Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.2 | 5,200 | 1,040 |
Salario mínimo mensual vigente, base | 0.0008 | 1,300,000 | 1,040 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 1,196 |
| $24,800 |
| $110,200 |
| $25,750 |
| $650,000 |
| $95,019 |
| $292,000 |
| $116,600 |
| $65,000 |
| $39,600 |
| $29,550 |
| $16,550 |
| $35,500 |
| $3,405,600 |
| $33,100 |
| $41,800 |
| $45,500 |
| $71,000 |
| $73,800 |
| $35,400 |
| $25,500 |
| $374,750 |
| $434,000 |
| $25,000 |
| $135,900 |
| $57,000 |
| $275,900 |
| $28,500 |
| $53,600 |
| $1,399,900 |
| $430,000 |
| $54,600 |
| $1,427,500 |
| $167,000 |
| $350,150 |
| $50,000 |
| $415,600 |
| $812,000 |
| $2,422,700 |
| $81,900 |
| $286,000 |
| $97,500 |
| $6,900 |
| $935,000 |
| $39,300 |
| $812,000 |
| $2,340 |
| $199,450 |
| $36,250 |
| $35,550 |
| $286,000 |
| $1,990,000 |
| $23,600 |
| $115,200 |
| $13,399,250 |
| $458,953 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Bisagras de 3" en niquel | 0.76 | 27,250 | 20,710 |
Cuadrilla de carpintería por hora | 10.31 | 38,130 | 393,115 |
Salario diario vigente | 9.0728 | 43,329 | 393,115 |
Pegante colbón 1 galón | 0.25 | 73,000 | 18,250 |
| 0.15 | 0 | 0 |
Tornillo autoperforante de 8 x 5/8" avellanado madera y aglomerados cobrizado BOLSA 100 unidades | 0.05 | 27,950 | 1,398 |
triplex otobo 4 mm | 0.52 | 49,000 | 25,480 |
Valor Adicional: | 458,953 |
| $105,300 |
| $1,560,000 |
| $158,000 |
| $59,386 |
| $28,200 |
| $195,000 |
| $104,000 |
| $68,312 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 0.17 | 78,000 | 13,260 |
Cuadrilla de albañileria x 1 Hora | 2 | 24,504 | 49,009 |
Oficial de construcción x hora | 2 | 15,397 | 30,793 |
Ayudante de construcción x 1 hora | 2 | 9,108 | 18,216 |
Limpiador para PVC 1/4 de galón | 0.0376 | 99,000 | 3,722 |
Soldadura para PVC DE 1/4 de Galón | 0.0313 | 74,150 | 2,321 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 68,312 |
| $286,000 |
| $114,000 |
| $96,642,307 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 51.58 | 533,055 | 27,494,990 |
Arena lavada de río 1 m3 | 30.32904 | 95,019 | 2,881,835 |
Cemento 1 Kg | 18955.65 | 798 | 15,126,609 |
Triturado de 3/4" x 1 m3 | 45.49356 | 150,500 | 6,846,781 |
Agua para la obra 1 litro | 10290.21 | 36 | 374,564 |
Mezcladora 1 bulto, alquiler x hora | 24.7584 | 7,150 | 177,023 |
Cuadrilla 7 (8 obreros) x jornal | 3.6106 | 578,347 | 2,088,180 |
Acero G-60 x 1 Kg | 2170 | 5,200 | 11,284,000 |
Cuadrilla de albañileria x 1 Hora | 800 | 24,504 | 19,603,511 |
Oficial de construcción x hora | 800 | 15,397 | 12,317,250 |
Ayudante de construcción x 1 hora | 800 | 9,108 | 7,286,261 |
Valor Adicional: | 58,382,502 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 5 | 533,055 | 2,665,276 |
Arena lavada de río 1 m3 | 2.94 | 95,019 | 279,356 |
Cemento 1 Kg | 1837.5 | 798 | 1,466,325 |
Triturado de 3/4" x 1 m3 | 4.41 | 150,500 | 663,705 |
Agua para la obra 1 litro | 997.5 | 36 | 36,309 |
Mezcladora 1 bulto, alquiler x hora | 2.4 | 7,150 | 17,160 |
Cuadrilla 7 (8 obreros) x jornal | 0.35 | 578,347 | 202,421 |
Acero G-60 x 1 Kg | 1300 | 5,200 | 6,760,000 |
Valor Adicional: | 9,425,276 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| $338,000 |
| $12,038,000 |
| $284,350 |
| $180,000 |
| $97,500 |
| $104,000 |
| $476,619 |
| $78,000 |
| $90,900 |
| $1,235,000 |
| $187,800 |
| $130,000 |