| $27,016 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.4 | 5,200 | 2,080 |
Salario mínimo mensual vigente, base | 0.0016 | 1,300,000 | 2,080 |
Transporte 1 tonelada x 1 kilómetro | 0.4 | 3,900 | 1,560 |
Salario mínimo mensual vigente, base | 0.0012 | 1,300,000 | 1,560 |
Valor Adicional: | 3,640 |
| $14,100 |
| $1,430,000 |
| $589,940 |
| $21,710,000 |
| $97,500 |
| $34,650 |
| $7,194,000 |
| $45,450 |
| $15,900 |
| $35,777,000 |
| $124,000 |
| $113,975,000 |
| $146,875 |
| $7,150 |
| $312,000 |
| $158,000 |
| $219,000 |
| $140,000 |
| $1,560,000 |
| $457,000 |
| $1,527,450 |
| $295,000 |
| $25,400 |
| $333,000 |
| $85,000 |
| $490,000 |
| $202,000 |
| $3,500,000 |
| $1,850,000 |
| $1,426,150 |
| $55,590 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.01 | 473,449 | 4,734 |
Arena lavada de río 1 m3 | 0.0128 | 95,019 | 1,216 |
Cemento 1 Kg | 3.82 | 798 | 3,048 |
Agua para la obra 1 litro | 2.4 | 36 | 87 |
Ayudante de construcción x 1 hora | 0.002 | 9,108 | 18 |
Ayudante de construcción x 1 hora | 0.04 | 9,108 | 364 |
Bloque número 5 | 13.27 | 1,950 | 25,877 |
Valor Adicional: | 30,611 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.3675 | 5,200 | 1,911 |
Salario mínimo mensual vigente, base | 0.00147 | 1,300,000 | 1,911 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 2,067 |
| $45,000 |
| $979,950 |
| $2,915,000 |
| $7,581 |
| $139,848 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ladrillo Rejilla | 68 | 1,550 | 105,400 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.02 | 473,449 | 9,469 |
Arena lavada de río 1 m3 | 0.0256 | 95,019 | 2,432 |
Cemento 1 Kg | 7.64 | 798 | 6,097 |
Agua para la obra 1 litro | 4.8 | 36 | 175 |
Ayudante de construcción x 1 hora | 0.004 | 9,108 | 36 |
Ayudante de construcción x 1 hora | 0.08 | 9,108 | 729 |
Valor Adicional: | 114,869 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.3675 | 5,200 | 1,911 |
Salario mínimo mensual vigente, base | 0.00147 | 1,300,000 | 1,911 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 2,067 |
| $153,842 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 5 | 5,200 | 26,000 |
Salario mínimo mensual vigente, base | 0.02 | 1,300,000 | 26,000 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 26,156 |
| $190,000 |
| $1,699,999 |
| $2,650,000 |
| $38,950 |
| $465,236 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sistema, Panel x 1 m2 x 0.04 m | 2.1 | 56,500 | 118,650 |
Malla plana RG2 | 0.8 | 5,350 | 4,280 |
Malla RGU 80 | 1 | 6,500 | 6,500 |
Malla angular RG1 | 1 | 6,700 | 6,700 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.11 | 473,449 | 52,079 |
Arena lavada de río 1 m3 | 0.1408 | 95,019 | 13,379 |
Cemento 1 Kg | 42.02 | 798 | 33,532 |
Agua para la obra 1 litro | 26.4 | 36 | 961 |
Ayudante de construcción x 1 hora | 0.022 | 9,108 | 200 |
Ayudante de construcción x 1 hora | 0.44 | 9,108 | 4,007 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.516 | 31,013 | 16,003 |
Acero G-60 x 1 Kg | 3.077424 | 5,200 | 16,003 |
Valor Adicional: | 204,212 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 10 | 5,200 | 52,000 |
Salario mínimo mensual vigente, base | 0.04 | 1,300,000 | 52,000 |
Transporte 1 tonelada x 1 kilómetro | 0.08 | 3,900 | 312 |
Salario mínimo mensual vigente, base | 0.00024 | 1,300,000 | 312 |
Valor Adicional: | 52,312 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.2 | 232,618 | 46,524 |
Sistema, Panel x 1 m2 x 0.04 m | 0.21 | 56,500 | 11,865 |
Malla plana RG2 | 0.08 | 5,350 | 428 |
Malla RGU 80 | 0.1 | 6,500 | 650 |
Malla angular RG1 | 0.1 | 6,700 | 670 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.011 | 473,449 | 5,208 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0516 | 31,013 | 1,600 |
Cuadrilla de instalaciones x 1 Hora | 0.03016 | 26,955 | 813 |
Cuadrilla de instalaciones x 1 Hora | 0.3016 | 26,955 | 8,130 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 1 | 5,200 | 5,200 |
Transporte 1 tonelada x 1 kilómetro | 0.008 | 3,900 | 31 |
Muro panel doble cara x 1 m2 | 0.02 | 232,618 | 4,652 |
Muro panel doble cara x 1 m2 | 0.02 | 232,618 | 4,652 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.00128 | 232,618 | 298 |
Valor Adicional: | 46,524 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.2 | 232,618 | 46,524 |
Sistema, Panel x 1 m2 x 0.04 m | 0.21 | 56,500 | 11,865 |
Malla plana RG2 | 0.08 | 5,350 | 428 |
Malla RGU 80 | 0.1 | 6,500 | 650 |
Malla angular RG1 | 0.1 | 6,700 | 670 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.011 | 473,449 | 5,208 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0516 | 31,013 | 1,600 |
Cuadrilla de instalaciones x 1 Hora | 0.03016 | 26,955 | 813 |
Cuadrilla de instalaciones x 1 Hora | 0.3016 | 26,955 | 8,130 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 1 | 5,200 | 5,200 |
Transporte 1 tonelada x 1 kilómetro | 0.008 | 3,900 | 31 |
Muro panel doble cara x 1 m2 | 0.02 | 232,618 | 4,652 |
Muro panel doble cara x 1 m2 | 0.02 | 232,618 | 4,652 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.00128 | 232,618 | 298 |
Valor Adicional: | 46,524 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.1 | 232,618 | 23,262 |
Sistema, Panel x 1 m2 x 0.04 m | 0.105 | 56,500 | 5,933 |
Malla plana RG2 | 0.04 | 5,350 | 214 |
Malla RGU 80 | 0.05 | 6,500 | 325 |
Malla angular RG1 | 0.05 | 6,700 | 335 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.0055 | 473,449 | 2,604 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0258 | 31,013 | 800 |
Cuadrilla de instalaciones x 1 Hora | 0.01508 | 26,955 | 406 |
Cuadrilla de instalaciones x 1 Hora | 0.1508 | 26,955 | 4,065 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.5 | 5,200 | 2,600 |
Transporte 1 tonelada x 1 kilómetro | 0.004 | 3,900 | 16 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Valor Adicional: | 23,262 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.0128 | 232,618 | 2,978 |
Sistema, Panel x 1 m2 x 0.04 m | 0.01344 | 56,500 | 759 |
Malla plana RG2 | 0.00512 | 5,350 | 27 |
Malla RGU 80 | 0.0064 | 6,500 | 42 |
Malla angular RG1 | 0.0064 | 6,700 | 43 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.000704 | 473,449 | 333 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0033024 | 31,013 | 102 |
Cuadrilla de instalaciones x 1 Hora | 0.00193024 | 26,955 | 52 |
Cuadrilla de instalaciones x 1 Hora | 0.0193024 | 26,955 | 520 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.064 | 5,200 | 333 |
Transporte 1 tonelada x 1 kilómetro | 0.000512 | 3,900 | 2 |
Muro panel doble cara x 1 m2 | 0.00128 | 232,618 | 298 |
Muro panel doble cara x 1 m2 | 0.00128 | 232,618 | 298 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Muro panel doble cara x 1 m2 | 8.192E-5 | 232,618 | 19 |
Valor Adicional: | 2,978 |
| $8,000,000 |
| $85,000 |
| $23,550 |
| $190,000 |
| $2,956,000 |
| $80,000 |
| $6,700 |
| $75,000 |
| $7,500 |
| $3,990,000 |
| $390,000 |
| $24,850 |
| $447,000 |
| $26,850 |
| $26,100 |
| $18,250,000 |
| $19,990,000 |
| $497,000 |
| $88,550 |
| $40,000 |
| $96,642,307 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 51.58 | 533,055 | 27,494,990 |
Arena lavada de río 1 m3 | 30.32904 | 95,019 | 2,881,835 |
Cemento 1 Kg | 18955.65 | 798 | 15,126,609 |
Triturado de 3/4" x 1 m3 | 45.49356 | 150,500 | 6,846,781 |
Agua para la obra 1 litro | 10290.21 | 36 | 374,564 |
Mezcladora 1 bulto, alquiler x hora | 24.7584 | 7,150 | 177,023 |
Cuadrilla 7 (8 obreros) x jornal | 3.6106 | 578,347 | 2,088,180 |
Acero G-60 x 1 Kg | 2170 | 5,200 | 11,284,000 |
Cuadrilla de albañileria x 1 Hora | 800 | 24,504 | 19,603,511 |
Oficial de construcción x hora | 800 | 15,397 | 12,317,250 |
Ayudante de construcción x 1 hora | 800 | 9,108 | 7,286,261 |
Valor Adicional: | 58,382,502 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 5 | 533,055 | 2,665,276 |
Arena lavada de río 1 m3 | 2.94 | 95,019 | 279,356 |
Cemento 1 Kg | 1837.5 | 798 | 1,466,325 |
Triturado de 3/4" x 1 m3 | 4.41 | 150,500 | 663,705 |
Agua para la obra 1 litro | 997.5 | 36 | 36,309 |
Mezcladora 1 bulto, alquiler x hora | 2.4 | 7,150 | 17,160 |
Cuadrilla 7 (8 obreros) x jornal | 0.35 | 578,347 | 202,421 |
Acero G-60 x 1 Kg | 1300 | 5,200 | 6,760,000 |
Valor Adicional: | 9,425,276 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| $130,000 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.