.042822 | 1,077,612 | 46,145 |
Punto desagüe sanitario pvc 4" | 0.21411 | 68,312 | 14,626 |
Caja de inspección y distribución | 0.057096 | 207,000 | 11,819 |
Tubería PVC sanitaria 4" | 0.14274 | 156,100 | 22,282 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.014274 | 23,113 | 330 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.471042 | 23,313 | 10,981 |
Panel de 80W para sistema de energía solar | 0.057096 | 920,900 | 52,580 |
Inversor de voltaje 300W | 0.014274 | 297,050 | 4,240 |
Caja de control sistema de energía solar | 0.014274 | 1,018,750 | 14,542 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.057096 | 731,600 | 41,771 |
Tablero trifásico con puerta de 24 circuitos | 0.014274 | 321,000 | 4,582 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.057096 | 395,000 | 22,553 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.085644 | 492,210 | 42,155 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.114192 | 818,067 | 93,417 |
Acero G-60 x 1 Kg | 8.5644 | 5,200 | 44,535 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.199836 | 533,055 | 106,524 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.028548 | 858,441 | 24,507 |
Muro panel doble cara x 1 m2 | 3.468582 | 232,618 | 806,854 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 2.8548 | 90,690 | 258,902 |
Teja termoacustica x 1 m2, suministro e instalación | 3.254472 | 198,448 | 645,844 |
Guardaescoba en ceramica porcelanato x 1m | 1.227564 | 23,946 | 29,395 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 1.57014 | 178,966 | 281,002 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 0.0513864 | 1,574,907 | 80,929 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 0.21411 | 340,807 | 72,970 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 4.85316 | 12,828 | 62,257 |
Geomembrana Instalación x 1 m2 | 1.71288 | 13,477 | 23,085 |
Cepillera Attica | 0.042822 | 28,850 | 1,235 |
Espejo de 2mm de espesor *1 m2 | 0.042822 | 93,700 | 4,012 |
Argolla toalla attica | 0.042822 | 36,250 | 1,552 |
División de baño corrediza | 0.042822 | 550,000 | 23,552 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 0.014274 | 505,085 | 7,210 |
Puerta de triplex | 0.114192 | 342,450 | 39,105 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.14274 | 140,813 | 20,100 |
Aseo general para entrega de obra x metro cuadrado | 2.983266 | 3,042 | 9,074 |
Administración | 238375.8 | 1 | 238,376 |
Imprevistos | 231238.8 | 1 | 231,239 |
Utilidad | 115619.4 | 1 | 115,619 |
Unidad Monetaria | 22180.3686 | 1 | 22,180 |
Valor Adicional: | 3,897,405 |
| $88,850 |
| $139,700 |
| $84,000 |
| $409,500 |
| $6,550,000 |
| $45,750 |
| $7,650,000 |
| $1,430,000 |
| $82,850 |
| $418,000 |
| $3,946,500 |
| $239,714,010 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 200 | 3,900 | 780,000 |
Salario mínimo mensual vigente, base | 0.6 | 1,300,000 | 780,000 |
| 0 | 0 | 0 |
4655" target="_blank"> | 2 | 0 | 0 |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 200 | 28,597 | 5,719,428 |
Salario diario vigente | 132 | 43,329 | 5,719,428 |
Estudio de suelos y geotecnia desde | 2 | 4,147,000 | 8,294,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 6 | 650,000 | 3,900,000 |
Ensayo SPT | 2 | 247,000 | 494,000 |
Informe Geotécnico y recomendaciones de construcción | 2 | 1,950,000 | 3,900,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 2 | 11,001 | 22,002 |
Salario diario vigente | 0.5078 | 43,329 | 22,002 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 200 | 13,520 | 2,704,000 |
Diseño hidráulico de edificio x 1 m2 | 200 | 6,760 | 1,352,000 |
Diseño sanitario de edificio x 1 m2, servicio | 200 | 6,760 | 1,352,000 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 200 | 16,000 | 3,200,000 |
Valor Adicional: | 22,726,960 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Punto desagüe sanitario pvc 4" | 30 | 68,312 | 2,049,362 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 5.1 | 78,000 | 397,800 |
Cuadrilla de albañileria x 1 Hora | 60 | 24,504 | 1,470,263 |
Limpiador para PVC 1/4 de galón | 1.128 | 99,000 | 111,672 |
Soldadura para PVC DE 1/4 de Galón | 0.939 | 74,150 | 69,627 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 2,049,362 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Panel de 80W para sistema de energía solar | 8 | 920,900 | 7,367,200 |
Inversor de voltaje 300W | 2 | 297,050 | 594,100 |
Caja de control sistema de energía solar | 2 | 1,018,750 | 2,037,500 |
Batería estacionaria 90 Amperios para sistema energía solar | 8 | 731,600 | 5,852,800 |
Valor Adicional: | 15,851,600 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 1200 | 5,200 | 6,240,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 28 | 533,055 | 14,925,547 |
Arena lavada de río 1 m3 | 16.464 | 95,019 | 1,564,393 |
Cemento 1 Kg | 10290 | 798 | 8,211,420 |
Triturado de 3/4" x 1 m3 | 24.696 | 150,500 | 3,716,748 |
Agua para la obra 1 litro | 5586 | 36 | 203,330 |
Mezcladora 1 bulto, alquiler x hora | 13.44 | 7,150 | 96,096 |
Cuadrilla 7 (8 obreros) x jornal | 1.96 | 578,347 | 1,133,560 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4 | 858,441 | 3,433,763 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 4 | 533,055 | 2,132,221 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.04 | 155,000 | 6,200 |
Durmiente ordinario 0,04x0.04x3,00 m. | 4 | 30,000 | 120,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 4 | 36,500 | 146,000 |
Vara clavo 3m | 0.68 | 20,100 | 13,668 |
Cuadrilla de albañileria x 1 Hora | 36 | 24,504 | 882,158 |
Cuadrilla de albañileria x 1 Hora | 3.6 | 24,504 | 88,216 |
Vibrador eléctrico de aguja para concreto x hora | 6 | 7,550 | 45,300 |
Valor Adicional: | 24,599,310 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 340 | 153,842 | 52,306,143 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 253.198 | 83,900 | 21,243,312 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 1.7 | 135,750 | 230,775 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 91.8 | 32,100 | 2,946,780 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 278.8 | 25,500 | 7,109,400 |
Cuadrilla de carpintería por hora | 28.322 | 38,130 | 1,079,904 |
Cuadrilla de carpintería por hora | 283.322 | 38,130 | 10,802,932 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 1700 | 5,200 | 8,840,000 |
Transporte 1 tonelada x 1 kilómetro | 13.6 | 3,900 | 53,040 |
Valor Adicional: | 52,306,143 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Teja termoacustica x 1 m2, suministro e instalación | 220 | 198,448 | 43,658,623 |
Teja termoacústica 3 m x 0.78 m | 94.028 | 393,120 | 36,964,287 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 45.826 | 93,400 | 4,280,148 |
Andamio Tubular estandar con tijeras alquiler por día | 11 | 47,300 | 520,300 |
Cuadrilla de instalaciones x 1 Hora | 5.5 | 26,955 | 148,252 |
Cuadrilla de instalaciones x 1 Hora | 55 | 26,955 | 1,482,516 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 44 | 5,200 | 228,800 |
Transporte 1 tonelada x 1 kilómetro | 8.8 | 3,900 | 34,320 |
Valor Adicional: | 43,658,623 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 0 | 99,900,000 | 0 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 680 | 12,828 | 8,723,176 |
Intervinil 5 galones, vinilo tipo 2 | 6.8 | 230,000 | 1,564,000 |
Cuadrilla de pintura x 1 hora | 14.96 | 38,563 | 576,900 |
Cuadrilla de pintura x 1 hora | 149.6 | 38,563 | 5,768,996 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 136 | 5,200 | 707,200 |
Transporte 1 tonelada x 1 kilómetro | 27.2 | 3,900 | 106,080 |
Geomembrana Instalación x 1 m2 | 240 | 13,477 | 3,234,579 |
Cuadrilla de albañileria x 1 Hora | 12 | 24,504 | 294,053 |
Cuadrilla de albañileria x 1 Hora | 120 | 24,504 | 2,940,527 |
Cepillera Attica | 6 | 28,850 | 173,100 |
Espejo de 2mm de espesor *1 m2 | 6 | 93,700 | 562,200 |
Argolla toalla attica | 6 | 36,250 | 217,500 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 60 | 141,747 | 8,504,799 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 60 | 130,000 | 7,800,000 |
Silicona transparente con fungicida 11 Onzas | 5.46 | 39,050 | 213,213 |
Cuadrilla de albañileria x 1 Hora | 15 | 24,504 | 367,566 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 22.05 | 5,200 | 114,660 |
Transporte 1 tonelada x 1 kilómetro | 2.4 | 3,900 | 9,360 |
Valor Adicional: | 21,415,354 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 20 | 140,813 | 2,816,268 |
Cascarilla de arroz x bulto 45 Kg | 5 | 155,000 | 775,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 1.5 | 91,000 | 136,500 |
Plántula aguacate | 20 | 33,250 | 665,000 |
Tierra negra abonada x 1 m3 | 4 | 235,000 | 940,000 |
Pala redonda No. 4 mango plástico | 0.1 | 63,000 | 6,300 |
Cuadrilla de instalaciones x 1 Hora | 10 | 26,955 | 269,548 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4 | 5,200 | 20,800 |
Transporte 1 tonelada x 1 kilómetro | 0.8 | 3,900 | 3,120 |
Valor Adicional: | 2,816,268 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 20000000 | 1 | 20,000,000 |
Valor Adicional: | 20,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 20000000 | 1 | 20,000,000 |
Valor Adicional: | 20,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 11600000 | 1 | 11,600,000 |
Valor Adicional: | 11,600,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 1900000 | 1 | 1,900,000 |
Valor Adicional: | 1,900,000 |
| $259,000 |
| $3,868,320 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00029936038 | 12,921,951,720 | 3,868,320 |
Terreno, predio, lote precio por 1m2 | 0.74840095 | 1,000,000 | 748,401 |
Levantamiento topográfico hasta 1,000 m2 | 0.00059872076 | 2,600,000 | 1,557 |
Replanteo Arquitectónico X 1 m2 | 2.4442775027 | 10,038 | 24,535 |
Diseño arquitectónico de edificios x 1 m2 | 2.4442775027 | 14,000 | 34,220 |
Estudio de suelos y geotecnia desde | 0.00119744152 | 4,147,000 | 4,966 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 2.4442775027 | 10,400 | 25,420 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 2.4442775027 | 13,520 | 33,047 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 2.4442775027 | 16,000 | 39,108 |
Excavación mecánica en conglomerado x 1 m3 | 2.19850263072 | 4,551 | 10,006 |
Piloteadora, alquiler por Hora | 0.0239488304 | 390,000 | 9,340 |
Acero G-60 x 1 Kg | 122.86767820492 | 5,200 | 638,912 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.63793696978 | 533,055 | 340,056 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.09968700654 | 858,441 | 85,575 |
Steel deck metaldeck grado 40 | 0.48885550054 | 451,000 | 220,474 |
Kit Mueble para baño + lavamanos | 0.0359232456 | 484,450 | 17,403 |
Punto agua fria PVC 1/2" | 0.2155394736 | 44,047 | 9,494 |
Tubo 1" x 6 m RDE 13.5 | 0.179616228 | 63,000 | 11,316 |
Sanitario suministro e instalación | 0.0359232456 | 1,077,612 | 38,711 |
Punto desagüe sanitario pvc 4" | 0.179616228 | 68,312 | 12,270 |
Caja de inspección y distribución | 0.0478976608 | 207,000 | 9,915 |
Tubería PVC sanitaria 4" | 0.119744152 | 156,100 | 18,692 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.0119744152 | 23,113 | 277 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.3951557016 | 23,313 | 9,212 |
Panel de 80W para sistema de energía solar | 0.0478976608 | 920,900 | 44,109 |
Inversor de voltaje 300W | 0.0119744152 | 297,050 | 3,557 |
Caja de control sistema de energía solar | 0.0119744152 | 1,018,750 | 12,199 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.0478976608 | 731,600 | 35,042 |
Tablero trifásico con puerta de 24 circuitos | 0.0119744152 | 321,000 | 3,844 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.0478976608 | 395,000 | 18,920 |
Muro drywall doble cara x 1 m2 | 1.5506867684 | 153,842 | 238,560 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 1.556673976 | 178,966 | 278,592 |
Ascensor 8 personas | 0.00059872076 | 99,900,000 | 59,812 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 3.023539838 | 12,828 | 38,787 |
Geomembrana Instalación x 1 m2 | 0.89808114 | 13,477 | 12,104 |
Cepillera Attica | 0.029936038 | 28,850 | 864 |
Espejo de 2mm de espesor *1 m2 | 0.059872076 | 93,700 | 5,610 |
Argolla toalla attica | 0.029936038 | 36,250 | 1,085 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 3.786908807 | 141,747 | 536,782 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0029936038 | 140,813 | 422 |
Administración | 94042.26721472 | 1 | 94,042 |
Imprevistos | 47042.68755472 | 1 | 47,043 |
Utilidad | 94042.26721472 | 1 | 94,042 |
Valor Adicional: | 3,868,320 |
| $47,000 |
| $32,550 |
| $41,400 |
| $49,700 |
| $67,950 |
| $18,850,900 |
| $1,527,450 |
| $56,900 |
| $42,700 |
| $179,000 |
| $130,000 |
| $30,200 |
| $7,720,000 |
| $73,950 |
| $4,500,000 |
| $221,150 |
| $65,650 |
| $0 |
| $368,000 |
| $25,843,903,440 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 5000 | 1,000,000 | 5,000,000,000 |
Valor Adicional: | 5,000,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 4 | 2,600,000 | 10,400,000 |
Salario mínimo mensual vigente, base | 8 | 1,300,000 | 10,400,000 |
Replanteo Arquitectónico X 1 m2 | 16330 | 10,038 | 163,914,754 |
Cuerda de Nylon 100 m x 0,50 mm | 816.5 | 50,900 | 41,559,850 |
Estaca de Madera Ø=0.05 L=0.60 m | 8165 | 6,100 | 49,806,500 |
| 163.3 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 267.812 | 24,504 | 6,562,569 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 2692.817 | 24,504 | 65,985,835 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 16330 | 14,000 | 228,620,000 |
Estudio de suelos y geotecnia desde | 8 | 4,147,000 | 33,176,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 24 | 650,000 | 15,600,000 |
Ensayo SPT | 8 | 247,000 | 1,976,000 |
Informe Geotécnico y recomendaciones de construcción | 8 | 1,950,000 | 15,600,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 16330 | 10,400 | 169,832,000 |
Salario mínimo mensual vigente, base | 130.64 | 1,300,000 | 169,832,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 16330 | 13,520 | 220,781,600 |
Diseño hidráulico de edificio x 1 m2 | 16330 | 6,760 | 110,390,800 |
Diseño sanitario de edificio x 1 m2, servicio | 16330 | 6,760 | 110,390,800 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 16330 | 16,000 | 261,280,000 |
Valor Adicional: | 1,088,004,354 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 14688 | 4,551 | 66,848,760 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 367.2 | 182,050 | 66,848,760 |
Piloteadora, alquiler por Hora | 160 | 390,000 | 62,400,000 |
Salario mínimo mensual vigente, base | 48 | 1,300,000 | 62,400,000 |
Valor Adicional: | 129,248,760 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 820868 | 5,200 | 4,268,513,600 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 4262 | 533,055 | 2,271,881,523 |
Arena lavada de río 1 m3 | 2506.056 | 95,019 | 238,122,935 |
Cemento 1 Kg | 1566285 | 798 | 1,249,895,430 |
Triturado de 3/4" x 1 m3 | 3759.084 | 150,500 | 565,742,153 |
Agua para la obra 1 litro | 850269 | 36 | 30,949,792 |
Mezcladora 1 bulto, alquiler x hora | 2045.76 | 7,150 | 14,627,184 |
Cuadrilla 7 (8 obreros) x jornal | 298.34 | 578,347 | 172,544,029 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 666 | 858,441 | 571,721,514 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 666 | 533,055 | 355,014,804 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 6.66 | 155,000 | 1,032,300 |
Durmiente ordinario 0,04x0.04x3,00 m. | 666 | 30,000 | 19,980,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 666 | 36,500 | 24,309,000 |
Vara clavo 3m | 113.22 | 20,100 | 2,275,722 |
Cuadrilla de albañileria x 1 Hora | 5994 | 24,504 | 146,879,308 |
Cuadrilla de albañileria x 1 Hora | 599.4 | 24,504 | 14,687,931 |
Vibrador eléctrico de aguja para concreto x hora | 999 | 7,550 | 7,542,450 |
Steel deck metaldeck grado 40 | 3266 | 451,000 | 1,472,966,000 |
Valor Adicional: | 8,585,082,638 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 240 | 484,450 | 116,268,000 |
Punto agua fria PVC 1/2" | 1440 | 44,047 | 63,426,966 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 288 | 20,300 | 5,846,400 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 72 | 30,700 | 2,210,400 |
Codo PVC 90° presión de 1/2" x 10 unidades | 144 | 45,000 | 6,480,000 |
Soldadura para PVC 1/4 de galón | 57.6 | 53,500 | 3,081,600 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 21.6 | 77,000 | 1,663,200 |
Instalación carpintería metálica x 1 m2 | 1919.52 | 20,907 | 40,132,151 |
Instalación carpintería metálica x 1 m2 | 191.952 | 20,907 | 4,013,215 |
Tubo 1" x 6 m RDE 13.5 | 1200 | 63,000 | 75,600,000 |
Valor Adicional: | 255,294,966 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 240 | 1,077,612 | 258,626,841 |
Sanitario One Piece Galio Blanco | 240 | 974,000 | 233,760,000 |
Instalación de aparatos sanitarios x unidad | 240 | 103,612 | 24,866,841 |
Punto desagüe sanitario pvc 4" | 1200 | 68,312 | 81,974,488 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 204 | 78,000 | 15,912,000 |
Cuadrilla de albañileria x 1 Hora | 2400 | 24,504 | 58,810,534 |
Limpiador para PVC 1/4 de galón | 45.12 | 99,000 | 4,466,880 |
Soldadura para PVC DE 1/4 de Galón | 37.56 | 74,150 | 2,785,074 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 320 | 207,000 | 66,240,000 |
Tubería PVC sanitaria 4" | 800 | 156,100 | 124,880,000 |
Valor Adicional: | 531,721,329 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 80 | 23,113 | 1,849,022 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 16 | 94,000 | 1,504,000 |
Cuadrilla de albañileria x 1 Hora | 12.8 | 24,504 | 313,656 |
Cuadrilla de albañileria x 1 Hora | 1.28 | 24,504 | 31,366 |
Interruptor sencillo cuatro vías. Suministro e instalación | 2640 | 23,313 | 61,545,719 |
Interruptor sencillo cuatro vías x 5 unidades | 528 | 95,000 | 50,160,000 |
Cuadrilla de albañileria x 1 Hora | 422.4 | 24,504 | 10,350,654 |
Cuadrilla de albañileria x 1 Hora | 42.24 | 24,504 | 1,035,065 |
Panel de 80W para sistema de energía solar | 320 | 920,900 | 294,688,000 |
Inversor de voltaje 300W | 80 | 297,050 | 23,764,000 |
Caja de control sistema de energía solar | 80 | 1,018,750 | 81,500,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 320 | 731,600 | 234,112,000 |
Tablero trifásico con puerta de 24 circuitos | 80 | 321,000 | 25,680,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 320 | 395,000 | 126,400,000 |
Valor Adicional: | 849,538,741 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 10360 | 153,842 | 1,593,798,955 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 7715.092 | 83,900 | 647,296,219 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 51.8 | 135,750 | 7,031,850 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 2797.2 | 32,100 | 89,790,120 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 8495.2 | 25,500 | 216,627,600 |
Cuadrilla de carpintería por hora | 862.988 | 38,130 | 32,905,318 |
Cuadrilla de carpintería por hora | 8632.988 | 38,130 | 329,171,689 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 51800 | 5,200 | 269,360,000 |
Transporte 1 tonelada x 1 kilómetro | 414.4 | 3,900 | 1,616,160 |
Valor Adicional: | 1,593,798,955 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 10400 | 178,966 | 1,861,249,128 |
Agua para la obra 1 litro | 36400 | 36 | 1,324,960 |
Pegacor max, 25 Kg, porcelanato | 2600 | 85,500 | 222,300,000 |
Porcelanato sellado Beige x 1 m2 | 10400 | 135,900 | 1,413,360,000 |
Cuadrilla de albañileria x 1 Hora | 8320 | 24,504 | 203,876,516 |
Cuadrilla de albañileria x 1 Hora | 832 | 24,504 | 20,387,652 |
Ascensor 8 personas | 4 | 99,900,000 | 399,600,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 20200 | 12,828 | 259,129,640 |
Intervinil 5 galones, vinilo tipo 2 | 202 | 230,000 | 46,460,000 |
Cuadrilla de pintura x 1 hora | 444.4 | 38,563 | 17,137,313 |
Cuadrilla de pintura x 1 hora | 4444 | 38,563 | 171,373,128 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4040 | 5,200 | 21,008,000 |
Transporte 1 tonelada x 1 kilómetro | 808 | 3,900 | 3,151,200 |
Geomembrana Instalación x 1 m2 | 6000 | 13,477 | 80,864,484 |
Cuadrilla de albañileria x 1 Hora | 300 | 24,504 | 7,351,317 |
Cuadrilla de albañileria x 1 Hora | 3000 | 24,504 | 73,513,167 |
Cepillera Attica | 200 | 28,850 | 5,770,000 |
Espejo de 2mm de espesor *1 m2 | 400 | 93,700 | 37,480,000 |
Argolla toalla attica | 200 | 36,250 | 7,250,000 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 25300 | 141,747 | 3,586,190,177 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 25300 | 130,000 | 3,289,000,000 |
Silicona transparente con fungicida 11 Onzas | 2302.3 | 39,050 | 89,904,815 |
Cuadrilla de albañileria x 1 Hora | 6325 | 24,504 | 154,990,260 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 9297.75 | 5,200 | 48,348,300 |
Transporte 1 tonelada x 1 kilómetro | 1012 | 3,900 | 3,946,800 |
Valor Adicional: | 6,237,533,429 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 20 | 140,813 | 2,816,268 |
Cascarilla de arroz x bulto 45 Kg | 5 | 155,000 | 775,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 1.5 | 91,000 | 136,500 |
Plántula aguacate | 20 | 33,250 | 665,000 |
Tierra negra abonada x 1 m3 | 4 | 235,000 | 940,000 |
Pala redonda No. 4 mango plástico | 0.1 | 63,000 | 6,300 |
Cuadrilla de instalaciones x 1 Hora | 10 | 26,955 | 269,548 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4 | 5,200 | 20,800 |
Transporte 1 tonelada x 1 kilómetro | 0.8 | 3,900 | 3,120 |
Valor Adicional: | 2,816,268 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 628288000 | 1 | 628,288,000 |
Valor Adicional: | 628,288,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 314288000 | 1 | 314,288,000 |
Valor Adicional: | 314,288,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 628288000 | 1 | 628,288,000 |
Valor Adicional: | 628,288,000 |
| $6,000,000 |
| $40,250 |
| $43,329 |
| $91,750 |
| $190,000 |
| $38,450 |
| $41,400 |
| $10,038 |
| $1,696,200 |
| $100,000,000,000 |
| $1,560,000 |
| $32,048,085,296 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 6400 | 1,000,000 | 6,400,000,000 |
Valor Adicional: | 6,400,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 5 | 2,600,000 | 13,000,000 |
Salario mínimo mensual vigente, base | 10 | 1,300,000 | 13,000,000 |
Replanteo Arquitectónico X 1 m2 | 24495 | 10,038 | 245,872,131 |
Cuerda de Nylon 100 m x 0,50 mm | 1224.75 | 50,900 | 62,339,775 |
Estaca de Madera Ø=0.05 L=0.60 m | 12247.5 | 6,100 | 74,709,750 |
| 244.95 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 401.718 | 24,504 | 9,843,854 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 4039.2255 | 24,504 | 98,978,753 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 24495 | 14,000 | 342,930,000 |
Estudio de suelos y geotecnia desde | 10 | 4,147,000 | 41,470,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 30 | 650,000 | 19,500,000 |
Ensayo SPT | 10 | 247,000 | 2,470,000 |
Informe Geotécnico y recomendaciones de construcción | 10 | 1,950,000 | 19,500,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 24495 | 10,400 | 254,748,000 |
Salario mínimo mensual vigente, base | 195.96 | 1,300,000 | 254,748,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 24495 | 13,520 | 331,172,400 |
Diseño hidráulico de edificio x 1 m2 | 24495 | 6,760 | 165,586,200 |
Diseño sanitario de edificio x 1 m2, servicio | 24495 | 6,760 | 165,586,200 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 24495 | 16,000 | 391,920,000 |
Valor Adicional: | 1,621,112,531 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 21144 | 4,551 | 96,231,630 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 528.6 | 182,050 | 96,231,630 |
Piloteadora, alquiler por Hora | 80 | 390,000 | 31,200,000 |
Salario mínimo mensual vigente, base | 24 | 1,300,000 | 31,200,000 |
Valor Adicional: | 127,431,630 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 1231303 | 5,200 | 6,402,775,600 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 6391 | 533,055 | 3,406,756,174 |
Arena lavada de río 1 m3 | 3757.908 | 95,019 | 357,072,660 |
Cemento 1 Kg | 2348692.5 | 798 | 1,874,256,615 |
Triturado de 3/4" x 1 m3 | 5636.862 | 150,500 | 848,347,748 |
Agua para la obra 1 litro | 1275004.5 | 36 | 46,410,164 |
Mezcladora 1 bulto, alquiler x hora | 3067.68 | 7,150 | 21,933,912 |
Cuadrilla 7 (8 obreros) x jornal | 447.37 | 578,347 | 258,735,075 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 1000 | 858,441 | 858,440,712 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 1000 | 533,055 | 533,055,261 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 10 | 155,000 | 1,550,000 |
Durmiente ordinario 0,04x0.04x3,00 m. | 1000 | 30,000 | 30,000,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 1000 | 36,500 | 36,500,000 |
Vara clavo 3m | 170 | 20,100 | 3,417,000 |
Cuadrilla de albañileria x 1 Hora | 9000 | 24,504 | 220,539,501 |
Cuadrilla de albañileria x 1 Hora | 900 | 24,504 | 22,053,950 |
Vibrador eléctrico de aguja para concreto x hora | 1500 | 7,550 | 11,325,000 |
Valor Adicional: | 10,667,972,487 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 360 | 484,450 | 174,402,000 |
Punto agua fria PVC 1/2" | 2160 | 44,047 | 95,140,448 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 432 | 20,300 | 8,769,600 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 108 | 30,700 | 3,315,600 |
Codo PVC 90° presión de 1/2" x 10 unidades | 216 | 45,000 | 9,720,000 |
Soldadura para PVC 1/4 de galón | 86.4 | 53,500 | 4,622,400 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 32.4 | 77,000 | 2,494,800 |
Instalación carpintería metálica x 1 m2 | 2879.28 | 20,907 | 60,198,226 |
Instalación carpintería metálica x 1 m2 | 287.928 | 20,907 | 6,019,823 |
Tubo 1" x 6 m RDE 13.5 | 1800 | 63,000 | 113,400,000 |
Valor Adicional: | 382,942,448 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 360 | 1,077,612 | 387,940,262 |
Sanitario One Piece Galio Blanco | 360 | 974,000 | 350,640,000 |
Instalación de aparatos sanitarios x unidad | 360 | 103,612 | 37,300,262 |
Punto desagüe sanitario pvc 4" | 1800 | 68,312 | 122,961,731 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 306 | 78,000 | 23,868,000 |
Cuadrilla de albañileria x 1 Hora | 3600 | 24,504 | 88,215,800 |
Limpiador para PVC 1/4 de galón | 67.68 | 99,000 | 6,700,320 |
Soldadura para PVC DE 1/4 de Galón | 56.34 | 74,150 | 4,177,611 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 480 | 207,000 | 99,360,000 |
Tubería PVC sanitaria 4" | 1200 | 156,100 | 187,320,000 |
Valor Adicional: | 797,581,993 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 120 | 23,113 | 2,773,533 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 24 | 94,000 | 2,256,000 |
Cuadrilla de albañileria x 1 Hora | 19.2 | 24,504 | 470,484 |
Cuadrilla de albañileria x 1 Hora | 1.92 | 24,504 | 47,048 |
Interruptor sencillo cuatro vías. Suministro e instalación | 3960 | 23,313 | 92,318,579 |
Interruptor sencillo cuatro vías x 5 unidades | 792 | 95,000 | 75,240,000 |
Cuadrilla de albañileria x 1 Hora | 633.6 | 24,504 | 15,525,981 |
Cuadrilla de albañileria x 1 Hora | 63.36 | 24,504 | 1,552,598 |
Panel de 80W para sistema de energía solar | 480 | 920,900 | 442,032,000 |
Inversor de voltaje 300W | 120 | 297,050 | 35,646,000 |
Caja de control sistema de energía solar | 120 | 1,018,750 | 122,250,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 480 | 731,600 | 351,168,000 |
Tablero trifásico con puerta de 24 circuitos | 120 | 321,000 | 38,520,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 480 | 395,000 | 189,600,000 |
Valor Adicional: | 1,274,308,112 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 15540 | 153,842 | 2,390,698,433 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 11572.638 | 83,900 | 970,944,328 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 77.7 | 135,750 | 10,547,775 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 4195.8 | 32,100 | 134,685,180 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 12742.8 | 25,500 | 324,941,400 |
Cuadrilla de carpintería por hora | 1294.482 | 38,130 | 49,357,977 |
Cuadrilla de carpintería por hora | 12949.482 | 38,130 | 493,757,533 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 77700 | 5,200 | 404,040,000 |
Transporte 1 tonelada x 1 kilómetro | 621.6 | 3,900 | 2,424,240 |
Valor Adicional: | 2,390,698,433 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 6 | 99,900,000 | 599,400,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 30250 | 12,828 | 388,053,050 |
Intervinil 5 galones, vinilo tipo 2 | 302.5 | 230,000 | 69,575,000 |
Cuadrilla de pintura x 1 hora | 665.5 | 38,563 | 25,663,550 |
Cuadrilla de pintura x 1 hora | 6655 | 38,563 | 256,635,501 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 6050 | 5,200 | 31,460,000 |
Transporte 1 tonelada x 1 kilómetro | 1210 | 3,900 | 4,719,000 |
Geomembrana Instalación x 1 m2 | 20400 | 13,477 | 274,939,246 |
Cuadrilla de albañileria x 1 Hora | 1020 | 24,504 | 24,994,477 |
Cuadrilla de albañileria x 1 Hora | 10200 | 24,504 | 249,944,768 |
Cepillera Attica | 300 | 28,850 | 8,655,000 |
Espejo de 2mm de espesor *1 m2 | 600 | 93,700 | 56,220,000 |
Argolla toalla attica | 300 | 36,250 | 10,875,000 |
Valor Adicional: | 1,338,142,296 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 400 | 140,813 | 56,325,366 |
Cascarilla de arroz x bulto 45 Kg | 100 | 155,000 | 15,500,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 30 | 91,000 | 2,730,000 |
Plántula aguacate | 400 | 33,250 | 13,300,000 |
Tierra negra abonada x 1 m3 | 80 | 235,000 | 18,800,000 |
Pala redonda No. 4 mango plástico | 2 | 63,000 | 126,000 |
Cuadrilla de instalaciones x 1 Hora | 200 | 26,955 | 5,390,966 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 80 | 5,200 | 416,000 |
Transporte 1 tonelada x 1 kilómetro | 16 | 3,900 | 62,400 |
Valor Adicional: | 56,325,366 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 2694000000 | 1 | 2,694,000,000 |
Valor Adicional: | 2,694,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 2694000000 | 1 | 2,694,000,000 |
Valor Adicional: | 2,694,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 1347570000 | 1 | 1,347,570,000 |
Valor Adicional: | 1,347,570,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 256000000 | 1 | 256,000,000 |
Valor Adicional: | 256,000,000 |
| $207,400 |
| $296,000 |
| $249,000 |
| $31,750 |
| $55,750 |
| $24,900 |
| $102,600 |
| $32,950 |
| $8,666 |
| $1 |
| $39,000,000 |
| $20,000 |
| $38,950 |
| $3,203,250 |
| $65,300 |
| $50,600 |
| $220,400 |
| $12,843,900 |
| $325,000 |
| $812,000 |
| $2,391,250 |
| $113,975,000 |
| $32,000,000 |
| $18,850,900 |
| $2,168,000 |
| $286,000 |
| $830,000 |
| $50,600 |
| $8,000,000 |
| $338,000 |
| $182,000 |
| $44,047 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 0.2 | 20,300 | 4,060 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 0.05 | 30,700 | 1,535 |
Codo PVC 90° presión de 1/2" x 10 unidades | 0.1 | 45,000 | 4,500 |
Soldadura para PVC 1/4 de galón | 0.04 | 53,500 | 2,140 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.015 | 77,000 | 1,155 |
Valor Adicional: | 13,390 |
| $61,700 |
| $1,426,150 |
| $381,150 |
| $114,500 |
| $341,200 |
| $195,000 |
| $114,000 |
| $78,000 |
| $499,000 |
| $49,450 |
| $1,975,000 |
| $1,000,000 |
| $165,000 |
| $1,075,000 |
| $71,500 |
| $5,044,000 |
| $93,000 |
| $465,000,000 |
| $36,650 |
| $54,600 |
| $104,000 |
| $99,000 |
| $99,000 |
| $491,200 |
| $20,900 |
| $85,650 |
| $40,000 |
| $1,699,999 |
| $321,000 |
| $431,000 |
| $874,550 |
| $25,000 |
| $11,559,100 |
| $99,900 |
| $102,100 |
| $0 |
| $96,500 |
| $582,500 |
| $266,000 |
| $20,500 |
| $5,000,000 |
| $910 |
| $599,000 |
| $140,600 |
| $32,900 |
| $257,900 |
| $121,400 |
| $140,000 |
| $374,500 |
| $77,000 |
| $187,800 |
| $168,900 |
| $1,999,950 |
| $21,100 |
| $1,259,412 |
| $78,700 |
| $36,000 |
| $1,101,600 |
| $25,200 |
| $25,000 |
| $755,000 |
| $25,000 |
| $39,250 |
| $210,800 |
| $50,200 |
| $1,800 |
| $75,000 |
| $2,300,000 |
| $43,400 |
| $45,500 |
| $143,300 |
| $70,000 |
| $693,650 |
| $97,500 |
| $200,000 |
| $979,950 |
| $344,600 |
| $28,200 |
| $3,572,000 |
| $199,000 |
| $28,200 |
| $2,777,000 |
| $24,504 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Oficial de construcción x hora | 1 | 15,397 | 15,397 |
Salario mínimo mensual vigente, incluyendo complementos | 0.0071 | 2,168,530 | 15,397 |
Ayudante de construcción x 1 hora | 1 | 9,108 | 9,108 |
Salario mínimo mensual vigente, incluyendo complementos | 0.0042 | 2,168,530 | 9,108 |
Valor Adicional: | 24,504 |
| $578,347 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 0.2667 | 2,168,530 | 578,347 |
Salario mínimo mensual vigente, base | 0.2667 | 1,300,000 | 346,710 |
Salario mínimo mensual vigente, base | 0.03323082 | 1,300,000 | 43,200 |
Salario mínimo mensual vigente, base | 0.032004 | 1,300,000 | 41,605 |
Salario mínimo mensual vigente, base | 0.0226695 | 1,300,000 | 29,470 |
Salario mínimo mensual vigente, base | 0.024003 | 1,300,000 | 31,204 |
Salario mínimo mensual vigente, base | 0.02221611 | 1,300,000 | 28,881 |
Salario mínimo mensual vigente, base | 0.002667 | 1,300,000 | 3,467 |
Salario mínimo mensual vigente, base | 0.00138684 | 1,300,000 | 1,803 |
Salario mínimo mensual vigente, base | 0.02221611 | 1,300,000 | 28,881 |
Salario mínimo mensual vigente, base | 0.01112139 | 1,300,000 | 14,458 |
Salario mínimo mensual vigente, base | 0.0066675 | 1,300,000 | 8,668 |
Valor Adicional: | 578,347 |
| $86,808 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.2 | 5,200 | 1,040 |
Salario mínimo mensual vigente, base | 0.0008 | 1,300,000 | 1,040 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 1,196 |
| $28,200 |
| $260,000 |
| $210,000 |
| $1,520,000 |
| $79,150 |
| $1,700,000,000 |
| $135,750 |
| $414,700 |
| $973,400 |
| $92,000 |
| $46,456,600 |
| $94,000 |
| $319,100 |
| $63,100 |
| $28,200 |
| $4,550 |
| $992,730,233 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 1 | 1,199,995 | 1,199,995 |
Hora de ingeniero | 32.3607 | 37,082 | 1,199,995 |
Puente, diseño estructural x 1 m2 | 122 | 246,975 | 30,130,987 |
Salario diario vigente | 695.4 | 43,329 | 30,130,987 |
Valor Adicional: | 31,330,982 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero galvanizado G-50 tipo perfil x 1 Kg | 48600 | 13,181 | 640,596,600 |
Soldador mano de obra x hora | 8750 | 16,640 | 145,600,000 |
Salario mínimo mensual vigente, base | 112 | 1,300,000 | 145,600,000 |
Valor Adicional: | 786,196,600 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 15 | 533,055 | 7,995,829 |
Arena lavada de río 1 m3 | 8.82 | 95,019 | 838,068 |
Cemento 1 Kg | 5512.5 | 798 | 4,398,975 |
Triturado de 3/4" x 1 m3 | 13.23 | 150,500 | 1,991,115 |
Agua para la obra 1 litro | 2992.5 | 36 | 108,927 |
Mezcladora 1 bulto, alquiler x hora | 7.2 | 7,150 | 51,480 |
Cuadrilla 7 (8 obreros) x jornal | 1.05 | 578,347 | 607,264 |
Acero G-60 x 1 Kg | 13000 | 5,200 | 67,600,000 |
Valor Adicional: | 75,595,829 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 500 | 10,038 | 5,018,823 |
Cuerda de Nylon 100 m x 0,50 mm | 25 | 50,900 | 1,272,500 |
Estaca de Madera Ø=0.05 L=0.60 m | 250 | 6,100 | 1,525,000 |
| 5 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 8.2 | 24,504 | 200,936 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 82.45 | 24,504 | 2,020,387 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 4 | 4,147,000 | 16,588,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 12 | 650,000 | 7,800,000 |
Ensayo SPT | 4 | 247,000 | 988,000 |
Informe Geotécnico y recomendaciones de construcción | 4 | 1,950,000 | 7,800,000 |
Valor Adicional: | 21,606,823 |
| $970,895 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa en obra gris de 1 planta y 209 m2 presupuesto de construcción | 0.0048 | 202,269,719 | 970,895 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 1.0032 | 3,900 | 3,912 |
Levantamiento topográfico hasta 1,000 m2 | 0.0048 | 2,600,000 | 12,480 |
Replanteo Arquitectónico X 1 m2 | 1.0032 | 10,038 | 10,070 |
Diseño arquitectónico de casa personalizada x 1 m2 | 1.0032 | 28,597 | 28,689 |
Estudio de suelos y geotecnia desde | 0.0048 | 4,147,000 | 19,906 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.0048 | 11,001 | 53 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.0032 | 13,520 | 13,563 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.0032 | 16,000 | 16,051 |
Excavación manual en conglomerado x 1 m3 | 0.048 | 58,492 | 2,808 |
Kit Mueble para baño + lavamanos | 0.0144 | 484,450 | 6,976 |
Punto agua fria PVC 1/2" | 0.0864 | 44,047 | 3,806 |
Tubo 1" x 6 m RDE 13.5 | 0.072 | 63,000 | 4,536 |
Sanitario suministro e instalación | 0.0144 | 1,077,612 | 15,518 |
Punto desagüe sanitario pvc 4" | 0.072 | 68,312 | 4,918 |
Caja de inspección y distribución | 0.0192 | 207,000 | 3,974 |
Tubería PVC sanitaria 4" | 0.048 | 156,100 | 7,493 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.0288 | 492,210 | 14,176 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.0384 | 818,067 | 31,414 |
Acero G-60 x 1 Kg | 2.88 | 5,200 | 14,976 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.0672 | 533,055 | 35,821 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.0096 | 858,441 | 8,241 |
Muro panel doble cara x 1 m2 | 1.1664 | 232,618 | 271,326 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 0.96 | 90,690 | 87,062 |
Teja termoacustica x 1 m2, suministro e instalación | 1.0944 | 198,448 | 217,182 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.048 | 140,813 | 6,759 |
Aseo general para entrega de obra x metro cuadrado | 1.0032 | 3,042 | 3,051 |
Administración | 60960 | 1 | 60,960 |
Imprevistos | 29760 | 1 | 29,760 |
Utilidad | 29760 | 1 | 29,760 |
Unidad Monetaria | 5654.4 | 1 | 5,654 |
Valor Adicional: | 970,895 |
| $65,450 |
| $27,400 |
| $3,990,000 |
| $54,650 |
| $1,465,000 |
| $95,000 |
| $45,450 |
| $501,650 |
| $42,250 |
| $34,650 |
| $430,000 |
| $307,950 |
| $261,350 |
| $195,000 |
| $350,150 |
| $165,750 |
| $360,000 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.