Descripción | Cantidad | Valor Unitario | Valor Total |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 0.17 | 78,000 | 13,260 |
Cuadrilla de albañileria x 1 Hora | 2 | 24,504 | 49,009 |
Oficial de construcción x hora | 2 | 15,397 | 30,793 |
Ayudante de construcción x 1 hora | 2 | 9,108 | 18,216 |
Limpiador para PVC 1/4 de galón | 0.0376 | 99,000 | 3,722 |
Soldadura para PVC DE 1/4 de Galón | 0.0313 | 74,150 | 2,321 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 68,312 |
| USD$75.22 |
| USD$23.21 |
| USD$24.23 |
| USD$99.76 |
| USD$7.52 |
| USD$25,500,000.00 |
| USD$36.47 |
| USD$293.25 |
| USD$255.00 |
| USD$521.40 |
| USD$3.54 |
| USD$12.75 |
| USD$23.21 |
| USD$955.76 |
| USD$49.73 |
| USD$119.34 |
| USD$60.69 |
| USD$35.19 |
| USD$397.80 |
| USD$494.19 |
| USD$16.58 |
| USD$444.63 |
| USD$109.65 |
| USD$115.01 |
| USD$1,633.99 |
| USD$13,940.25 |
| USD$36.98 |
| USD$604.74 |
| USD$1,089.11 |
| USD$8.44 |
| USD$322.69 |
| USD$33.15 |
| USD$420.75 |
| USD$152.75 |
| USD$20,374.50 |
| USD$49.78 |
| USD$275.89 |
| USD$1,117.11 |
| USD$158.88 |
| USD$1,568.25 |
| USD$397.80 |
| USD$128.09 |
| USD$49.73 |
| USD$28.71 |
| USD$703.27 |
| USD$3,149.25 |
| USD$17.94 |
| USD$21.17 |
| USD$25,500,000.00 |
| USD$194.60 |
| USD$19.64 |
| USD$5.07 |
| USD$137.04 |
| USD$44.84 |
| USD$146.88 |
| USD$75.23 |
| USD$68.52 |
| USD$6.01 |
| USD$39.17 |
| USD$78.29 |
| USD$5.70 |
| USD$38.45 |
| USD$12.75 |
| USD$79.82 |
| USD$300.65 |
| USD$30.60 |
| USD$6.50 |
| USD$100.73 |
| USD$140.07 |
| USD$5.67 |
| USD$18.03 |
| USD$21.84 |
| USD$123.53 |
| USD$58.14 |
| USD$497.76 |
| USD$26.14 |
| USD$82.88 |
| USD$116.12 |
| USD$31,492.50 |
| USD$16.83 |
| USD$9.95 |
| USD$15.48 |
| USD$16.40 |
| USD$198.90 |
| USD$8.98 |
| USD$116.54 |
| USD$26.19 |
| USD$119.57 |
| USD$81.60 |
| USD$38.68 |
| USD$364.65 |
| USD$83.10 |
| USD$66.30 |
| USD$15.75 |
| USD$63.85 |
| USD$27.51 |
| USD$24.86 |
| USD$25.53 |
| USD$26.85 |
| USD$17,403.02 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto premezclado de 4000 PSI o 27.6 MPa x 1 m3 | 100 | 682,471 | 68,247,140 |
Arena lavada de río 1 m3 | 60 | 95,019 | 5,701,140 |
Cemento 1 Kg | 42000 | 798 | 33,516,000 |
Triturado de 3/4" x 1 m3 | 60 | 150,500 | 9,030,000 |
Planta de concreto precio por hora | 20 | 1,000,000 | 20,000,000 |
Valor Adicional: | 68,247,140 |
| USD$23.46 |
| USD$64.26 |
| USD$63.06 |
| USD$31.82 |
| USD$82.88 |
| USD$159,361.00 |
| USD$109.40 |
| USD$18.59 |
| USD$7.96 |
| USD$12.72 |
| USD$35.80 |
| USD$14.05 |
| USD$35.70 |
| USD$493.16 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Apartamento nuevo en edificio de 10 plantas, Precio por 1 m2 | 1 | 1,933,961 | 1,933,961 |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00014968019 | 12,920,619,720 | 1,933,961 |
Valor Adicional: | 1,933,961 |
| USD$1.96 |
| USD$25.25 |
| USD$14.54 |
| USD$37.45 |
| USD$11.60 |
| USD$72.93 |
| USD$24.86 |
| USD$82.88 |
| USD$121.54 |
| USD$35.70 |
| USD$379.70 |
| USD$8.02 |
| USD$31.06 |
| USD$27.34 |
| USD$28.45 |
| USD$23.13 |
| USD$24,643.79 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 51.58 | 533,055 | 27,494,990 |
Arena lavada de río 1 m3 | 30.32904 | 95,019 | 2,881,835 |
Cemento 1 Kg | 18955.65 | 798 | 15,126,609 |
Triturado de 3/4" x 1 m3 | 45.49356 | 150,500 | 6,846,781 |
Agua para la obra 1 litro | 10290.21 | 36 | 374,564 |
Mezcladora 1 bulto, alquiler x hora | 24.7584 | 7,150 | 177,023 |
Cuadrilla 7 (8 obreros) x jornal | 3.6106 | 578,347 | 2,088,180 |
Acero G-60 x 1 Kg | 2170 | 5,200 | 11,284,000 |
Cuadrilla de albañileria x 1 Hora | 800 | 24,504 | 19,603,511 |
Oficial de construcción x hora | 800 | 15,397 | 12,317,250 |
Ayudante de construcción x 1 hora | 800 | 9,108 | 7,286,261 |
Valor Adicional: | 58,382,502 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 5 | 533,055 | 2,665,276 |
Arena lavada de río 1 m3 | 2.94 | 95,019 | 279,356 |
Cemento 1 Kg | 1837.5 | 798 | 1,466,325 |
Triturado de 3/4" x 1 m3 | 4.41 | 150,500 | 663,705 |
Agua para la obra 1 litro | 997.5 | 36 | 36,309 |
Mezcladora 1 bulto, alquiler x hora | 2.4 | 7,150 | 17,160 |
Cuadrilla 7 (8 obreros) x jornal | 0.35 | 578,347 | 202,421 |
Acero G-60 x 1 Kg | 1300 | 5,200 | 6,760,000 |
Valor Adicional: | 9,425,276 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| USD$4,580.74 |
| USD$606.96 |
| USD$112.97 |