| $59,900 |
| $287,196 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Estructura de pavimento flexible, presupuesto de construcción de 1 Km de vía 7 m de ancho | 0.0001428571 | 2,010,375,000 | 287,196 |
Diseño de pavimento por unidad homogénea de diseño, según cbr y tránsito | 0.0004285713 | 3,900,000 | 1,671 |
Subbase triturada de 2" x 1 m3 | 0.29999991 | 125,200 | 37,560 |
Base granular de 1 1/2" x m3 | 0.29999991 | 126,550 | 37,965 |
Asfalto 60/70 por tonelada | 0.09999997 | 2,100,000 | 210,000 |
Valor Adicional: | 287,196 |
| $58,750 |
| $1,481,850 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario diario vigente | 34.2 | 43,329 | 1,481,852 |
Salario mínimo mensual vigente, base | 1.139886 | 1,300,000 | 1,481,852 |
Valor Adicional: | 1,481,852 |
| $35,500 |
| $91,000 |
| $302,800 |
| $13,213 |
| $533,055 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| $130,750 |
| $20,907 |
| $41,800 |
| $73,000 |
| $28,597 |
| $107,200 |
| $116,984 |
| $12,507,952 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sikaguard 68 Blanco Brillante | 2 | 699,000 | 1,398,000 |
Sikaplan®-12 NTR | 2 | 2,990,000 | 5,980,000 |
Sikatop - Seal 107 20 kilos | 6 | 184,900 | 1,109,400 |
Geotextil no tejido NT-1800 | 0.2 | 2,422,700 | 484,540 |
Valor Adicional: | 8,971,940 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 940000 | 1 | 940,000 |
Valor Adicional: | 940,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 940000 | 1 | 940,000 |
Valor Adicional: | 940,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 470000 | 1 | 470,000 |
Valor Adicional: | 470,000 |
| $13,000 |
| $53,095 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Agua para la obra 1 litro | 5 | 36 | 182 |
Salario mínimo mensual vigente, base | 0.00014 | 1,300,000 | 182 |
Cemento Blanco x 1 Kg | 4 | 2,340 | 9,360 |
Cuadrilla de albañileria x 1 Hora | 1.2 | 24,504 | 29,405 |
Oficial de construcción x hora | 1.2 | 15,397 | 18,476 |
Ayudante de construcción x 1 hora | 1.2 | 9,108 | 10,929 |
Granito de marmol blanco bulto de 35 Kg | 0.06 | 69,650 | 4,179 |
marmolina x 5 Kg | 0.4 | 6,900 | 2,760 |
Cuadrilla de albañileria x 1 Hora | 0.12 | 24,504 | 2,941 |
Oficial de construcción x hora | 0.12 | 15,397 | 1,848 |
Ayudante de construcción x 1 hora | 0.12 | 9,108 | 1,093 |
Pulidora de 9" 6500 RPM 2700W | 0.005 | 853,600 | 4,268 |
Valor Adicional: | 53,095 |
| $34,250 |
| $45,000 |
| $4,551 |
| $135,708 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.2 | 5,200 | 1,040 |
Salario mínimo mensual vigente, base | 0.0008 | 1,300,000 | 1,040 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 1,196 |
| $83,200 |
| $131,900 |
| $45,750 |
| $50,000 |
| $91,750 |
| $120,000 |
| $43,950 |
| $85,000 |
| $465,000,000 |
| $55,000 |
| $123,500,000 |
| $14,299 |
| $8,666 |
| $273,000 |
| $149,000 |
| $289,800 |
| $16,300,000 |
| $65,300 |
| $61,880 |
| $96,500 |
| $2,098,750 |
| $195,000 |
| $75,000 |
| $40,000 |
| $29,550 |
| $96,642,307 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 51.58 | 533,055 | 27,494,990 |
Arena lavada de río 1 m3 | 30.32904 | 95,019 | 2,881,835 |
Cemento 1 Kg | 18955.65 | 798 | 15,126,609 |
Triturado de 3/4" x 1 m3 | 45.49356 | 150,500 | 6,846,781 |
Agua para la obra 1 litro | 10290.21 | 36 | 374,564 |
Mezcladora 1 bulto, alquiler x hora | 24.7584 | 7,150 | 177,023 |
Cuadrilla 7 (8 obreros) x jornal | 3.6106 | 578,347 | 2,088,180 |
Acero G-60 x 1 Kg | 2170 | 5,200 | 11,284,000 |
Cuadrilla de albañileria x 1 Hora | 800 | 24,504 | 19,603,511 |
Oficial de construcción x hora | 800 | 15,397 | 12,317,250 |
Ayudante de construcción x 1 hora | 800 | 9,108 | 7,286,261 |
Valor Adicional: | 58,382,502 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 5 | 533,055 | 2,665,276 |
Arena lavada de río 1 m3 | 2.94 | 95,019 | 279,356 |
Cemento 1 Kg | 1837.5 | 798 | 1,466,325 |
Triturado de 3/4" x 1 m3 | 4.41 | 150,500 | 663,705 |
Agua para la obra 1 litro | 997.5 | 36 | 36,309 |
Mezcladora 1 bulto, alquiler x hora | 2.4 | 7,150 | 17,160 |
Cuadrilla 7 (8 obreros) x jornal | 0.35 | 578,347 | 202,421 |
Acero G-60 x 1 Kg | 1300 | 5,200 | 6,760,000 |
Valor Adicional: | 9,425,276 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| $20,000 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.