| USD$545.10 |
| USD$407.79 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 1.764 | 95,019 | 167,614 |
Arena lavada de río 6 m3 | 0.2940588 | 570,000 | 167,614 |
Cemento 1 Kg | 1102.5 | 798 | 879,795 |
Cemento, bulto de 50 Kg | 22.05 | 39,900 | 879,795 |
Triturado de 3/4" x 1 m3 | 2.646 | 150,500 | 398,223 |
Grava 3/4" x 6 m3 | 0.44100000882 | 903,000 | 398,223 |
Agua para la obra 1 litro | 598.5 | 36 | 21,785 |
Salario mínimo mensual vigente, base | 0.016758 | 1,300,000 | 21,785 |
Valor Adicional: | 1,467,417 |
| USD$118.18 |
| USD$251.91 |
| USD$14.79 |
| USD$8.59 |
| USD$47.15 |
| USD$178.25 |
| USD$78.53 |
| USD$242.25 |
| USD$22.57 |
| USD$26.52 |
| USD$18.84 |
| USD$16.37 |
| USD$762.45 |
| USD$1.33 |
| USD$6,379.06 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sikaguard 68 Blanco Brillante | 4 | 699,000 | 2,796,000 |
Sikaplan®-12 NTR | 4 | 2,990,000 | 11,960,000 |
Sikatop - Seal 107 20 kilos | 12 | 184,900 | 2,218,800 |
Geotextil no tejido NT-1800 | 0.4 | 2,422,700 | 969,080 |
Valor Adicional: | 17,943,880 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cuadrilla de instalaciones x 1 Hora | 80 | 26,955 | 2,156,386 |
Oficial de construcción x hora | 88 | 15,397 | 1,354,898 |
Ayudante de construcción x 1 hora | 88 | 9,108 | 801,489 |
Valor Adicional: | 2,156,386 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 1880000 | 1 | 1,880,000 |
Valor Adicional: | 1,880,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 1880000 | 1 | 1,880,000 |
Valor Adicional: | 1,880,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 940000 | 1 | 940,000 |
Valor Adicional: | 940,000 |
| USD$25.67 |
| USD$1,133.00 |
| USD$10.20 |
| USD$11.60 |
| USD$7.29 |
| USD$10.20 |
| USD$10.01 |
| USD$8.49 |
| USD$10.20 |
| USD$89.25 |
| USD$8.42 |
| USD$9,123.14 |
| USD$8.30 |
| USD$10.24 |
| USD$35.66 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ladrillo Rejilla | 68 | 1,550 | 105,400 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.02 | 473,449 | 9,469 |
Arena lavada de río 1 m3 | 0.0256 | 95,019 | 2,432 |
Cemento 1 Kg | 7.64 | 798 | 6,097 |
Agua para la obra 1 litro | 4.8 | 36 | 175 |
Ayudante de construcción x 1 hora | 0.004 | 9,108 | 36 |
Ayudante de construcción x 1 hora | 0.08 | 9,108 | 729 |
Valor Adicional: | 114,869 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.3675 | 5,200 | 1,911 |
Salario mínimo mensual vigente, base | 0.00147 | 1,300,000 | 1,911 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 2,067 |
| USD$10.43 |
| USD$35.85 |
| USD$0.00 |
| USD$30.92 |
| USD$14.15 |
| USD$8.39 |
| USD$109.65 |
| USD$10.20 |
| USD$9.72 |
| USD$9.13 |
| USD$6.02 |
| USD$5.33 |
| USD$3,315.00 |
| USD$10.86 |
| USD$274.13 |
| USD$5.38 |
| USD$72.51 |
| USD$17.85 |
| USD$1,127.10 |
| USD$26.52 |
| USD$52.79 |
| USD$26.52 |
| USD$152.75 |
| USD$16.09 |
| USD$74.89 |
| USD$10.20 |
| USD$24.61 |
| USD$2.56 |
| USD$10.20 |
| USD$1.32 |
| USD$10.20 |
| USD$10.20 |
| USD$1,017.45 |
| USD$15.82 |
| USD$12.80 |
| USD$20.07 |
| USD$192.53 |
| USD$11.07 |
| USD$26.04 |
| USD$99.45 |
| USD$998.33 |
| USD$34.31 |
| USD$60.77 |
| USD$44.42 |
| USD$5.23 |
| USD$10.20 |
| USD$40.80 |
| USD$3.54 |
| USD$18.82 |
| USD$3,069.69 |
| USD$45.57 |
| USD$663.00 |
| USD$8.71 |
| USD$36.54 |
| USD$0.26 |
| USD$7.14 |
| USD$9.18 |
| USD$6.43 |
| USD$10.20 |
| USD$8.80 |
| USD$26.52 |
| USD$10.20 |
| USD$8.30 |
| USD$6.81 |
| USD$10.20 |
| USD$638.32 |
| USD$247.10 |
| USD$13.81 |
| USD$47.89 |
| USD$0.46 |
| USD$7.37 |
| USD$8.98 |
| USD$7.54 |
| USD$35.19 |
| USD$1,034.69 |
| USD$10.20 |
| USD$743.33 |
| USD$728.03 |
| USD$29.38 |
| USD$35.92 |
| USD$19.24 |
| USD$22.44 |
| USD$88.49 |
| USD$328.19 |
| USD$86.19 |
| USD$26.52 |
| USD$25.50 |
| USD$109.40 |
| USD$28.71 |
| USD$76.25 |
| USD$2,039.75 |
| USD$33.15 |
| USD$32.61 |
| USD$49.73 |
| USD$48.45 |
| USD$147.80 |
| USD$33.15 |
| USD$11.12 |
| USD$76.25 |
| USD$32.67 |
| USD$109.40 |
| USD$314.93 |
| USD$9.29 |
| USD$303.46 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 1.2 | 95,019 | 114,023 |
Arena lavada de río 6 m3 | 0.20004 | 570,000 | 114,023 |
Cemento 1 Kg | 1000 | 798 | 798,000 |
Cemento, bulto de 50 Kg | 20 | 39,900 | 798,000 |
Triturado de 3/4" x 1 m3 | 1.2 | 150,500 | 180,600 |
Grava 3/4" x 6 m3 | 0.200000004 | 903,000 | 180,600 |
Valor Adicional: | 1,092,623 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cuadrilla 7 (8 obreros) x jornal | 0.14 | 578,347 | 80,969 |
Salario mínimo mensual vigente, incluyendo complementos | 0.037338 | 2,168,530 | 80,969 |
Oficial de construcción x hora | 0.14 | 15,397 | 2,156 |
Salario mínimo mensual vigente, incluyendo complementos | 0.000994 | 2,168,530 | 2,156 |
Valor Adicional: | 83,124 |
| USD$200.18 |
| USD$28.51 |
| USD$3,295,097.69 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 2500 | 1,000,000 | 2,500,000,000 |
Valor Adicional: | 2,500,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 2 | 2,600,000 | 5,200,000 |
Salario mínimo mensual vigente, base | 4 | 1,300,000 | 5,200,000 |
Replanteo Arquitectónico X 1 m2 | 8165 | 10,038 | 81,957,377 |
Cuerda de Nylon 100 m x 0,50 mm | 408.25 | 50,900 | 20,779,925 |
Estaca de Madera Ø=0.05 L=0.60 m | 4082.5 | 6,100 | 24,903,250 |
| 81.65 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 133.906 | 24,504 | 3,281,285 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 1346.4085 | 24,504 | 32,992,918 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 8165 | 14,000 | 114,310,000 |
Estudio de suelos y geotecnia desde | 4 | 4,147,000 | 16,588,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 12 | 650,000 | 7,800,000 |
Ensayo SPT | 4 | 247,000 | 988,000 |
Informe Geotécnico y recomendaciones de construcción | 4 | 1,950,000 | 7,800,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 8165 | 10,400 | 84,916,000 |
Salario mínimo mensual vigente, base | 65.32 | 1,300,000 | 84,916,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 8165 | 13,520 | 110,390,800 |
Diseño hidráulico de edificio x 1 m2 | 8165 | 6,760 | 55,195,400 |
Diseño sanitario de edificio x 1 m2, servicio | 8165 | 6,760 | 55,195,400 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 8165 | 16,000 | 130,640,000 |
Valor Adicional: | 544,002,177 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 7344 | 4,551 | 33,424,380 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 183.6 | 182,050 | 33,424,380 |
Piloteadora, alquiler por Hora | 80 | 390,000 | 31,200,000 |
Salario mínimo mensual vigente, base | 24 | 1,300,000 | 31,200,000 |
Valor Adicional: | 64,624,380 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 410434 | 5,200 | 2,134,256,800 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 2131 | 533,055 | 1,135,940,762 |
Arena lavada de río 1 m3 | 1253.028 | 95,019 | 119,061,468 |
Cemento 1 Kg | 783142.5 | 798 | 624,947,715 |
Triturado de 3/4" x 1 m3 | 1879.542 | 150,500 | 282,871,077 |
Agua para la obra 1 litro | 425134.5 | 36 | 15,474,896 |
Mezcladora 1 bulto, alquiler x hora | 1022.88 | 7,150 | 7,313,592 |
Cuadrilla 7 (8 obreros) x jornal | 149.17 | 578,347 | 86,272,015 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 333 | 858,441 | 285,860,757 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 333 | 533,055 | 177,507,402 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 3.33 | 155,000 | 516,150 |
Durmiente ordinario 0,04x0.04x3,00 m. | 333 | 30,000 | 9,990,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 333 | 36,500 | 12,154,500 |
Vara clavo 3m | 56.61 | 20,100 | 1,137,861 |
Cuadrilla de albañileria x 1 Hora | 2997 | 24,504 | 73,439,654 |
Cuadrilla de albañileria x 1 Hora | 299.7 | 24,504 | 7,343,965 |
Vibrador eléctrico de aguja para concreto x hora | 499.5 | 7,550 | 3,771,225 |
Steel deck metaldeck grado 40 | 1633 | 451,000 | 736,483,000 |
Valor Adicional: | 4,292,541,319 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 120 | 484,450 | 58,134,000 |
Punto agua fria PVC 1/2" | 720 | 44,047 | 31,713,483 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 144 | 20,300 | 2,923,200 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 36 | 30,700 | 1,105,200 |
Codo PVC 90° presión de 1/2" x 10 unidades | 72 | 45,000 | 3,240,000 |
Soldadura para PVC 1/4 de galón | 28.8 | 53,500 | 1,540,800 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 10.8 | 77,000 | 831,600 |
Instalación carpintería metálica x 1 m2 | 959.76 | 20,907 | 20,066,075 |
Instalación carpintería metálica x 1 m2 | 95.976 | 20,907 | 2,006,608 |
Tubo 1" x 6 m RDE 13.5 | 600 | 63,000 | 37,800,000 |
Valor Adicional: | 127,647,483 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 120 | 1,077,612 | 129,313,421 |
Sanitario One Piece Galio Blanco | 120 | 974,000 | 116,880,000 |
Instalación de aparatos sanitarios x unidad | 120 | 103,612 | 12,433,421 |
Punto desagüe sanitario pvc 4" | 600 | 68,312 | 40,987,244 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 102 | 78,000 | 7,956,000 |
Cuadrilla de albañileria x 1 Hora | 1200 | 24,504 | 29,405,267 |
Limpiador para PVC 1/4 de galón | 22.56 | 99,000 | 2,233,440 |
Soldadura para PVC DE 1/4 de Galón | 18.78 | 74,150 | 1,392,537 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 160 | 207,000 | 33,120,000 |
Tubería PVC sanitaria 4" | 400 | 156,100 | 62,440,000 |
Valor Adicional: | 265,860,664 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 40 | 23,113 | 924,511 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 8 | 94,000 | 752,000 |
Cuadrilla de albañileria x 1 Hora | 6.4 | 24,504 | 156,828 |
Cuadrilla de albañileria x 1 Hora | 0.64 | 24,504 | 15,683 |
Interruptor sencillo cuatro vías. Suministro e instalación | 1320 | 23,313 | 30,772,860 |
Interruptor sencillo cuatro vías x 5 unidades | 264 | 95,000 | 25,080,000 |
Cuadrilla de albañileria x 1 Hora | 211.2 | 24,504 | 5,175,327 |
Cuadrilla de albañileria x 1 Hora | 21.12 | 24,504 | 517,533 |
Panel de 80W para sistema de energía solar | 160 | 920,900 | 147,344,000 |
Inversor de voltaje 300W | 40 | 297,050 | 11,882,000 |
Caja de control sistema de energía solar | 40 | 1,018,750 | 40,750,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 160 | 731,600 | 117,056,000 |
Tablero trifásico con puerta de 24 circuitos | 40 | 321,000 | 12,840,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 160 | 395,000 | 63,200,000 |
Valor Adicional: | 424,769,371 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 5180 | 153,842 | 796,899,478 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 3857.546 | 83,900 | 323,648,109 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 25.9 | 135,750 | 3,515,925 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 1398.6 | 32,100 | 44,895,060 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 4247.6 | 25,500 | 108,313,800 |
Cuadrilla de carpintería por hora | 431.494 | 38,130 | 16,452,659 |
Cuadrilla de carpintería por hora | 4316.494 | 38,130 | 164,585,844 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 25900 | 5,200 | 134,680,000 |
Transporte 1 tonelada x 1 kilómetro | 207.2 | 3,900 | 808,080 |
Valor Adicional: | 796,899,478 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 5200 | 178,966 | 930,624,564 |
Agua para la obra 1 litro | 18200 | 36 | 662,480 |
Pegacor max, 25 Kg, porcelanato | 1300 | 85,500 | 111,150,000 |
Porcelanato sellado Beige x 1 m2 | 5200 | 135,900 | 706,680,000 |
Cuadrilla de albañileria x 1 Hora | 4160 | 24,504 | 101,938,258 |
Cuadrilla de albañileria x 1 Hora | 416 | 24,504 | 10,193,826 |
Ascensor 8 personas | 2 | 99,900,000 | 199,800,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 10100 | 12,828 | 129,564,820 |
Intervinil 5 galones, vinilo tipo 2 | 101 | 230,000 | 23,230,000 |
Cuadrilla de pintura x 1 hora | 222.2 | 38,563 | 8,568,656 |
Cuadrilla de pintura x 1 hora | 2222 | 38,563 | 85,686,564 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2020 | 5,200 | 10,504,000 |
Transporte 1 tonelada x 1 kilómetro | 404 | 3,900 | 1,575,600 |
Geomembrana Instalación x 1 m2 | 3000 | 13,477 | 40,432,242 |
Cuadrilla de albañileria x 1 Hora | 150 | 24,504 | 3,675,658 |
Cuadrilla de albañileria x 1 Hora | 1500 | 24,504 | 36,756,584 |
Cepillera Attica | 100 | 28,850 | 2,885,000 |
Espejo de 2mm de espesor *1 m2 | 200 | 93,700 | 18,740,000 |
Argolla toalla attica | 100 | 36,250 | 3,625,000 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 12650 | 141,747 | 1,793,095,088 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 12650 | 130,000 | 1,644,500,000 |
Silicona transparente con fungicida 11 Onzas | 1151.15 | 39,050 | 44,952,408 |
Cuadrilla de albañileria x 1 Hora | 3162.5 | 24,504 | 77,495,130 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4648.875 | 5,200 | 24,174,150 |
Transporte 1 tonelada x 1 kilómetro | 506 | 3,900 | 1,973,400 |
Valor Adicional: | 3,118,766,714 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 10 | 140,813 | 1,408,134 |
Cascarilla de arroz x bulto 45 Kg | 2.5 | 155,000 | 387,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 0.75 | 91,000 | 68,250 |
Plántula aguacate | 10 | 33,250 | 332,500 |
Tierra negra abonada x 1 m3 | 2 | 235,000 | 470,000 |
Pala redonda No. 4 mango plástico | 0.05 | 63,000 | 3,150 |
Cuadrilla de instalaciones x 1 Hora | 5 | 26,955 | 134,774 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2 | 5,200 | 10,400 |
Transporte 1 tonelada x 1 kilómetro | 0.4 | 3,900 | 1,560 |
Valor Adicional: | 1,408,134 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 314144000 | 1 | 314,144,000 |
Valor Adicional: | 314,144,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 157144000 | 1 | 157,144,000 |
Valor Adicional: | 157,144,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 314144000 | 1 | 314,144,000 |
Valor Adicional: | 314,144,000 |
| USD$0.60 |
| USD$165.75 |
| USD$1.76 |
| USD$68.60 |
| USD$6.74 |
| USD$30.96 |
| USD$178.45 |
| USD$102.00 |
| USD$139.47 |
| USD$512,645.63 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño de pavimento por unidad homogénea de diseño, según cbr y tránsito | 3 | 3,900,000 | 11,700,000 |
Salario mínimo mensual vigente, base | 9 | 1,300,000 | 11,700,000 |
Valor Adicional: | 11,700,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Subbase triturada de 2" x 1 m3 | 2100 | 125,200 | 262,920,000 |
Base granular de 1 1/2" x m3 | 2100 | 126,550 | 265,755,000 |
Asfalto 60/70 por tonelada | 700 | 2,100,000 | 1,470,000,000 |
Valor Adicional: | 1,998,675,000 |
| USD$32.90 |
| USD$7.01 |
| USD$306.00 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Hora de ingeniero | 32.3607 | 37,082 | 1,199,995 |
Salario mínimo mensual vigente, incluyendo complementos | 0.55336797 | 2,168,530 | 1,199,995 |
Valor Adicional: | 1,199,995 |
| USD$29,063.63 |
| USD$253,146.21 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 1 | 1,199,995 | 1,199,995 |
Hora de ingeniero | 32.3607 | 37,082 | 1,199,995 |
Puente, diseño estructural x 1 m2 | 122 | 246,975 | 30,130,987 |
Salario diario vigente | 695.4 | 43,329 | 30,130,987 |
Valor Adicional: | 31,330,982 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero galvanizado G-50 tipo perfil x 1 Kg | 48600 | 13,181 | 640,596,600 |
Soldador mano de obra x hora | 8750 | 16,640 | 145,600,000 |
Salario mínimo mensual vigente, base | 112 | 1,300,000 | 145,600,000 |
Valor Adicional: | 786,196,600 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 15 | 533,055 | 7,995,829 |
Arena lavada de río 1 m3 | 8.82 | 95,019 | 838,068 |
Cemento 1 Kg | 5512.5 | 798 | 4,398,975 |
Triturado de 3/4" x 1 m3 | 13.23 | 150,500 | 1,991,115 |
Agua para la obra 1 litro | 2992.5 | 36 | 108,927 |
Mezcladora 1 bulto, alquiler x hora | 7.2 | 7,150 | 51,480 |
Cuadrilla 7 (8 obreros) x jornal | 1.05 | 578,347 | 607,264 |
Acero G-60 x 1 Kg | 13000 | 5,200 | 67,600,000 |
Valor Adicional: | 75,595,829 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 500 | 10,038 | 5,018,823 |
Cuerda de Nylon 100 m x 0,50 mm | 25 | 50,900 | 1,272,500 |
Estaca de Madera Ø=0.05 L=0.60 m | 250 | 6,100 | 1,525,000 |
| 5 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 8.2 | 24,504 | 200,936 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 82.45 | 24,504 | 2,020,387 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 4 | 4,147,000 | 16,588,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 12 | 650,000 | 7,800,000 |
Ensayo SPT | 4 | 247,000 | 988,000 |
Informe Geotécnico y recomendaciones de construcción | 4 | 1,950,000 | 7,800,000 |
Valor Adicional: | 21,606,823 |
| USD$22.59 |
| USD$2.09 |
| USD$34.84 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 0.34 | 78,000 | 26,520 |
Cuadrilla de albañileria x 1 Hora | 4 | 24,504 | 98,018 |
Oficial de construcción x hora | 4 | 15,397 | 61,586 |
Ayudante de construcción x 1 hora | 4 | 9,108 | 36,431 |
Limpiador para PVC 1/4 de galón | 0.0752 | 99,000 | 7,445 |
Soldadura para PVC DE 1/4 de Galón | 0.0626 | 74,150 | 4,642 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 136,624 |
| USD$663.00 |
| USD$33.15 |
| USD$73.24 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Estructura de pavimento flexible, presupuesto de construcción de 1 Km de vía 7 m de ancho | 0.0001428571 | 2,010,375,000 | 287,196 |
Diseño de pavimento por unidad homogénea de diseño, según cbr y tránsito | 0.0004285713 | 3,900,000 | 1,671 |
Subbase triturada de 2" x 1 m3 | 0.29999991 | 125,200 | 37,560 |
Base granular de 1 1/2" x m3 | 0.29999991 | 126,550 | 37,965 |
Asfalto 60/70 por tonelada | 0.09999997 | 2,100,000 | 210,000 |
Valor Adicional: | 287,196 |
| USD$35.91 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.2 | 5,200 | 1,040 |
Salario mínimo mensual vigente, base | 0.0008 | 1,300,000 | 1,040 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 1,196 |
| USD$33.15 |
| USD$11.54 |
| USD$969.00 |
| USD$46.41 |
| USD$5.07 |
| USD$37.34 |
| USD$95.50 |
| USD$85.71 |
| USD$12.29 |
| USD$207.06 |
| USD$16.74 |
| USD$52.89 |
| USD$19.89 |
| USD$23.13 |
| USD$7.96 |
| USD$7.62 |
| USD$0.00 |
| USD$2.52 |
| USD$7.70 |
| USD$15.40 |
| USD$373.58 |
| USD$15.81 |
| USD$16.83 |
| USD$14.00 |
| USD$75.48 |
| USD$300.87 |
| USD$356.97 |
| USD$318.75 |
| USD$7.70 |
| USD$7.88 |
| USD$14.79 |
| USD$21.17 |
| USD$6.48 |
| USD$247.35 |
| USD$5.33 |
| USD$16.58 |
| USD$50.97 |
| USD$19.89 |
| USD$69.62 |
| USD$370.77 |
| USD$228.99 |
| USD$625.32 |
| USD$12.75 |
| USD$20.40 |
| USD$2.32 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 0.0042 | 2,168,530 | 9,108 |
Salario mínimo mensual vigente, base | 0.0042 | 1,300,000 | 5,460 |
Salario mínimo mensual vigente, base | 0.00052332 | 1,300,000 | 680 |
Salario mínimo mensual vigente, base | 0.000504 | 1,300,000 | 655 |
Salario mínimo mensual vigente, base | 0.000357 | 1,300,000 | 464 |
Salario mínimo mensual vigente, base | 0.000378 | 1,300,000 | 491 |
Salario mínimo mensual vigente, base | 0.00034986 | 1,300,000 | 455 |
Salario mínimo mensual vigente, base | 4.2E-5 | 1,300,000 | 55 |
Salario mínimo mensual vigente, base | 2.184E-5 | 1,300,000 | 28 |
Salario mínimo mensual vigente, base | 0.00034986 | 1,300,000 | 455 |
Salario mínimo mensual vigente, base | 0.00017514 | 1,300,000 | 228 |
Salario mínimo mensual vigente, base | 0.000105 | 1,300,000 | 137 |
Valor Adicional: | 9,108 |
| USD$16.58 |
| USD$2.23 |
| USD$14.54 |
| USD$203.97 |
| USD$10.20 |
| USD$13.04 |
| USD$86.91 |
| USD$206.99 |
| USD$25.25 |
| USD$25,500,000.00 |
| USD$11.23 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 0.2 | 20,300 | 4,060 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 0.05 | 30,700 | 1,535 |
Codo PVC 90° presión de 1/2" x 10 unidades | 0.1 | 45,000 | 4,500 |
Soldadura para PVC 1/4 de galón | 0.04 | 53,500 | 2,140 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.015 | 77,000 | 1,155 |
Valor Adicional: | 13,390 |
| USD$182.22 |
| USD$81.57 |
| USD$66.48 |
| USD$456.35 |
| USD$12.72 |
| USD$151.73 |
| USD$19.35 |
| USD$16.65 |
| USD$26.85 |
| USD$26.43 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Oficial de construcción x hora | 2 | 15,397 | 30,793 |
Salario mínimo mensual vigente, incluyendo complementos | 0.0142 | 2,168,530 | 30,793 |
Ayudante de construcción x 1 hora | 8 | 9,108 | 72,863 |
Salario mínimo mensual vigente, incluyendo complementos | 0.0336 | 2,168,530 | 72,863 |
Valor Adicional: | 103,656 |
| USD$18.65 |
| USD$10.07 |
| USD$10.75 |
| USD$12.75 |
| USD$11.51 |
| USD$11.99 |
| USD$6.95 |
| USD$14.33 |
| USD$49.78 |
| USD$49.10 |
| USD$10.46 |
| USD$40.01 |
| USD$7.96 |
| USD$211.65 |
| USD$421.41 |
| USD$21.79 |
| USD$7.99 |
| USD$401.60 |
| USD$17.09 |
| USD$4,806.98 |
| USD$552.84 |
| USD$13.96 |
| USD$12.67 |
| USD$77.21 |
| USD$11.44 |
| USD$150.45 |
| USD$193.55 |
| USD$11.55 |
| USD$104.93 |
| USD$12.11 |
| USD$26.49 |
| USD$25.31 |
| USD$112.97 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.