| $702,000 |
| $88,600 |
| $149,000 |
| $89,500 |
| $585,000 |
| $0 |
| $0 |
| $1,650,000 |
| $715,600 |
| $104,000 |
| $0 |
| $104,000 |
| $0 |
| $0 |
| $26,250 |
| $91,000 |
| $143,000 |
| $139,700 |
| $97,500 |
| $195,000 |
| $260,000 |
| $50,000 |
| $25,450 |
| $1,070,000 |
| $17,000 |
| $1 |
| $325,000 |
| $197,200 |
| $98,900 |
| $1,100,000 |
| $143,000 |
| $136,624 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 0.34 | 78,000 | 26,520 |
Cuadrilla de albañileria x 1 Hora | 4 | 24,504 | 98,018 |
Oficial de construcción x hora | 4 | 15,397 | 61,586 |
Ayudante de construcción x 1 hora | 4 | 9,108 | 36,431 |
Limpiador para PVC 1/4 de galón | 0.0752 | 99,000 | 7,445 |
Soldadura para PVC DE 1/4 de Galón | 0.0626 | 74,150 | 4,642 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 136,624 |
| $18,250 |
| $13,000 |
| $7,670 |
| $50,000 |
| $167,000 |
| $3,900,000 |
| $390,000 |
| $61,880 |
| $20,300 |
| $39,000 |
| $130,000 |
| $87,000 |
| $143,000 |
| $273,000 |
| $98,700 |
| $371,000 |
| $350,150 |
| $338,000 |
| $50,000 |
| $50,000 |
| $4,549,545 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario diario vigente | 105 | 43,329 | 4,549,545 |
Salario mínimo mensual vigente, base | 3.49965 | 1,300,000 | 4,549,545 |
Valor Adicional: | 4,549,545 |
| $325,000 |
| $110,500 |
| $28,597 |
| $57,150 |
| $109,200 |
| $16,000 |
| $20,280 |
| $96,642,307 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 51.58 | 533,055 | 27,494,990 |
Arena lavada de río 1 m3 | 30.32904 | 95,019 | 2,881,835 |
Cemento 1 Kg | 18955.65 | 798 | 15,126,609 |
Triturado de 3/4" x 1 m3 | 45.49356 | 150,500 | 6,846,781 |
Agua para la obra 1 litro | 10290.21 | 36 | 374,564 |
Mezcladora 1 bulto, alquiler x hora | 24.7584 | 7,150 | 177,023 |
Cuadrilla 7 (8 obreros) x jornal | 3.6106 | 578,347 | 2,088,180 |
Acero G-60 x 1 Kg | 2170 | 5,200 | 11,284,000 |
Cuadrilla de albañileria x 1 Hora | 800 | 24,504 | 19,603,511 |
Oficial de construcción x hora | 800 | 15,397 | 12,317,250 |
Ayudante de construcción x 1 hora | 800 | 9,108 | 7,286,261 |
Valor Adicional: | 58,382,502 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 5 | 533,055 | 2,665,276 |
Arena lavada de río 1 m3 | 2.94 | 95,019 | 279,356 |
Cemento 1 Kg | 1837.5 | 798 | 1,466,325 |
Triturado de 3/4" x 1 m3 | 4.41 | 150,500 | 663,705 |
Agua para la obra 1 litro | 997.5 | 36 | 36,309 |
Mezcladora 1 bulto, alquiler x hora | 2.4 | 7,150 | 17,160 |
Cuadrilla 7 (8 obreros) x jornal | 0.35 | 578,347 | 202,421 |
Acero G-60 x 1 Kg | 1300 | 5,200 | 6,760,000 |
Valor Adicional: | 9,425,276 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| $50,000 |
| $190,000 |
| $96,642,307 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 51.58 | 533,055 | 27,494,990 |
Arena lavada de río 1 m3 | 30.32904 | 95,019 | 2,881,835 |
Cemento 1 Kg | 18955.65 | 798 | 15,126,609 |
Triturado de 3/4" x 1 m3 | 45.49356 | 150,500 | 6,846,781 |
Agua para la obra 1 litro | 10290.21 | 36 | 374,564 |
Mezcladora 1 bulto, alquiler x hora | 24.7584 | 7,150 | 177,023 |
Cuadrilla 7 (8 obreros) x jornal | 3.6106 | 578,347 | 2,088,180 |
Acero G-60 x 1 Kg | 2170 | 5,200 | 11,284,000 |
Cuadrilla de albañileria x 1 Hora | 800 | 24,504 | 19,603,511 |
Oficial de construcción x hora | 800 | 15,397 | 12,317,250 |
Ayudante de construcción x 1 hora | 800 | 9,108 | 7,286,261 |
Valor Adicional: | 58,382,502 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 5 | 533,055 | 2,665,276 |
Arena lavada de río 1 m3 | 2.94 | 95,019 | 279,356 |
Cemento 1 Kg | 1837.5 | 798 | 1,466,325 |
Triturado de 3/4" x 1 m3 | 4.41 | 150,500 | 663,705 |
Agua para la obra 1 litro | 997.5 | 36 | 36,309 |
Mezcladora 1 bulto, alquiler x hora | 2.4 | 7,150 | 17,160 |
Cuadrilla 7 (8 obreros) x jornal | 0.35 | 578,347 | 202,421 |
Acero G-60 x 1 Kg | 1300 | 5,200 | 6,760,000 |
Valor Adicional: | 9,425,276 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| $1,346,500 |
| $8,666 |
| $660,000 |
| $44,047 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 0.2 | 20,300 | 4,060 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 0.05 | 30,700 | 1,535 |
Codo PVC 90° presión de 1/2" x 10 unidades | 0.1 | 45,000 | 4,500 |
Soldadura para PVC 1/4 de galón | 0.04 | 53,500 | 2,140 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.015 | 77,000 | 1,155 |
Valor Adicional: | 13,390 |
| $273,000 |
| $404,539,438 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 418 | 3,900 | 1,630,200 |
Salario mínimo mensual vigente, base | 1.254 | 1,300,000 | 1,630,200 |
Levantamiento topográfico hasta 1,000 m2 | 2 | 2,600,000 | 5,200,000 |
Salario mínimo mensual vigente, base | 4 | 1,300,000 | 5,200,000 |
Replanteo Arquitectónico X 1 m2 | 418 | 10,038 | 4,195,736 |
Cuerda de Nylon 100 m x 0,50 mm | 20.9 | 50,900 | 1,063,810 |
Estaca de Madera Ø=0.05 L=0.60 m | 209 | 6,100 | 1,274,900 |
| 4.18 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 6.8552 | 24,504 | 167,982 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 68.9282 | 24,504 | 1,689,043 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 418 | 28,597 | 11,953,605 |
Salario diario vigente | 275.88 | 43,329 | 11,953,605 |
Estudio de suelos y geotecnia desde | 2 | 4,147,000 | 8,294,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 6 | 650,000 | 3,900,000 |
Ensayo SPT | 2 | 247,000 | 494,000 |
Informe Geotécnico y recomendaciones de construcción | 2 | 1,950,000 | 3,900,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 2 | 11,001 | 22,002 |
Salario diario vigente | 0.5078 | 43,329 | 22,002 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 418 | 13,520 | 5,651,360 |
Diseño hidráulico de edificio x 1 m2 | 418 | 6,760 | 2,825,680 |
Diseño sanitario de edificio x 1 m2, servicio | 418 | 6,760 | 2,825,680 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 418 | 16,000 | 6,688,000 |
Valor Adicional: | 43,634,903 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 20 | 58,492 | 1,169,840 |
Cuadrilla de albañileria x 1 Hora | 4.34 | 24,504 | 106,349 |
Cuadrilla de albañileria x 1 Hora | 43.4 | 24,504 | 1,063,490 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 1,169,840 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 6 | 484,450 | 2,906,700 |
Punto agua fria PVC 1/2" | 36 | 44,047 | 1,585,674 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 7.2 | 20,300 | 146,160 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 1.8 | 30,700 | 55,260 |
Codo PVC 90° presión de 1/2" x 10 unidades | 3.6 | 45,000 | 162,000 |
Soldadura para PVC 1/4 de galón | 1.44 | 53,500 | 77,040 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.54 | 77,000 | 41,580 |
Instalación carpintería metálica x 1 m2 | 47.988 | 20,907 | 1,003,304 |
Instalación carpintería metálica x 1 m2 | 4.7988 | 20,907 | 100,330 |
Tubo 1" x 6 m RDE 13.5 | 30 | 63,000 | 1,890,000 |
Valor Adicional: | 6,382,374 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 6 | 1,077,612 | 6,465,671 |
Sanitario One Piece Galio Blanco | 6 | 974,000 | 5,844,000 |
Instalación de aparatos sanitarios x unidad | 6 | 103,612 | 621,671 |
Punto desagüe sanitario pvc 4" | 30 | 68,312 | 2,049,362 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 5.1 | 78,000 | 397,800 |
Cuadrilla de albañileria x 1 Hora | 60 | 24,504 | 1,470,263 |
Limpiador para PVC 1/4 de galón | 1.128 | 99,000 | 111,672 |
Soldadura para PVC DE 1/4 de Galón | 0.939 | 74,150 | 69,627 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 8 | 207,000 | 1,656,000 |
Tubería PVC sanitaria 4" | 20 | 156,100 | 3,122,000 |
Valor Adicional: | 13,293,033 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 12 | 492,210 | 5,906,520 |
Agua para la obra 1 litro | 2148 | 36 | 78,187 |
Arena lavada de río 1 m3 | 9.072 | 95,019 | 862,012 |
Cemento 1 Kg | 3780 | 798 | 3,016,440 |
Triturado de 3/4" x 1 m3 | 9.072 | 150,500 | 1,365,336 |
Mezcladora 1 bulto, alquiler x hora | 12 | 7,150 | 85,800 |
Cuadrilla 7 (8 obreros) x jornal | 0.84 | 578,347 | 485,811 |
Oficial de construcción x hora | 0.84 | 15,397 | 12,933 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 16 | 818,067 | 13,089,074 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 16 | 533,055 | 8,528,884 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 47.36 | 13,000 | 615,680 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 2.4 | 155,000 | 372,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 5.76 | 10,000 | 57,600 |
| 20.96 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 130.4 | 24,504 | 3,195,372 |
Cuadrilla de albañileria x 1 Hora | 13.04 | 24,504 | 319,537 |
Acero G-60 x 1 Kg | 1200 | 5,200 | 6,240,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 28 | 533,055 | 14,925,547 |
Arena lavada de río 1 m3 | 16.464 | 95,019 | 1,564,393 |
Cemento 1 Kg | 10290 | 798 | 8,211,420 |
Triturado de 3/4" x 1 m3 | 24.696 | 150,500 | 3,716,748 |
Agua para la obra 1 litro | 5586 | 36 | 203,330 |
Mezcladora 1 bulto, alquiler x hora | 13.44 | 7,150 | 96,096 |
Cuadrilla 7 (8 obreros) x jornal | 1.96 | 578,347 | 1,133,560 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4 | 858,441 | 3,433,763 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 4 | 533,055 | 2,132,221 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.04 | 155,000 | 6,200 |
Durmiente ordinario 0,04x0.04x3,00 m. | 4 | 30,000 | 120,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 4 | 36,500 | 146,000 |
Vara clavo 3m | 0.68 | 20,100 | 13,668 |
Cuadrilla de albañileria x 1 Hora | 36 | 24,504 | 882,158 |
Cuadrilla de albañileria x 1 Hora | 3.6 | 24,504 | 88,216 |
Vibrador eléctrico de aguja para concreto x hora | 6 | 7,550 | 45,300 |
Valor Adicional: | 43,594,904 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 486 | 232,618 | 113,052,303 |
Sistema, Panel x 1 m2 x 0.04 m | 510.3 | 56,500 | 28,831,950 |
Malla plana RG2 | 194.4 | 5,350 | 1,040,040 |
Malla RGU 80 | 243 | 6,500 | 1,579,500 |
Malla angular RG1 | 243 | 6,700 | 1,628,100 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 26.73 | 473,449 | 12,655,297 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 125.388 | 31,013 | 3,888,633 |
Cuadrilla de instalaciones x 1 Hora | 73.2888 | 26,955 | 1,975,487 |
Cuadrilla de instalaciones x 1 Hora | 732.888 | 26,955 | 19,754,870 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2430 | 5,200 | 12,636,000 |
Transporte 1 tonelada x 1 kilómetro | 19.44 | 3,900 | 75,816 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 24.3 | 232,618 | 5,652,615 |
Muro panel doble cara x 1 m2 | 3.1104 | 232,618 | 723,535 |
Valor Adicional: | 113,052,303 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 400 | 90,690 | 36,275,966 |
Acero G-60 x 1 Kg | 3960 | 5,200 | 20,592,000 |
Pintuco Anticorrosivo rojo | 72 | 95,000 | 6,840,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 48 | 34,650 | 1,663,200 |
Cuadrilla de albañileria x 1 Hora | 266.4 | 24,504 | 6,527,969 |
Cuadrilla de albañileria x 1 Hora | 26.64 | 24,504 | 652,797 |
Teja termoacustica x 1 m2, suministro e instalación | 456 | 198,448 | 90,492,418 |
Teja termoacústica 3 m x 0.78 m | 194.8944 | 393,120 | 76,616,887 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 94.9848 | 93,400 | 8,871,580 |
Andamio Tubular estandar con tijeras alquiler por día | 22.8 | 47,300 | 1,078,440 |
Cuadrilla de instalaciones x 1 Hora | 11.4 | 26,955 | 307,285 |
Cuadrilla de instalaciones x 1 Hora | 114 | 26,955 | 3,072,850 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 91.2 | 5,200 | 474,240 |
Transporte 1 tonelada x 1 kilómetro | 18.24 | 3,900 | 71,136 |
Valor Adicional: | 126,768,384 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 20 | 140,813 | 2,816,268 |
Cascarilla de arroz x bulto 45 Kg | 5 | 155,000 | 775,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 1.5 | 91,000 | 136,500 |
Plántula aguacate | 20 | 33,250 | 665,000 |
Tierra negra abonada x 1 m3 | 4 | 235,000 | 940,000 |
Pala redonda No. 4 mango plástico | 0.1 | 63,000 | 6,300 |
Cuadrilla de instalaciones x 1 Hora | 10 | 26,955 | 269,548 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4 | 5,200 | 20,800 |
Transporte 1 tonelada x 1 kilómetro | 0.8 | 3,900 | 3,120 |
Valor Adicional: | 2,816,268 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 25400000 | 1 | 25,400,000 |
Valor Adicional: | 25,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 12400000 | 1 | 12,400,000 |
Valor Adicional: | 12,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 12400000 | 1 | 12,400,000 |
Valor Adicional: | 12,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 2356000 | 1 | 2,356,000 |
Valor Adicional: | 2,356,000 |
| $187,350 |
| $546,084,492 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 418 | 3,900 | 1,630,200 |
Salario mínimo mensual vigente, base | 1.254 | 1,300,000 | 1,630,200 |
Levantamiento topográfico hasta 1,000 m2 | 2 | 2,600,000 | 5,200,000 |
Salario mínimo mensual vigente, base | 4 | 1,300,000 | 5,200,000 |
Replanteo Arquitectónico X 1 m2 | 418 | 10,038 | 4,195,736 |
Cuerda de Nylon 100 m x 0,50 mm | 20.9 | 50,900 | 1,063,810 |
Estaca de Madera Ø=0.05 L=0.60 m | 209 | 6,100 | 1,274,900 |
| 4.18 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 6.8552 | 24,504 | 167,982 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 68.9282 | 24,504 | 1,689,043 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 418 | 28,597 | 11,953,605 |
Salario diario vigente | 275.88 | 43,329 | 11,953,605 |
Estudio de suelos y geotecnia desde | 2 | 4,147,000 | 8,294,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 6 | 650,000 | 3,900,000 |
Ensayo SPT | 2 | 247,000 | 494,000 |
Informe Geotécnico y recomendaciones de construcción | 2 | 1,950,000 | 3,900,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 2 | 11,001 | 22,002 |
Salario diario vigente | 0.5078 | 43,329 | 22,002 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 418 | 13,520 | 5,651,360 |
Diseño hidráulico de edificio x 1 m2 | 418 | 6,760 | 2,825,680 |
Diseño sanitario de edificio x 1 m2, servicio | 418 | 6,760 | 2,825,680 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 418 | 16,000 | 6,688,000 |
Valor Adicional: | 43,634,903 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 20 | 58,492 | 1,169,840 |
Cuadrilla de albañileria x 1 Hora | 4.34 | 24,504 | 106,349 |
Cuadrilla de albañileria x 1 Hora | 43.4 | 24,504 | 1,063,490 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 1,169,840 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 6 | 484,450 | 2,906,700 |
Punto agua fria PVC 1/2" | 36 | 44,047 | 1,585,674 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 7.2 | 20,300 | 146,160 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 1.8 | 30,700 | 55,260 |
Codo PVC 90° presión de 1/2" x 10 unidades | 3.6 | 45,000 | 162,000 |
Soldadura para PVC 1/4 de galón | 1.44 | 53,500 | 77,040 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.54 | 77,000 | 41,580 |
Instalación carpintería metálica x 1 m2 | 47.988 | 20,907 | 1,003,304 |
Instalación carpintería metálica x 1 m2 | 4.7988 | 20,907 | 100,330 |
Tubo 1" x 6 m RDE 13.5 | 30 | 63,000 | 1,890,000 |
Valor Adicional: | 6,382,374 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 6 | 1,077,612 | 6,465,671 |
Sanitario One Piece Galio Blanco | 6 | 974,000 | 5,844,000 |
Instalación de aparatos sanitarios x unidad | 6 | 103,612 | 621,671 |
Punto desagüe sanitario pvc 4" | 30 | 68,312 | 2,049,362 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 5.1 | 78,000 | 397,800 |
Cuadrilla de albañileria x 1 Hora | 60 | 24,504 | 1,470,263 |
Limpiador para PVC 1/4 de galón | 1.128 | 99,000 | 111,672 |
Soldadura para PVC DE 1/4 de Galón | 0.939 | 74,150 | 69,627 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 8 | 207,000 | 1,656,000 |
Tubería PVC sanitaria 4" | 20 | 156,100 | 3,122,000 |
Valor Adicional: | 13,293,033 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 2 | 23,113 | 46,226 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 0.4 | 94,000 | 37,600 |
Cuadrilla de albañileria x 1 Hora | 0.32 | 24,504 | 7,841 |
Cuadrilla de albañileria x 1 Hora | 0.032 | 24,504 | 784 |
Interruptor sencillo cuatro vías. Suministro e instalación | 66 | 23,313 | 1,538,643 |
Interruptor sencillo cuatro vías x 5 unidades | 13.2 | 95,000 | 1,254,000 |
Cuadrilla de albañileria x 1 Hora | 10.56 | 24,504 | 258,766 |
Cuadrilla de albañileria x 1 Hora | 1.056 | 24,504 | 25,877 |
Panel de 80W para sistema de energía solar | 8 | 920,900 | 7,367,200 |
Inversor de voltaje 300W | 2 | 297,050 | 594,100 |
Caja de control sistema de energía solar | 2 | 1,018,750 | 2,037,500 |
Batería estacionaria 90 Amperios para sistema energía solar | 8 | 731,600 | 5,852,800 |
Tablero trifásico con puerta de 24 circuitos | 2 | 321,000 | 642,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 8 | 395,000 | 3,160,000 |
Valor Adicional: | 21,238,469 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 12 | 492,210 | 5,906,520 |
Agua para la obra 1 litro | 2148 | 36 | 78,187 |
Arena lavada de río 1 m3 | 9.072 | 95,019 | 862,012 |
Cemento 1 Kg | 3780 | 798 | 3,016,440 |
Triturado de 3/4" x 1 m3 | 9.072 | 150,500 | 1,365,336 |
Mezcladora 1 bulto, alquiler x hora | 12 | 7,150 | 85,800 |
Cuadrilla 7 (8 obreros) x jornal | 0.84 | 578,347 | 485,811 |
Oficial de construcción x hora | 0.84 | 15,397 | 12,933 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 16 | 818,067 | 13,089,074 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 16 | 533,055 | 8,528,884 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 47.36 | 13,000 | 615,680 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 2.4 | 155,000 | 372,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 5.76 | 10,000 | 57,600 |
| 20.96 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 130.4 | 24,504 | 3,195,372 |
Cuadrilla de albañileria x 1 Hora | 13.04 | 24,504 | 319,537 |
Acero G-60 x 1 Kg | 1200 | 5,200 | 6,240,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 28 | 533,055 | 14,925,547 |
Arena lavada de río 1 m3 | 16.464 | 95,019 | 1,564,393 |
Cemento 1 Kg | 10290 | 798 | 8,211,420 |
Triturado de 3/4" x 1 m3 | 24.696 | 150,500 | 3,716,748 |
Agua para la obra 1 litro | 5586 | 36 | 203,330 |
Mezcladora 1 bulto, alquiler x hora | 13.44 | 7,150 | 96,096 |
Cuadrilla 7 (8 obreros) x jornal | 1.96 | 578,347 | 1,133,560 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4 | 858,441 | 3,433,763 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 4 | 533,055 | 2,132,221 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.04 | 155,000 | 6,200 |
Durmiente ordinario 0,04x0.04x3,00 m. | 4 | 30,000 | 120,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 4 | 36,500 | 146,000 |
Vara clavo 3m | 0.68 | 20,100 | 13,668 |
Cuadrilla de albañileria x 1 Hora | 36 | 24,504 | 882,158 |
Cuadrilla de albañileria x 1 Hora | 3.6 | 24,504 | 88,216 |
Vibrador eléctrico de aguja para concreto x hora | 6 | 7,550 | 45,300 |
Valor Adicional: | 43,594,904 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 486 | 232,618 | 113,052,303 |
Sistema, Panel x 1 m2 x 0.04 m | 510.3 | 56,500 | 28,831,950 |
Malla plana RG2 | 194.4 | 5,350 | 1,040,040 |
Malla RGU 80 | 243 | 6,500 | 1,579,500 |
Malla angular RG1 | 243 | 6,700 | 1,628,100 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 26.73 | 473,449 | 12,655,297 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 125.388 | 31,013 | 3,888,633 |
Cuadrilla de instalaciones x 1 Hora | 73.2888 | 26,955 | 1,975,487 |
Cuadrilla de instalaciones x 1 Hora | 732.888 | 26,955 | 19,754,870 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2430 | 5,200 | 12,636,000 |
Transporte 1 tonelada x 1 kilómetro | 19.44 | 3,900 | 75,816 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 24.3 | 232,618 | 5,652,615 |
Muro panel doble cara x 1 m2 | 3.1104 | 232,618 | 723,535 |
Valor Adicional: | 113,052,303 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 400 | 90,690 | 36,275,966 |
Acero G-60 x 1 Kg | 3960 | 5,200 | 20,592,000 |
Pintuco Anticorrosivo rojo | 72 | 95,000 | 6,840,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 48 | 34,650 | 1,663,200 |
Cuadrilla de albañileria x 1 Hora | 266.4 | 24,504 | 6,527,969 |
Cuadrilla de albañileria x 1 Hora | 26.64 | 24,504 | 652,797 |
Teja termoacustica x 1 m2, suministro e instalación | 456 | 198,448 | 90,492,418 |
Teja termoacústica 3 m x 0.78 m | 194.8944 | 393,120 | 76,616,887 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 94.9848 | 93,400 | 8,871,580 |
Andamio Tubular estandar con tijeras alquiler por día | 22.8 | 47,300 | 1,078,440 |
Cuadrilla de instalaciones x 1 Hora | 11.4 | 26,955 | 307,285 |
Cuadrilla de instalaciones x 1 Hora | 114 | 26,955 | 3,072,850 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 91.2 | 5,200 | 474,240 |
Transporte 1 tonelada x 1 kilómetro | 18.24 | 3,900 | 71,136 |
Valor Adicional: | 126,768,384 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Guardaescoba en ceramica porcelanato x 1m | 172 | 23,946 | 4,118,728 |
Agua para la obra 1 litro | 258 | 36 | 9,391 |
Arena lavada de río 1 m3 | 2.58 | 95,019 | 245,149 |
Pegacor max, 25 Kg, porcelanato | 4.3 | 85,500 | 367,650 |
Porcelanato sellado Beige x 1 m2 | 17.2 | 135,900 | 2,337,480 |
Cuadrilla de albañileria x 1 Hora | 43 | 24,504 | 1,053,689 |
Cuadrilla de albañileria x 1 Hora | 4.3 | 24,504 | 105,369 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 220 | 178,966 | 39,372,578 |
Agua para la obra 1 litro | 770 | 36 | 28,028 |
Pegacor max, 25 Kg, porcelanato | 55 | 85,500 | 4,702,500 |
Porcelanato sellado Beige x 1 m2 | 220 | 135,900 | 29,898,000 |
Cuadrilla de albañileria x 1 Hora | 176 | 24,504 | 4,312,772 |
Cuadrilla de albañileria x 1 Hora | 17.6 | 24,504 | 431,277 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 7.2 | 1,574,907 | 11,339,333 |
Puerta en aluminio con vidrio templado de 6 mm x 1m2 | 14.4 | 777,000 | 11,188,800 |
Instalación carpintería metálica x 1 m2 | 7.2 | 20,907 | 150,533 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 30 | 340,807 | 10,224,222 |
Ventana corrediza aluminio anodizado con vidrios x 1m2 | 30 | 319,900 | 9,597,000 |
Instalación carpintería metálica x 1 m2 | 30 | 20,907 | 627,222 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 680 | 12,828 | 8,723,176 |
Intervinil 5 galones, vinilo tipo 2 | 6.8 | 230,000 | 1,564,000 |
Cuadrilla de pintura x 1 hora | 14.96 | 38,563 | 576,900 |
Cuadrilla de pintura x 1 hora | 149.6 | 38,563 | 5,768,996 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 136 | 5,200 | 707,200 |
Transporte 1 tonelada x 1 kilómetro | 27.2 | 3,900 | 106,080 |
Geomembrana Instalación x 1 m2 | 240 | 13,477 | 3,234,579 |
Cuadrilla de albañileria x 1 Hora | 12 | 24,504 | 294,053 |
Cuadrilla de albañileria x 1 Hora | 120 | 24,504 | 2,940,527 |
Cepillera Attica | 6 | 28,850 | 173,100 |
Espejo de 2mm de espesor *1 m2 | 6 | 93,700 | 562,200 |
Argolla toalla attica | 6 | 36,250 | 217,500 |
División de baño corrediza | 6 | 550,000 | 3,300,000 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 2 | 505,085 | 1,010,170 |
Puerta de triplex | 16 | 342,450 | 5,479,200 |
Valor Adicional: | 87,754,786 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 20 | 140,813 | 2,816,268 |
Cascarilla de arroz x bulto 45 Kg | 5 | 155,000 | 775,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 1.5 | 91,000 | 136,500 |
Plántula aguacate | 20 | 33,250 | 665,000 |
Tierra negra abonada x 1 m3 | 4 | 235,000 | 940,000 |
Pala redonda No. 4 mango plástico | 0.1 | 63,000 | 6,300 |
Cuadrilla de instalaciones x 1 Hora | 10 | 26,955 | 269,548 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4 | 5,200 | 20,800 |
Transporte 1 tonelada x 1 kilómetro | 0.8 | 3,900 | 3,120 |
Valor Adicional: | 2,816,268 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 33400000 | 1 | 33,400,000 |
Valor Adicional: | 33,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 32400000 | 1 | 32,400,000 |
Valor Adicional: | 32,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 16200000 | 1 | 16,200,000 |
Valor Adicional: | 16,200,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 3107800 | 1 | 3,107,800 |
Valor Adicional: | 3,107,800 |
| $143,300 |
| $20,000 |
| $1,650,000 |
| $239,714,010 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 200 | 3,900 | 780,000 |
Salario mínimo mensual vigente, base | 0.6 | 1,300,000 | 780,000 |
| 0 | 0 | 0 |
4655" target="_blank"> | 2 | 0 | 0 |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 200 | 28,597 | 5,719,428 |
Salario diario vigente | 132 | 43,329 | 5,719,428 |
Estudio de suelos y geotecnia desde | 2 | 4,147,000 | 8,294,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 6 | 650,000 | 3,900,000 |
Ensayo SPT | 2 | 247,000 | 494,000 |
Informe Geotécnico y recomendaciones de construcción | 2 | 1,950,000 | 3,900,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 2 | 11,001 | 22,002 |
Salario diario vigente | 0.5078 | 43,329 | 22,002 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 200 | 13,520 | 2,704,000 |
Diseño hidráulico de edificio x 1 m2 | 200 | 6,760 | 1,352,000 |
Diseño sanitario de edificio x 1 m2, servicio | 200 | 6,760 | 1,352,000 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 200 | 16,000 | 3,200,000 |
Valor Adicional: | 22,726,960 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Punto desagüe sanitario pvc 4" | 30 | 68,312 | 2,049,362 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 5.1 | 78,000 | 397,800 |
Cuadrilla de albañileria x 1 Hora | 60 | 24,504 | 1,470,263 |
Limpiador para PVC 1/4 de galón | 1.128 | 99,000 | 111,672 |
Soldadura para PVC DE 1/4 de Galón | 0.939 | 74,150 | 69,627 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 2,049,362 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Panel de 80W para sistema de energía solar | 8 | 920,900 | 7,367,200 |
Inversor de voltaje 300W | 2 | 297,050 | 594,100 |
Caja de control sistema de energía solar | 2 | 1,018,750 | 2,037,500 |
Batería estacionaria 90 Amperios para sistema energía solar | 8 | 731,600 | 5,852,800 |
Valor Adicional: | 15,851,600 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 1200 | 5,200 | 6,240,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 28 | 533,055 | 14,925,547 |
Arena lavada de río 1 m3 | 16.464 | 95,019 | 1,564,393 |
Cemento 1 Kg | 10290 | 798 | 8,211,420 |
Triturado de 3/4" x 1 m3 | 24.696 | 150,500 | 3,716,748 |
Agua para la obra 1 litro | 5586 | 36 | 203,330 |
Mezcladora 1 bulto, alquiler x hora | 13.44 | 7,150 | 96,096 |
Cuadrilla 7 (8 obreros) x jornal | 1.96 | 578,347 | 1,133,560 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4 | 858,441 | 3,433,763 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 4 | 533,055 | 2,132,221 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.04 | 155,000 | 6,200 |
Durmiente ordinario 0,04x0.04x3,00 m. | 4 | 30,000 | 120,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 4 | 36,500 | 146,000 |
Vara clavo 3m | 0.68 | 20,100 | 13,668 |
Cuadrilla de albañileria x 1 Hora | 36 | 24,504 | 882,158 |
Cuadrilla de albañileria x 1 Hora | 3.6 | 24,504 | 88,216 |
Vibrador eléctrico de aguja para concreto x hora | 6 | 7,550 | 45,300 |
Valor Adicional: | 24,599,310 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 340 | 153,842 | 52,306,143 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 253.198 | 83,900 | 21,243,312 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 1.7 | 135,750 | 230,775 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 91.8 | 32,100 | 2,946,780 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 278.8 | 25,500 | 7,109,400 |
Cuadrilla de carpintería por hora | 28.322 | 38,130 | 1,079,904 |
Cuadrilla de carpintería por hora | 283.322 | 38,130 | 10,802,932 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 1700 | 5,200 | 8,840,000 |
Transporte 1 tonelada x 1 kilómetro | 13.6 | 3,900 | 53,040 |
Valor Adicional: | 52,306,143 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Teja termoacustica x 1 m2, suministro e instalación | 220 | 198,448 | 43,658,623 |
Teja termoacústica 3 m x 0.78 m | 94.028 | 393,120 | 36,964,287 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 45.826 | 93,400 | 4,280,148 |
Andamio Tubular estandar con tijeras alquiler por día | 11 | 47,300 | 520,300 |
Cuadrilla de instalaciones x 1 Hora | 5.5 | 26,955 | 148,252 |
Cuadrilla de instalaciones x 1 Hora | 55 | 26,955 | 1,482,516 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 44 | 5,200 | 228,800 |
Transporte 1 tonelada x 1 kilómetro | 8.8 | 3,900 | 34,320 |
Valor Adicional: | 43,658,623 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 0 | 99,900,000 | 0 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 680 | 12,828 | 8,723,176 |
Intervinil 5 galones, vinilo tipo 2 | 6.8 | 230,000 | 1,564,000 |
Cuadrilla de pintura x 1 hora | 14.96 | 38,563 | 576,900 |
Cuadrilla de pintura x 1 hora | 149.6 | 38,563 | 5,768,996 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 136 | 5,200 | 707,200 |
Transporte 1 tonelada x 1 kilómetro | 27.2 | 3,900 | 106,080 |
Geomembrana Instalación x 1 m2 | 240 | 13,477 | 3,234,579 |
Cuadrilla de albañileria x 1 Hora | 12 | 24,504 | 294,053 |
Cuadrilla de albañileria x 1 Hora | 120 | 24,504 | 2,940,527 |
Cepillera Attica | 6 | 28,850 | 173,100 |
Espejo de 2mm de espesor *1 m2 | 6 | 93,700 | 562,200 |
Argolla toalla attica | 6 | 36,250 | 217,500 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 60 | 141,747 | 8,504,799 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 60 | 130,000 | 7,800,000 |
Silicona transparente con fungicida 11 Onzas | 5.46 | 39,050 | 213,213 |
Cuadrilla de albañileria x 1 Hora | 15 | 24,504 | 367,566 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 22.05 | 5,200 | 114,660 |
Transporte 1 tonelada x 1 kilómetro | 2.4 | 3,900 | 9,360 |
Valor Adicional: | 21,415,354 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 20 | 140,813 | 2,816,268 |
Cascarilla de arroz x bulto 45 Kg | 5 | 155,000 | 775,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 1.5 | 91,000 | 136,500 |
Plántula aguacate | 20 | 33,250 | 665,000 |
Tierra negra abonada x 1 m3 | 4 | 235,000 | 940,000 |
Pala redonda No. 4 mango plástico | 0.1 | 63,000 | 6,300 |
Cuadrilla de instalaciones x 1 Hora | 10 | 26,955 | 269,548 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4 | 5,200 | 20,800 |
Transporte 1 tonelada x 1 kilómetro | 0.8 | 3,900 | 3,120 |
Valor Adicional: | 2,816,268 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 20000000 | 1 | 20,000,000 |
Valor Adicional: | 20,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 20000000 | 1 | 20,000,000 |
Valor Adicional: | 20,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 11600000 | 1 | 11,600,000 |
Valor Adicional: | 11,600,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 1900000 | 1 | 1,900,000 |
Valor Adicional: | 1,900,000 |
| $550,000 |
| $269,000 |
| $64,096,170,592 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 12800 | 1,000,000 | 12,800,000,000 |
Valor Adicional: | 12,800,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 10 | 2,600,000 | 26,000,000 |
Salario mínimo mensual vigente, base | 20 | 1,300,000 | 26,000,000 |
Replanteo Arquitectónico X 1 m2 | 48990 | 10,038 | 491,744,263 |
Cuerda de Nylon 100 m x 0,50 mm | 2449.5 | 50,900 | 124,679,550 |
Estaca de Madera Ø=0.05 L=0.60 m | 24495 | 6,100 | 149,419,500 |
| 489.9 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 803.436 | 24,504 | 19,687,708 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 8078.451 | 24,504 | 197,957,506 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 48990 | 14,000 | 685,860,000 |
Estudio de suelos y geotecnia desde | 20 | 4,147,000 | 82,940,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 60 | 650,000 | 39,000,000 |
Ensayo SPT | 20 | 247,000 | 4,940,000 |
Informe Geotécnico y recomendaciones de construcción | 20 | 1,950,000 | 39,000,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 48990 | 10,400 | 509,496,000 |
Salario mínimo mensual vigente, base | 391.92 | 1,300,000 | 509,496,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 48990 | 13,520 | 662,344,800 |
Diseño hidráulico de edificio x 1 m2 | 48990 | 6,760 | 331,172,400 |
Diseño sanitario de edificio x 1 m2, servicio | 48990 | 6,760 | 331,172,400 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 48990 | 16,000 | 783,840,000 |
Valor Adicional: | 3,242,225,063 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 42288 | 4,551 | 192,463,260 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 1057.2 | 182,050 | 192,463,260 |
Piloteadora, alquiler por Hora | 160 | 390,000 | 62,400,000 |
Salario mínimo mensual vigente, base | 48 | 1,300,000 | 62,400,000 |
Valor Adicional: | 254,863,260 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 2462606 | 5,200 | 12,805,551,200 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 12782 | 533,055 | 6,813,512,349 |
Arena lavada de río 1 m3 | 7515.816 | 95,019 | 714,145,321 |
Cemento 1 Kg | 4697385 | 798 | 3,748,513,230 |
Triturado de 3/4" x 1 m3 | 11273.724 | 150,500 | 1,696,695,496 |
Agua para la obra 1 litro | 2550009 | 36 | 92,820,328 |
Mezcladora 1 bulto, alquiler x hora | 6135.36 | 7,150 | 43,867,824 |
Cuadrilla 7 (8 obreros) x jornal | 894.74 | 578,347 | 517,470,151 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 2000 | 858,441 | 1,716,881,425 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 2000 | 533,055 | 1,066,110,522 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 20 | 155,000 | 3,100,000 |
Durmiente ordinario 0,04x0.04x3,00 m. | 2000 | 30,000 | 60,000,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 2000 | 36,500 | 73,000,000 |
Vara clavo 3m | 340 | 20,100 | 6,834,000 |
Cuadrilla de albañileria x 1 Hora | 18000 | 24,504 | 441,079,002 |
Cuadrilla de albañileria x 1 Hora | 1800 | 24,504 | 44,107,900 |
Vibrador eléctrico de aguja para concreto x hora | 3000 | 7,550 | 22,650,000 |
Valor Adicional: | 21,335,944,973 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 720 | 484,450 | 348,804,000 |
Punto agua fria PVC 1/2" | 4320 | 44,047 | 190,280,897 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 864 | 20,300 | 17,539,200 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 216 | 30,700 | 6,631,200 |
Codo PVC 90° presión de 1/2" x 10 unidades | 432 | 45,000 | 19,440,000 |
Soldadura para PVC 1/4 de galón | 172.8 | 53,500 | 9,244,800 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 64.8 | 77,000 | 4,989,600 |
Instalación carpintería metálica x 1 m2 | 5758.56 | 20,907 | 120,396,452 |
Instalación carpintería metálica x 1 m2 | 575.856 | 20,907 | 12,039,645 |
Tubo 1" x 6 m RDE 13.5 | 3600 | 63,000 | 226,800,000 |
Valor Adicional: | 765,884,897 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 720 | 1,077,612 | 775,880,524 |
Sanitario One Piece Galio Blanco | 720 | 974,000 | 701,280,000 |
Instalación de aparatos sanitarios x unidad | 720 | 103,612 | 74,600,524 |
Punto desagüe sanitario pvc 4" | 3600 | 68,312 | 245,923,463 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 612 | 78,000 | 47,736,000 |
Cuadrilla de albañileria x 1 Hora | 7200 | 24,504 | 176,431,601 |
Limpiador para PVC 1/4 de galón | 135.36 | 99,000 | 13,400,640 |
Soldadura para PVC DE 1/4 de Galón | 112.68 | 74,150 | 8,355,222 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 960 | 207,000 | 198,720,000 |
Tubería PVC sanitaria 4" | 2400 | 156,100 | 374,640,000 |
Valor Adicional: | 1,595,163,987 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 240 | 23,113 | 5,547,065 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 48 | 94,000 | 4,512,000 |
Cuadrilla de albañileria x 1 Hora | 38.4 | 24,504 | 940,969 |
Cuadrilla de albañileria x 1 Hora | 3.84 | 24,504 | 94,097 |
Interruptor sencillo cuatro vías. Suministro e instalación | 7920 | 23,313 | 184,637,158 |
Interruptor sencillo cuatro vías x 5 unidades | 1584 | 95,000 | 150,480,000 |
Cuadrilla de albañileria x 1 Hora | 1267.2 | 24,504 | 31,051,962 |
Cuadrilla de albañileria x 1 Hora | 126.72 | 24,504 | 3,105,196 |
Panel de 80W para sistema de energía solar | 960 | 920,900 | 884,064,000 |
Inversor de voltaje 300W | 240 | 297,050 | 71,292,000 |
Caja de control sistema de energía solar | 240 | 1,018,750 | 244,500,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 960 | 731,600 | 702,336,000 |
Tablero trifásico con puerta de 24 circuitos | 240 | 321,000 | 77,040,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 960 | 395,000 | 379,200,000 |
Valor Adicional: | 2,548,616,224 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 31080 | 153,842 | 4,781,396,866 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 23145.276 | 83,900 | 1,941,888,656 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 155.4 | 135,750 | 21,095,550 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 8391.6 | 32,100 | 269,370,360 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 25485.6 | 25,500 | 649,882,800 |
Cuadrilla de carpintería por hora | 2588.964 | 38,130 | 98,715,955 |
Cuadrilla de carpintería por hora | 25898.964 | 38,130 | 987,515,066 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 155400 | 5,200 | 808,080,000 |
Transporte 1 tonelada x 1 kilómetro | 1243.2 | 3,900 | 4,848,480 |
Valor Adicional: | 4,781,396,866 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 12 | 99,900,000 | 1,198,800,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 60500 | 12,828 | 776,106,100 |
Intervinil 5 galones, vinilo tipo 2 | 605 | 230,000 | 139,150,000 |
Cuadrilla de pintura x 1 hora | 1331 | 38,563 | 51,327,100 |
Cuadrilla de pintura x 1 hora | 13310 | 38,563 | 513,271,001 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 12100 | 5,200 | 62,920,000 |
Transporte 1 tonelada x 1 kilómetro | 2420 | 3,900 | 9,438,000 |
Geomembrana Instalación x 1 m2 | 40800 | 13,477 | 549,878,491 |
Cuadrilla de albañileria x 1 Hora | 2040 | 24,504 | 49,988,954 |
Cuadrilla de albañileria x 1 Hora | 20400 | 24,504 | 499,889,536 |
Cepillera Attica | 600 | 28,850 | 17,310,000 |
Espejo de 2mm de espesor *1 m2 | 1200 | 93,700 | 112,440,000 |
Argolla toalla attica | 600 | 36,250 | 21,750,000 |
Valor Adicional: | 2,676,284,591 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 800 | 140,813 | 112,650,731 |
Cascarilla de arroz x bulto 45 Kg | 200 | 155,000 | 31,000,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 60 | 91,000 | 5,460,000 |
Plántula aguacate | 800 | 33,250 | 26,600,000 |
Tierra negra abonada x 1 m3 | 160 | 235,000 | 37,600,000 |
Pala redonda No. 4 mango plástico | 4 | 63,000 | 252,000 |
Cuadrilla de instalaciones x 1 Hora | 400 | 26,955 | 10,781,931 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 160 | 5,200 | 832,000 |
Transporte 1 tonelada x 1 kilómetro | 32 | 3,900 | 124,800 |
Valor Adicional: | 112,650,731 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 5388000000 | 1 | 5,388,000,000 |
Valor Adicional: | 5,388,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 5388000000 | 1 | 5,388,000,000 |
Valor Adicional: | 5,388,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 2695140000 | 1 | 2,695,140,000 |
Valor Adicional: | 2,695,140,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 512000000 | 1 | 512,000,000 |
Valor Adicional: | 512,000,000 |
| $85,000 |
| $54,600 |
| $2,598,270 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa nueva de 1 planta y 209 m2 presupuesto de construcción | 0.009516 | 273,042,246 | 2,598,270 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 1.988844 | 3,900 | 7,756 |
Levantamiento topográfico hasta 1,000 m2 | 0.009516 | 2,600,000 | 24,742 |
Replanteo Arquitectónico X 1 m2 | 1.988844 | 10,038 | 19,963 |
Diseño arquitectónico de casa personalizada x 1 m2 | 1.988844 | 28,597 | 56,875 |
Estudio de suelos y geotecnia desde | 0.009516 | 4,147,000 | 39,463 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.009516 | 11,001 | 105 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.988844 | 13,520 | 26,889 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.988844 | 16,000 | 31,822 |
Excavación manual en conglomerado x 1 m3 | 0.09516 | 58,492 | 5,566 |
Kit Mueble para baño + lavamanos | 0.028548 | 484,450 | 13,830 |
Punto agua fria PVC 1/2" | 0.171288 | 44,047 | 7,545 |
Tubo 1" x 6 m RDE 13.5 | 0.14274 | 63,000 | 8,993 |
Sanitario suministro e instalación | 0.028548 | 1,077,612 | 30,764 |
Punto desagüe sanitario pvc 4" | 0.14274 | 68,312 | 9,751 |
Caja de inspección y distribución | 0.038064 | 207,000 | 7,879 |
Tubería PVC sanitaria 4" | 0.09516 | 156,100 | 14,854 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.009516 | 23,113 | 220 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.314028 | 23,313 | 7,321 |
Panel de 80W para sistema de energía solar | 0.038064 | 920,900 | 35,053 |
Inversor de voltaje 300W | 0.009516 | 297,050 | 2,827 |
Caja de control sistema de energía solar | 0.009516 | 1,018,750 | 9,694 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.038064 | 731,600 | 27,848 |
Tablero trifásico con puerta de 24 circuitos | 0.009516 | 321,000 | 3,055 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.038064 | 395,000 | 15,035 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.057096 | 492,210 | 28,103 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.076128 | 818,067 | 62,278 |
Acero G-60 x 1 Kg | 5.7096 | 5,200 | 29,690 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.133224 | 533,055 | 71,016 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.019032 | 858,441 | 16,338 |
Muro panel doble cara x 1 m2 | 2.312388 | 232,618 | 537,903 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 1.9032 | 90,690 | 172,601 |
Teja termoacustica x 1 m2, suministro e instalación | 2.169648 | 198,448 | 430,563 |
Guardaescoba en ceramica porcelanato x 1m | 0.818376 | 23,946 | 19,597 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 1.04676 | 178,966 | 187,335 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 0.0342576 | 1,574,907 | 53,953 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 0.14274 | 340,807 | 48,647 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 3.23544 | 12,828 | 41,505 |
Geomembrana Instalación x 1 m2 | 1.14192 | 13,477 | 15,390 |
Cepillera Attica | 0.028548 | 28,850 | 824 |
Espejo de 2mm de espesor *1 m2 | 0.028548 | 93,700 | 2,675 |
Argolla toalla attica | 0.028548 | 36,250 | 1,035 |
División de baño corrediza | 0.028548 | 550,000 | 15,701 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 0.009516 | 505,085 | 4,806 |
Puerta de triplex | 0.076128 | 342,450 | 26,070 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.09516 | 140,813 | 13,400 |
Aseo general para entrega de obra x metro cuadrado | 1.988844 | 3,042 | 6,049 |
Administración | 158917.2 | 1 | 158,917 |
Imprevistos | 154159.2 | 1 | 154,159 |
Utilidad | 77079.6 | 1 | 77,080 |
Unidad Monetaria | 14786.9124 | 1 | 14,787 |
Valor Adicional: | 2,598,270 |
| $4,549,600 |
| $175,500 |
| $423,000 |
| $447,000 |
| $46,300 |
| $91,700 |
| $260,000 |
| $100,000 |
| $1 |
| $750,000 |
| $2,699,900 |
| $2,600,000 |
| $236,880 |
| $195,000 |
| $100,000 |
| $75,000 |
| $40,000 |
| $40,000 |
| $13,213 |
| $472,080 |
| $5,044,000 |
| $74,900 |
| $465,000,000 |
| $76,000 |
| $168,000 |
| $90,000 |
| $8,741 |
| $970,895 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa en obra gris de 1 planta y 209 m2 presupuesto de construcción | 0.0048 | 202,269,719 | 970,895 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 1.0032 | 3,900 | 3,912 |
Levantamiento topográfico hasta 1,000 m2 | 0.0048 | 2,600,000 | 12,480 |
Replanteo Arquitectónico X 1 m2 | 1.0032 | 10,038 | 10,070 |
Diseño arquitectónico de casa personalizada x 1 m2 | 1.0032 | 28,597 | 28,689 |
Estudio de suelos y geotecnia desde | 0.0048 | 4,147,000 | 19,906 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.0048 | 11,001 | 53 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.0032 | 13,520 | 13,563 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.0032 | 16,000 | 16,051 |
Excavación manual en conglomerado x 1 m3 | 0.048 | 58,492 | 2,808 |
Kit Mueble para baño + lavamanos | 0.0144 | 484,450 | 6,976 |
Punto agua fria PVC 1/2" | 0.0864 | 44,047 | 3,806 |
Tubo 1" x 6 m RDE 13.5 | 0.072 | 63,000 | 4,536 |
Sanitario suministro e instalación | 0.0144 | 1,077,612 | 15,518 |
Punto desagüe sanitario pvc 4" | 0.072 | 68,312 | 4,918 |
Caja de inspección y distribución | 0.0192 | 207,000 | 3,974 |
Tubería PVC sanitaria 4" | 0.048 | 156,100 | 7,493 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.0288 | 492,210 | 14,176 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.0384 | 818,067 | 31,414 |
Acero G-60 x 1 Kg | 2.88 | 5,200 | 14,976 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.0672 | 533,055 | 35,821 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.0096 | 858,441 | 8,241 |
Muro panel doble cara x 1 m2 | 1.1664 | 232,618 | 271,326 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 0.96 | 90,690 | 87,062 |
Teja termoacustica x 1 m2, suministro e instalación | 1.0944 | 198,448 | 217,182 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.048 | 140,813 | 6,759 |
Aseo general para entrega de obra x metro cuadrado | 1.0032 | 3,042 | 3,051 |
Administración | 60960 | 1 | 60,960 |
Imprevistos | 29760 | 1 | 29,760 |
Utilidad | 29760 | 1 | 29,760 |
Unidad Monetaria | 5654.4 | 1 | 5,654 |
Valor Adicional: | 970,895 |
| $200,000 |
| $1,934,160 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00014968019 | 12,921,951,720 | 1,934,160 |
Terreno, predio, lote precio por 1m2 | 0.374200475 | 1,000,000 | 374,200 |
Levantamiento topográfico hasta 1,000 m2 | 0.00029936038 | 2,600,000 | 778 |
Replanteo Arquitectónico X 1 m2 | 1.22213875135 | 10,038 | 12,267 |
Diseño arquitectónico de edificios x 1 m2 | 1.22213875135 | 14,000 | 17,110 |
Estudio de suelos y geotecnia desde | 0.00059872076 | 4,147,000 | 2,483 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 1.22213875135 | 10,400 | 12,710 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.22213875135 | 13,520 | 16,523 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.22213875135 | 16,000 | 19,554 |
Excavación mecánica en conglomerado x 1 m3 | 1.09925131536 | 4,551 | 5,003 |
Piloteadora, alquiler por Hora | 0.0119744152 | 390,000 | 4,670 |
Acero G-60 x 1 Kg | 61.43383910246 | 5,200 | 319,456 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.31896848489 | 533,055 | 170,028 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.04984350327 | 858,441 | 42,788 |
Steel deck metaldeck grado 40 | 0.24442775027 | 451,000 | 110,237 |
Kit Mueble para baño + lavamanos | 0.0179616228 | 484,450 | 8,702 |
Punto agua fria PVC 1/2" | 0.1077697368 | 44,047 | 4,747 |
Tubo 1" x 6 m RDE 13.5 | 0.089808114 | 63,000 | 5,658 |
Sanitario suministro e instalación | 0.0179616228 | 1,077,612 | 19,356 |
Punto desagüe sanitario pvc 4" | 0.089808114 | 68,312 | 6,135 |
Caja de inspección y distribución | 0.0239488304 | 207,000 | 4,957 |
Tubería PVC sanitaria 4" | 0.059872076 | 156,100 | 9,346 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.0059872076 | 23,113 | 138 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.1975778508 | 23,313 | 4,606 |
Panel de 80W para sistema de energía solar | 0.0239488304 | 920,900 | 22,054 |
Inversor de voltaje 300W | 0.0059872076 | 297,050 | 1,779 |
Caja de control sistema de energía solar | 0.0059872076 | 1,018,750 | 6,099 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.0239488304 | 731,600 | 17,521 |
Tablero trifásico con puerta de 24 circuitos | 0.0059872076 | 321,000 | 1,922 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.0239488304 | 395,000 | 9,460 |
Muro drywall doble cara x 1 m2 | 0.7753433842 | 153,842 | 119,280 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 0.778336988 | 178,966 | 139,296 |
Ascensor 8 personas | 0.00029936038 | 99,900,000 | 29,906 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1.511769919 | 12,828 | 19,393 |
Geomembrana Instalación x 1 m2 | 0.44904057 | 13,477 | 6,052 |
Cepillera Attica | 0.014968019 | 28,850 | 432 |
Espejo de 2mm de espesor *1 m2 | 0.029936038 | 93,700 | 2,805 |
Argolla toalla attica | 0.014968019 | 36,250 | 543 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 1.8934544035 | 141,747 | 268,391 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0014968019 | 140,813 | 211 |
Administración | 47021.13360736 | 1 | 47,021 |
Imprevistos | 23521.34377736 | 1 | 23,521 |
Utilidad | 47021.13360736 | 1 | 47,021 |
Valor Adicional: | 1,934,160 |
| $268,800 |
| $220,000 |
| $85,000 |
| $70,000 |
| $169,950 |
| $699,800 |
| $104,000 |
| $202,500 |
| $65,000 |
| $2,839,250 |
| $300,000 |
| $755,000 |
| $112,550 |
| $104,000 |
| $14,299 |
| $229,900 |
| $45,000 |
| $759,000 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.